Tender Value
₹8.0 L
EMD Value
₹8,000
Closing Date
21 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Panchayat R & B Division, Vadodara
Construction of RCC Trimix Road at Tulsigaam Navi Vasahat to Canal, Taluka: Desar, Dist: Vadodara under New Gujarat Pattern 2025-26
354268
10 of 2026-2027
Open
Civil - All
Works
Vadodara
5 documents required · 5 mandatory
₹900
Executive Engineer, Panchayat (R and B) Division, Vadodara
₹8,000
9 Oct 2026
9 Oct 2026
9 Oct 2026
21 Oct 2026
9 Oct 2026
Name of work:- Construction of RCC Trimix Road at Tulsigaam Navi Vasahat to Canal,
Taluka: Desar, Dist: Vadodara under New Gujarat Pattern 2025-26
BILL OF QUANTITIES
Quantities Estimated Rates Total Amount
Quantities Estimated Rates Total Amount
Item estimated According to
Item of work Unit
No. but may be Estimated
more or less Quantities
Demolition including stacking of serviceable materilas
[1] 528.90 and disposal of unserviceable materials with all lead 1084.30 cu.m
and lift. (i) R.C.C. work
Providing and filling in foundation with ordinary
Cement concrete M-100 mix and providing necessary
vertical pin headers including formwork, vibrating,
ramming and curing complete.(More than 10 ton)
Providing TMT Bar FE 500D reinforcement for R.C.C.
[3] 516.00 work including bending, binding and placing in 77.29 Kg
position complete upto floor two level
Providing and laying contolled cement concret M-250
by trimix method and curing complete including
compacting with surface mechanical vibrator,
[4] 25.80 mechanical floater, chanelling formwork, grooving 5569.42 cu.m
including expantion joint and construction joint
including filling asphalt filler joint as per instruction of
Engineer in charge
Seven Lacs Ninety Nine Thousand Seven Hundered Seventeen Rupees and Thirty Two Paisa
I/We am/are willing to carry out the work at………………….% above/below percent(Should be written in figures and
words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated Amount put to tender Estimated Amount put to tender
In Words In Words
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
5. Credit of materials of Diversion & CD Work amount of Rs.0.00 must be recovered from Contractor's 1st R.A Bill.
Dated Signature Deputy Executive Engineer Divisional Accounts officer Executive Engineer
the Contractor. R & B (P) Sub Division R & B (P) Division R & B (P) Division
Savli Vadodara Vadodara
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
0.NIT Tulsigam Road.pdf
1.SBD Tulsigam Road.pdf
2.Schedule B (BOQ).pdf
6.Specification Index.pdf
7.Specification Aganwadi Tulsigam Road.pdf
8.Tulsipura Gaam Road Drawing.pdf
10.Testing Schedule.pdf
GR 1.pdf
GR 2.pdf
GR 03 New added 25-26.pdf
Performance Bond and Bitumen date.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .