Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.8 LAccepted-AOC VILLAGE DULET PO LEHRI TEHSIL SH NAINA DEVI JI DISTRICT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | 1 | Accepted-AOC L1 | |
| 2 | 2₹14.9 L+₹5,000 (0.34%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹16 L+₹1.1 L (7.38%)Rejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | 3 | Rejected-Finance 3 |
Tender Value
₹11.5 L
EMD Value
₹23,050
Closing Date
3 Aug 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Tarsooh and Lehri in Tehsil Sh. Naina Devi Ji District Bilaspur (SH Operation and maintenance of pumping machinery and distribution system for one year).
2024_HPIPH_90938_1
BLP-BLP-00736 NIT No. 5022-5119 dated 23/07/2024
Open Tender
Civil Works
Item Rate
365 days
Sub Division Bassi Section Tarsooh
Please refer Tender documents.
8 documents required · 8 mandatory
₹400
Yes
EE JSV Bilaspur
₹23,050
Yes
21 Sept 2024
24 Jul 2024
3 Aug 2024
24 Jul 2024
3 Aug 2024
24 Jul 2024
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Tarsooh and Lehri line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 1 No Booser stage pump house at Kala Kund 1No.pump house at Tarsooh 1Nopercolation well, WTP at 1st stage 10 Nos storage tank. Rising main: 3960 Rmt Booster stage and 1st stage=150 mm dia Distribution system:43 Km Pumping machinery: LWSS Tarsooh and Lehri stage 1x41 HP=82 HP(1x10=10HP) 1st stage 2x150=300HP. No of storage tanks: 10 Nos, 23No habtiaitons , Total working hours: 55 through , 10 Nos perons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No.
Parkash Chand Sharma
Manoj Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .