| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAdmitted-Finance SECOND FLOOR XX 116 ALUVA OPPOSITE PRIVATE BUS TERMINAL ERNAKULAM KERALA 683101 | ERNAKULAM | KERALA | 683101 | ₹19.9 L | L1 | Admitted-Finance |
| 2 | L2₹20.3 L+₹38,881 (1.95%)Admitted-Finance | ₹20.3 L+₹38,881 (1.95%) | L2 | Admitted-Finance |
| 3 | L3₹20.7 L+₹72,216 (3.62%)Admitted-Finance | ₹20.7 L+₹72,216 (3.62%) | L3 | Admitted-Finance |
| 4 | L4₹22.8 L+₹2.8 L (14.2%)Admitted-Finance | ₹22.8 L+₹2.8 L (14.2%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHAJAHAN K I L2 | CUEZONE INFRA PRIVATE LIMITED L1 | V AND A CONSTRUCTIONS L4 | NORAH ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of RCC floor, partition brick masonry, dyke, drainage pit etc., Details as per Sl No 1 in BOQ | 18 | m3 | 72,000 ₹84,960 Lowest | 81,000 ₹95,580 | 1,12,500 ₹1,32,750 | 99,000 ₹1,16,820 |
| 2.00 | Removing of existing EP plates of size 50cm x 30cm size (approx.) in Columns at locations of retrofitting area Details as per Sl No 2 in BOQ | 12 | Nos. | 12,000 ₹14,160 | 6,000 ₹7,080 | 7,800 ₹9,204 | 5,400 ₹6,372 Lowest |
| 3.00 | Dismantling of FRP Duct inside SEP, without damaging the existing structure by jag hammer.Details as per Sl No 3 in BOQ | 1 | Nos. | 2,500 ₹2,950 Lowest | 6,000 ₹7,080 | 8,000 ₹9,440 | 7,000 ₹8,260 |
| 4.00 | Providing and laying in position plain cement concrete mix 1:3:6 (1 cement, 3 coarse sand and 6 graded broken stone aggregate 40 -20mm nominal size Details as per Sl No 4 in BOQ | 8 | m3 | 72,000 ₹84,960 | 64,000 ₹75,520 | 68,000 ₹80,240 | 56,000 ₹66,080 Lowest |
| 5.00 | Providing & laying of Reinforced Cement Concrete RCC M25 grade (as per IS 456) ready mix concreteDetails as per Sl No 5 in BOQ | 18 | m3 | 1,98,000 ₹2,33,640 Lowest | 1,98,000 ₹2,33,640 Lowest | 2,34,000 ₹2,76,120 | 2,07,000 ₹2,44,260 |
| 6.00 | Supply & Laying reinforcement High yield strength deformed bars Fe 500 grade. Details as per Sl No 6 in BOQ | 1.5 | Ton | 1,87,500 ₹2,21,250 | 1,57,500 ₹1,85,850 Lowest | 1,65,000 ₹1,94,700 | 1,68,750 ₹1,99,125 |
| 7.00 | Providing shuttering / formwork using plywood with sufficient wooden runners or MS sheets Details as per Sl No 7 in BOQ | 20 | m2 | 24,000 ₹28,320 | 18,000 ₹21,240 Lowest | 25,000 ₹29,500 | 19,600 ₹23,128 |
| 8.00 | Providing masonry work using solid concrete block of standard size of 30cm x 20cm x 15cm / 30cm x 20cm x 10cm . Details as per Sl No 8 in BOQ | 8 | m3 | 80,000 ₹94,400 | 80,000 ₹94,400 | 84,000 ₹99,120 | 72,000 ₹84,960 Lowest |
| 9.00 | Providing plastering in CM 1:4 for wall, floor 12mm average thick, using M-sand Details as per Sl No 9 in BOQ | 80 | m2 | 56,000 ₹66,080 | 52,000 ₹61,360 | 55,200 ₹65,136 | 48,000 ₹56,640 Lowest |
| 10.00 | Supply, fabrication & erection of MS structural supports such as angle / channel..Details as per Sl No 10 in BOQ | 1.5 | Ton | 2,25,000 ₹2,65,500 | 2,25,000 ₹2,65,500 | 2,40,000 ₹2,83,200 | 2,17,500 ₹2,56,650 Lowest |
Tender Value
₹20.5 L
EMD Value
₹34,818
Closing Date
31 Jul 2026, 10:30 amClosed
V.A Anil kumar,DGM-Tecnical ( Purchase)
IREL (India) Limited, RED, Udyogamandal
Civil Work for Terbium Pilot Plant Facility at SEP
2026_IREL_283707_1
IREL/Udyogamandal/26-27/ PR/Work-17
Open Tender
Miscellaneous Works
Works
90 days
IREL (India) Limited, RED, Udyogamandal
Details as per Document
2 documents required · 2 mandatory
₹0
₹34,818
4 Sept 2026
10 Jul 2026
1 Aug 2026
10 Jul 2026
31 Jul 2026
10 Jul 2026
10 Jul 2026 - 29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of RCC floor, partition brick masonry, dyke, drainage pit etc., Details as per Sl No 1 in BOQ | 18 | m3 | - | - |
| 2 | Removing of existing EP plates of size 50cm x 30cm size (approx.) in Columns at locations of retrofitting area Details as per Sl No 2 in BOQ | 12 | Nos. | - | - |
| 3 | Dismantling of FRP Duct inside SEP, without damaging the existing structure by jag hammer.Details as per Sl No 3 in BOQ | 1 | Nos. | - | - |
| 4 | Providing and laying in position plain cement concrete mix 1:3:6 (1 cement, 3 coarse sand and 6 graded broken stone aggregate 40 -20mm nominal size Details as per Sl No 4 in BOQ | 8 | m3 | - | - |
| 5 | Providing & laying of Reinforced Cement Concrete RCC M25 grade (as per IS 456) ready mix concreteDetails as per Sl No 5 in BOQ | 18 | m3 | - | - |
| 6 | Supply & Laying reinforcement High yield strength deformed bars Fe 500 grade. Details as per Sl No 6 in BOQ | 1.5 | Ton | - | - |
| 7 | Providing shuttering / formwork using plywood with sufficient wooden runners or MS sheets Details as per Sl No 7 in BOQ | 20 | m2 | - | - |
| 8 | Providing masonry work using solid concrete block of standard size of 30cm x 20cm x 15cm / 30cm x 20cm x 10cm . Details as per Sl No 8 in BOQ | 8 | m3 | - | - |
| 9 | Providing plastering in CM 1:4 for wall, floor 12mm average thick, using M-sand Details as per Sl No 9 in BOQ | 80 | m2 | - | - |
| 10 | Supply, fabrication & erection of MS structural supports such as angle / channel..Details as per Sl No 10 in BOQ | 1.5 | Ton | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_330980.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .