| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.6 CrAdmitted-Finance | -14.99% | ₹8.6 Cr | L1 | Admitted-Finance |
| 2 | L1₹8.6 CrAdmitted-Finance | -14.99% | ₹8.6 Cr | L1 | Admitted-Finance |
| 3 | L2₹9.1 Cr+₹43.7 L (5.06%)Admitted-Finance | -10.69% | ₹9.1 Cr+₹43.7 L (5.06%) | L2 | Admitted-Finance |
Tender Value
₹10.2 Cr
EMD Value
₹10.2 L
Closing Date
13 Dec 2025, 5:00 pmClosed
CCE RW Circle, Sundargarh
O/O The CCE RW Circle, Sundargarh
Construction of road from Sanroxy to Badgaon Luguda via Bakartola,Jadatola including Bridge under MMSY TRIP for the year 2024-25 in the district of Sundargarh.
2025_CERWI_122127_1
RWCCESNG-19 OF 2025-26
National Competitive Bid
Civil Works - Others
Percentage
540 days
Bonai
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹10.2 L
Yes
21 Jul 2026
28 Nov 2025
15 Dec 2025
28 Nov 2025
13 Dec 2025
28 Nov 2025
28 Nov 2025 - 12 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART-I FOR ROAD WORKS | |||||
| 2Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified materials with in all lifts and lead upto 1000 metres etc complete. | |||||
| 2.1 | A | 2,016 | Sqm | 6.03 | ₹12,156.48 |
| 3 | Re-working of scarified bituminous surface suitable after supplementing base materials with sand & compacting finished surface as per Technical Specification & as per Clause - 601.8.3.2 of MoSRT&H Specifications for road & Bridge works (Latest Revision) | 2,016 | Cum | 22.33 | ₹45,017.28 |
| 4 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 24,748 | Sqm | 8.44 | ₹2,08,873.12 |
| 5 | Construction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 24,474.14 | Cum | 201 | ₹49,19,302.14 |
| 6 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 318.16 | Cum | 74.79 | ₹23,795.19 |
| 7 | Construction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1,452.38 | Cum | 50.4 | ₹73,199.95 |
| 8 | Fine dressing and providing, laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts and leads upto 5 Km. and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 16,778.45 | Sqm | 28.93 | ₹4,85,400.56 |
| 9 | Providing and laying Granular Sub-base with Grading-III stone screening materials as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 3,305.58 | Cum | 2,585.12 | ₹85,45,320.97 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_567582.xls
BOQ • 0.42 MB
DTCN.pdf
Tender Documents • 2.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .