ADD CITY ENGINEER , SOUTH ZONE
Under SBM (Swachh Bharat Mission) in South Zone Indrapuri Ward, renovation and repair work as per requirement in various municipal buildings, toilet blocks, pay and use and urinals as well as painting work. (ARC Tender)
278522
E tender notice no 18/2025-26 T No 620
Open
Civil - All
Works
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹24,999.99
19 Feb 2026
19 Feb 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
Sr.No. Qty Description Rate Unit Amount
1 Demolition incl. stacking of serviceable materials &
disposal of unserviceable materials with all lead and
lift.(Bldg.SOR.2021-2022)
5.00 (a) R.C.C. work (20.3,page 217) 698.25 Cmt
31.00 (b) Brick work in Cement mortar (20.11,page 217) 363.30 Cmt
70.00 (C) Plaster (CH NO. 20 ,20045,PG NO -186) 12.92 Smt
30.00 (d) Tiles or Stone flooring (I.No.20.23 I.C NO.-20005,
ch.20 P. NO.183) 31.50 Smt
12.00 (e) Sheet roofing (G.I. Or A.C.) (I.No.20.27 I.C NO.-
5.00 (f) Doors,Windows ventilators (wood/steel)(I.No.20.49 I.C
2 3.00 Dismantling barbed wire fencing / Chainlink Fencing
including making rolls and also including dismantling
fanning posts including all earth work concrete in
the base and making good the disturbed ground
stacking unseal materials as directed and disposing all the
unserviceable materials with all leads al lifts & carting to
AMC Store as directed by engg. in charge (SOR 2021-22
3 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead.(A) Loose or soft
soil(SOR 2021-22 I.C NO.-04001A, ch.04 P. NO.65)
15.00 (a) 0 to 1.5 mtr depth 77.28 Cmt
5.00 (b)1.5 to 3.0 mt. depth. 85.68 Cmt
4.00 (c)3.0 to 5.0 mt. depth 94.07 Cmt
4 10.00 Providing and laying cement concrete 1:4:8 (1 - Cement :
4-Coarse sand : 8-Graded Brick bats aggregate 40 mm
normal size) and curing complete excluding cost of form 2378.20 Cmt
work in (A) Foundation and Plinth (upto 10 ton) (Bldg.Sor
10.00 (B)Provdg. & laying cement concrete 1:4:8 (1 cement :
coarse sand : 8 hand broken stone aggregates 40 mm
nominal size) and curing complete excluding cost of form 2062.50 Cmt
work in Foundation and plinth. (Bldg.Sor 2021-22,item
5 Providing and laying controlled cement concrete M-200
and curing complete, excluding the cost of form work and
reinforcement for reinforced concrete work in: (Bldg.Sor
10.00 (A) Foundations, footings, base of columns, and mass
concrete.(Item no.5.8.2, 05024AA) 3874.20 Cu.M.
5.00 (B) Walls from top of foundations/level up to floor two level.
1.00 (C) Slabs, landings, shelves, balconies, lintels, beams,
girders and cantilever upto floor two level.(Item no.5.8.2, 4187.70 Cu.M.
1.00 (D) Columns, pillars, posts and struts upto floor two level.
6 50.00 Providing & Applying Tri mix with De watering Machine
floter machine on constructed RCC work including
Machine & Labour etc Comp as directed (approved rate) 54.00 Smt
7 2.00 Filling Available Excavated Earth (Excluding Rock) In
Trenches,Plinth,Sides Of Foundations Etc.In Layers Not
Exceeding 20 Cm.In Depth Consolidation Each 90.85 Cu.m
Deposited Layer By Ramming And Watering.(SOR 2021-
8 Providing form work in ordinary timber planking so as to
give a rough finish including centering, shuttering, strutting
and propping etc. height of propping and centering below
supporting floor to celling not exceeding 4 M & removal of
the same for in situ reinforced or plain concrete work
in(Bldg.Sor 2021-22 CH. NO 9, I. NO 9.1)
3.00 (A) Foundation, footings, bases of columns etc. and mass
5.00 (B) Flat surface such as soffits of slabs, landing and the
like (I) Floors etc. 200 mm in thickness. 168.00 Sq.M.
5.00 (C) Vertical surface such as walls (any thickness) partitions
and the like including attached but tresses & string course 153.30 Sq.M.
5.00 (D) Columns Pillars Posts and struts.(1) Square
Rectangular Polygonal in plan. 198.45 Sq.M.
9 Provdg. & laying cement concrete 1:2:4 (1 cement :
coarse sand : 4 graded stone aggregates 20 mm nominal
size) and curing complete excluding cost of form work and
reinforcement for reinforced concrete work in
(P.74,Bldg.Sor 2021-22 CH. NO 5, I. NO 5.4.1)
3.00 (A) Foundations, footing, of columns and mass concrete 3624.50 Cu.M.
10.00 (B) Slabs, landings, shelves, balconies, lintels, beams,
girders and cantilever upto floor two level. 3687.20 Cu.M.
10.00 (C) Columns, Pillars posts and struts upto floor two
level. 3687.20 Cu.M.
10 120.00 Providing TMT Bar FE 415 reinforcement for R.C.C. work
including bending,binding and placing in position complete
upto floor two level.(Bldg.Sor 2021-22,item no.5.4.11, 62.61 Kg
11 10.00 Brick Work Using Common Burnt Clay Building Bricks
Having Crushing Strength Not Less Than 35 Kg/Sq. Cm.
In Cement Mortar 1:6 (1 Cement : 6 Fine Sand) (A) In 2814.90 Cmt
foundation and Plinth(Bldg.Sor 2021-22,item no.6.13,
5.00 Extra for brick work in super structure above plinth level
upto floor two level (B) Conventional (I.C.NO 06006C) 181.50 Cmt
12 10.00 .Half Brick Masonry In Common Burnt Clay Building Bricks
Having Crushing Strength Note Less Than 35 Kg/Sq. Cm.
In Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) In 407.00 Smt
Foundation and plinth (Bldg.Sor 2021-22,item no.6.3,
5.00 Extra for half brick masonry in super structure above plinth
level upto floor two level. (B) Conventional (I.C NO 35.20 Smt
13 30.00 Providing cement plaster in single coat on brick/concrete
wall for interior/exterior plastering upto any floor level
finished even and smooth in CM 1:3 incl. finishing with
floating coat of neat cement slurry, with necessary 116.50 Smt
scaffolding etc. complete(Bldg.Sor 2021-22,item no.17.6,
14 35.00 Providing 20mm thick double coat sand face/mala cement
plaster on interior brick/concrete work for plastering
comprising o f base coat of 12mm thick cement plasterin
cement mortar(1Cement:4coarsesand) in rough finishing
and 8mm thick t op coat of cement
mortar1:2(1Cement:2Coarsesand) finished with trovel
including scaffoldingcuring etc. complete.(Bldg.Sor 2021-
15 7.00 Providing & Applying Cement Popada Plaster In
Cement Mortar In 1 : 3 Incl. Cleaning Surface Before
Plastering Rate Also Incl. Scafloding, Watering , And 120.00 Smt
Neat Finishing Etc. Comp. As Dire.(N.S./ARC)
16 5.00 Providing and applying fibere reinforced cementitious
micro concrete work in cellings and beams incl.mixture of
CEMSCREED HM (F) fair mate company material, FBR
bonding agent material with water in suItable proportion
anti corrosive treatment on exposed beam,celling steel
bars with safeCore R incl.all kind of labour
etc.comp.including three coat of white wash.(Approved
17 50.00 Providing And Laying Polished Kota Stone Slab
Flooring Over 20 Mm. (Average) Thick Base Of Cement
Mortar 1:6 (1 Cement : 6 Coarse Sand) Or Lime
Mortar 1:1.5 Laid Over And Joined With Grey Cement
Slurry mixed with pigmentt omatchtheshade of slab
including rubbing and polishing
etc.complete.(A)25mmthick. (Bldg.Sor 2021-22
18 50.00 Labour Work for moulding the polish kota stone surface
rate also including provding cutting and grinder machine 150.00 Rmt
for molding work etc.complete as directed.(app.rate)
19 10.00 Labour work for Polish kota stone surface rate also
including providing cutting and grinder machine for molding 64.00 Smt
work etc comlete as directed.(app. rate)
20 50.00 Providing And Laying Cement Concrete Flooring For
I.P.S.1:2:4 (For Indian Patent Stones) (1 Cement:
Coarse Sand:4 Graded Stone Aggregate 20 Mm.
Nominal Size) Lain In Layer Finished With A Floating 198.45 Smt
Coat Of Net Cement.(40 Mm Th.)(SOR 2021-22
P.160,Item No.14.71,14015AA)
21 20.00 Additional Rate For Providing Water Proofing Solution in
22 100.00 P & L 24"x24" vitrified 8mm thick tile flooring over 20mm
(average) base of cement mortar
1:6(1cement:6coarsesand) on new surface or fixing on
existing flooring by adhesive material including
dismentaling of existing flooring and jointed with color
cement slurry including finis ed with flush pointing &
cleaning the surfaceetc.complete for anti skit(SOR2021-
23 100.00 P & L 24"x24" vitrified 8mm thick tile flooring over 20mm
(average) base of cement mortar
1:6(1cement:6coarsesand) on new surface or fixing on
existing flooring by adhesive material including
dismentaling of existing flooring and jointed with color
cement slurry including finis ed with flush pointing &
cleaning the surfaceetc.(sor 2021-22 P.161,Item
24 20.00 Providing and Fixing pvc.Door (sintex door-equivalent)
with necessary alluminium fitting with EL-7 section frame 1617.00 Sq.M.
(Approved Rate as per ARC)
25 5.00 Providing & laying polish kota stone (25 mm th,) Sandwich
platform. Work incl. provdg good quality & even shade
polish kota stone of required size having uniform thickness. 850.00 Smt
Work also incl. providing nece. Dismentling of brick work
for making jari to support the etc.comp.(app rate)
26 10.00 P/F glass of 4 mm thik for vent lowers and window with
wooden border patti as per instruction of eng. In 150.00 No
chage.(app.rate)
27 5.00 Making hole in brick wall & all damaged work shall be well
repaired as per inst. etc. comp 100.00 No
28 10.00 Provdg. & fixing rubber plug for sink or wash basin. (SOR
29 5.00 Providing and fixing 30mm thick FACTORY MADE SOLID
BOTH SIDE PRELAM PANEL PVC DOOR SHUTTER
consisting of frame made out of M.S. tubes of 19 gauge
thickness and size of 19mm x 19mm for stiles, top and
bottom rails. M.S. frame shall have a coat of steel primer
of approved makde and manufactures. M.S frame covered
with 5mm thick heat moulded prelim PVC ‘C’ channel of siz
30mm thickness, 70 mm width of which 50mm shall be flat
and 20mm shall be tapered in 45 degree Angle on either
side forming stiles, and 5mm thick, 95mm wide pream PVC
sheet out of which 75mm shall be flat and 20mm shall be
tapered in 45 degree on the inner side ot form top and
bottom rail and 115mm wide prelim PVc sheet out of which
75nmm shall be flat and 20mm shall be tapered on both 2214 Smt
side to form lock rail, Top, bottom and lock rails shall be
provided either side of the panel. 10mm (5mm x 2) thick
20mm wide cross PVC sheet shall be provided as gap
insert for top rail and bottom rails. Panelling of 5mm thck
both side prelim sqm 2214.00 PVC sheet to be fitted in the
M.S. frame welded, sealed to the stiles and rails with 7mm
(5mm + 2 mm) thick x 15mm wide PVC sheet beading on
inner side, and joined togeth with solvent cement adhesive.
An additional 5mm thick PVC strip of 20mm width is to be
stuck on the interior side of the ‘C” chanel using PVC
solvent adhesive etc. complete as per direction of
Engineering in charge, manufacture’s specification and
rawing.(SOR 2021-22 I.C no-10044)
30 5.00 Providing and fixing approved standard brand factory
made PVC door FRAME of size 50 x 47 mm with a wall
thickness of 5 mm made out of extruded 5 mm rigid
PVC foam sheet mitred at corners and jointed with
Nos. of 150 mm long brackets of 15 x 15 mm
M.S.square tube the vertical door profiles to be
reinforced with 19 x 9 mm M.S.square tube of 19 guage,
EPDM rubber gasket weather seal to be provided
through out the frame. The door frame to be fixed to the
wall using M.S.screws of 65/100 mm size etc.complete
as per manufacturers specifications and direction of
Engineering in charge incl. medium grade aluminium
hardware all octroi, tax charges etc.complete (SOR 2021-
31 10.00 Providing and fixing pre laminated PVC rigid foam sheet
manufactured by approved standard brand wall paneling
of thickness 5 mm stuck on inner frame work of 35 mm
wide strips of 5 mm thick PVC rigid foam sheet. The strips
should have in their centre a groove of 6 mm width and
mm depth for sinking the head of the screw used to fix the
strips to the wall and should be placed vertically at equal 1350.00 Smt
intervals of 405 / 407 mm center to center. The PVC strips
to be fixed to the wall using 65 mm long M.S. screws
through the groove in the strip by using PVC fasteners. the
distance between two screws shall not be more then
mm. A groove of 2 mm to be left at the joint of two panels
for aesthetic look.
32 Providing and fixing 35 mm th. Shutters for doors windows
& clearstory windows incl. wood frames as specified
cm. x 7cm. size incl. anodised alluminium fixtures and
fastenings including primer coat of approved quality and
two coats of oil paint etc. complete.(SOR.2021-22
,ch.no.10, it code 10032a, 10032b, 10032c)
a 5.00 (I) Fully glazed 4248.06 Sq. M.
b 5.00 (II)Fully panelled 5042.98 Sq. M.
c 3.00 (III) Partly panelled & partly glazed. 4645.52 Sq. M.
33 100.00 Providing and laying white glazed tiles 6mm thick in
flooring treads of steps and landing laid on a bed of 12mm
thick cement mortar 1:3 (1-cement : 3-coarse sand ) 726.60 Smt
finishing with flush pointing in white cement.(SOR 2021-
22P.157,Item No.14.29,14008AA)
34 5.00 Providing And Laying Glazed Tiles 6 Mm Thick In
skirting risers of Steps and dedo 10Mm Thick Cement
plaster 1:3 (1Cement : 3Coarse Sand)Finished With 696.15 smt
Flush Pointing In White Cement slurry.(SOR 2021-22 PG
35 50.00 Providing and laying coloured glazed tiles of the size
skirting, risers of steps and dedo on 10 mm. thick cement 951.30 smt
plaster 1:3 (1 cement : 3 coarse sand) & jointed with white
cement slurry.(SOR 2021-22 PG NO-191,14036)
36 Providing and fixing rough cast wired glass 6 mm thick
bedded in putty and thick with wooden beading including
the cost of wooden beadings of Indian teak wood and
necessary cutting of glass. (SOR 2021-22 PG NO-
10.00 (C) wired figured glass. 659.58 Smt
37 3.00 Supplying and fixing Nimbhada ladi 37 to 50 mm thick for
walk-way, covering the activity of excavation, ramming,
Laying on sand bedding as per requirement to fix the 236.61 Smt
Nibhada Stone in Line & Level with cement pointing in
cement mortar 1:2 etc complete as directed.
38 120.00 Labour work for fixing above or any interlocking
blocks/nimbhada on up to 50mm th sand
bedding,levelling,watering anf fixing. Rate incl. average
30cm depth for excavation and or filling,carting away 69.64 Smt
debries/excavated material up to 5 km and cleaning the
site etc.comp. as directed.I00194
39 150.00 Providing & Laying China Mosaic Flooring On Terrace
With 6Mm Th.White Or Coloured Glazed Tiles Chips Of
Mini.25 To 35Mm Approved.Square Or Rectangular Shape
& Fixing It.Before Start The Work Remove All Existing
Flooring & Open Old Slab Surface With Wire Brush & Fill
Crack If Shown With Water Proof Material.Than For
Making Level Gps.Work Done In Mini.45 To 50 Mm Th.&
Fixing.China Mosaic In Cm 1:3 With Neat Cement Slurry 700.00 Smt
At Top & Filling The Gap With White Or Colour Cement
With Finishing Smooth Surface & Even Shade
Incl.Cleaning Of All Dirt,Dust & Other Foreign
Matter.Rate Including For Making Colour Patta,Round
Vata With Fixing Neccessary Water Spout Opening Gap
Etc.Comp.As Directed.(As per A.R.C)
40 10.00 Providing Cement Vata (10 Cms X 10 Cms)Size Quarter
Round In Cement Mortar 1:1 Including Near Cement
Finishing, Watering Etc. Complete.(SOR 2021-
41 30.00 Providing, supplying and fixing precast C.C. blocks (M-20)
edge kerb having size of 75 x 300 x 300 mm depth and as
per design conveying it to the site, jointing into C:M 1:3 and 195.54 Rmt
racking out the joints incl. necessary excavation of asphalt,
soil etc..completed.- I00390
42 80.00 Conveyance charges of earth lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregate of any kind etc. comp. upto 5 km lead.
43 6000.00 Providing & Fixing M.S.Grill, Gate, Elevation Element Of
Decorative Pattern With M.S.Channel, Flat, Medium
Grade M.S.Pipe, Square Or Round Bars With Round 91.00 Kg.
Heanded Bolts, Nuts, Or By Screw. Incl. Applying One
Coat Zinc Primer And Two Coat Of Oil Paint Etc.Comp.
44 2.00 Providing and laying polished granite stone slab 18 mm
thick in risers of steps, dedo and pllars laid on 10 mm thick
cement mortar 1:3 (1 cement : 3 coarse sand) and jointed 2672.00 Sq. M.
with gray cement slurry including rubbing & polishing etc.
complete. (SOR 2015-2016,SR. NO. 23A CH.14 )
45 100.00 Providing & fixing 2.00 mm thick F.R.P. sheet of good
quality and standard make rate also includes necessary
fabrication structure in the grid of 1'-6" x 1'-6" size usiung
hollow pipe of size 3/4" x 3/4" , 2" x 1" & 1" x 1" rate also
inclusive necessary bending ,cutting and fabrication 1865.00 Smt
charges and priming coat and 2 coats of oil paint of shade
approved by engineer in-charge rate also includes washer
and silicon paste required for fixing the sheet in good
quality as diredted.(As per ARC)
46 200.00 Carrying out plinth treatment to post construction /
exsiting structure by spraying chenical solution for termite
control treatment incl. labour and materials consistant with 69.93 Sq.mt
I.S.I specification.(SOR 2021-22 PG NO-199,22007)
47 200.00 Carrying out timber treatment to all wood work incl. drilling
holes and spreying oil based chenical solution on surface
ot timbner work for termite contorl including labour and 36.65 Smt
materials etc. comp (SOR 2021-22 PG NO-198,22005)
48 Provdg. & fixing 100 mm size P or S trap for water closet
squatting pan incl. jointing the trap with the pan & soil pipe
in cement mortar 1 :1 (cement : 1 fine sand) (SOR 2021-
10.00 (A) Vitreous China : 207.90 No
49 20.00 Providing and fixing wsh down water closet
(Europeantype,W.C.Pan) with integral P or S trap including
jointing the trap with soil pipe in Cement Mortar1:1(1-
Cement:1-finesand) (Sea land cover to be measured and 919.80 Each
paid for separately) (A)vitreous China Pattern :(i) in white
colour (SOR 2021-22 PG NO-207,23010)
50 20.00 Providing and fixing water closet squatting Pan (Indian
type W.C. Pan) size 580mm (Earthwork, bed concrete, foot
reste and trap to be measured and paid for separately) (A) 617.40 Each
Vitreous China.(I) Long pattern = White colour(SOR 2021-
51 20.00 Providing and fixing washbasin with single hole for pillar
tap with C.I. or M.S. brackets painted white including
sutting holes and making good the same but excluding
fittings.(A) Vitreous China:(ii) Flat Back washbasin 550 mm
x v 400mm size. (i) In white colour.(SOR 2021-22 PG NO-
52 Provdg. & fixing C.P. Brass screw down bib taps of
following size (SOR 2021-22 PG NO-208,23028A1&A2)
10.00 (II) 20mm dia 248.85 No.
53 10.00 Providing & Fixing Angle Cock Of "Ess Ess" Trend
Series Or Equivalent Standard Make As Approved By 675.00 No.
Engg.In Charge All Complete.(N.S.) I00103
54 10.00 Provdg. & Fixing Gun Metal Check Or Nonruturn Full
Wheel Valve. (A) 15 Mm Dia(SOR 2021-22 PG NO- 218.29 No.
55 Supplying nece hardware,G.I. Fittngs etc.comp of
app.quality as under
10.00 (a)1/2 '' Half turn bib cock 150.00 No
8.00 (b)1/2 '' Gun metal check or non return full wheel valve. 200.00 No
8.00 (c) 1/2 '' Piller tap 200.00 No
8.00 (d) 1/2 '' stop cock 92.00 No
15.00 (i) S.S. Jali 23.00 No
15.00 (j) S.S.Soap dish 48.00 No
8.00 (k) waste pipe 23.00 No
10.00 (l) PVC 1/2 '' Half turn bib cock 25.00 No
56 Provdg. & fixing ball cock of approved qaulity as
directed.(SOR 2021-22 PG NO-211,23037A1,A2,BA,B2)
(A) Copper metel.
5.00 (II) 50 mm dia 221.79 No.
5.00 (II) 50 mm dia 161.09 No.
57 25.00 Providing and fixing Urinal of approved quality including
connection with trap and with integral longitudinal flush
pipe.(A) Squating plate pattern white earthenware 550mm 1023.75 No.
58 10.00 Providing and fixing Urinal or approved quality including
conecting the Urinal with waste pipe , tap etc. complete.(B)
White earthenware flat back or corner type size 430mm x 690.90 No.
59 5.00 Providing & Fixing Chromium Plated Brass Flush Cock
With Lever Of "Ess Ess" - Trend Series Or Equivalent
Make Incl.Fixing In Pipe Etc.Comp.As Dir.Of Engg.In 1800.00 No.
Charge.(N.S.) (1) 25 Mm Dia.I00117
60 5.00 Provdg. & fixing 600mm x 450 mm Bevelled edge mirror
of superior glass mounted of .6 mm th. A.C. sheet or
plywood sheet and fixed to wooden pluge with C.P. brass 609.00 No.
screws and washers.(SOR 2021-22 PG NO-210,23024)
61 10.00 Provdg. And Fixing Cast Pvc/C.I.(Span) Nahni Trap
Of The Following Nominal Diameter Of Self Clenising
Design With C.I. Scread Down Or Hinged Gratiing Incl.
Cost Of Cutting & Making, Good The Walls And Floors 400.05 No.
100 Mm Inlet And 50 Mm Outlet Etc.Comp.(SOR 2021-22
62 10.00 Provdg. & fixing plastic seat & cover for wash down water
closet with C.P.brass hinges and rubber buffers.(SOR 340.37 No.
2021-22 PG NO-209,23017 ) (B) plastci seat & cover
63 5.00 Provdg. & fixing 12.5 lit.PVC Flush tank with nece.fixtures
etc.comp as per site condition (R&B Sor 21-22 I.C NO 1165.20 no
64 15.00 P/F Jet Spreay at Europeon WC Pan, incl nece. lath
connection, stop cock, and other fixing material and labour
as per inst. of engineer in charge(R&B Sor 21-22 I.C NO
65 20000.00 Providing & Fixing Polytheline Over Head Tank With
Necessary Dia.Holes For Outlet,Inlet Over Flow And
Washout Necessary Washer And Checkput
Etc.Comp.(N.S.) I00105
66 10.00 Providing & Fixing Door closer-complete of Approved
make to wooden / Alluminium Doors as per direction of 480.00 No.
engg.in charge.(N.S.)
67 10.00 P & F app.quality for Conseal lock in Alu.door .as per inst
of engg in charge .etc.comp.(app.rate) 300.00 No.
68 2.00 P & f app.quality for brass baby latch (door stopper) as per
inst of engg in charge .etc.comp (app.rate) 180.00 no
69 15.00 Providing & Fixing In Position Alluminium Doors With
Frame Using Approved Quality Anodised Extruded
Alluminium Section As Approved By Engg.In
Charge(Jindal Alluminium) (A)Frame Sections
101.6x44.45 Mm(B)Shutter Bottom Vertical & Top Section
83.5x44.45 (Wt.1.31 Kg/Mt.)(At 1.31Kg/Mt)(C)Shutter
Bottom Section At14.3x44.45 Mm At (1.37 Kg/Mt) 2900.00 Smt
Shutter Middle Section At 100x44.3 Wt.(1.37Kg/Mt)
Incl.Providing & Installing 5 Mm Thick Approved Color
Acrylic Sheet Of Standard Quality Fixed With Glazing
Chips On Upper Pannel & Laminated Sheet On
Lower Pannel (Wtt.0.13 Kg/Rmt) Etc.Comp.As Direction
Of Engg.In Charge. (N.S.) I00134
70 10.00 Providing & Fixing In Position Alluminium Window
Sliding / Fix Type With Frame Using Approved Anodised
Extruded Alluminium Section As Approved By Engg.In
Charge.(Jindal Alluminium) Units Equivalent (A) Frame
Sections 65 X 25 Mm (At 0.41kg/Mt) (B) Sliding Frame
Bottom Section Of 61.85 X31.75 Mm (At 0.41 Kg/Rmt)
(C) Shutter Top & Bottom Section 40 X 18 Mm 2350.00 Smt
(Wt.0.41 Kg/Rmt) (D) Shutter Interlock Vertical Section
10 X18 Mm.(0.41 Kg/Rmt) (E) Shutter Vertical Of 40 X
18 Mm (0.41 Kg/Rmt) Including P/F Installing 5 Mm Thick
Approved Color Acrylic Sheet Of Standard Quality
Etc.Comp.(N.S.)
71 5.00 Provding & fixing Aluminum section partition with powder
coating using 2.5'' x 1.5'' all section work incl.p/f 5 mm thick
glass in upper portion and 10 mm th. Novapan panel in
lower section Work incl.fixing the partition in wall/floor with 2500.00 Smt
nece.screws,rubber gasket & other fittings etc.comp. as
directed by engg.incharges.
72 5.00 Providing & Fixing In Position Alluminium Vents With
Frame Using Approved Anodised Extruded Alluminium
Section As Approved By Engg.In Charge.(Jindal
Alluminium) Units Equivalent (Approved Rate) Frame 1950.00 Sq. M.
Section Of 63.50 X 38.50Mm (Wt.0.68 Kg/Rmt)
Incl.Providing & Installing 5 Mm Thick Approved Color
Acrylic Sheet Of Standard Quality Etc.Comp. I00136
73 5.00 Providing and fixing in position collapsible steel shutters
with vertical channels 20x10x2 mm braced with flat iron
diagonals 20x5 mm size with top & bottom rails of T-iron
40x40x6 mm with 38 mm dia. Steel pulleys complete with
bolts , nuts , locking arrangement , stoppers , handles 3652.11 Sq.M.
including applying a priming coat of red lead paint & two
coats of enamel paint of selected shade & approved make.
74 10.00 Providing corrugated 0.80 mm (22 gauge) thick G.I. sheets
roofing fixed with galvanized iron ‘J’ or ‘L’ hook bolts, and
nuts 8 mm. dia with bitumen and G.I. limpet washers filled 793.10 Sq.mt.
with white lead complete excluding the cost of purlines,
rafters and trusses..(SOR 2021-22 PG NO-163,15001A)
75 8.00 Providing valleys 900mm overall in plain 1.6mm thick G.I.
sheet fixed with G.I. J or L Hooks, Bolts and nuts
glavanised iron J or L Hooks Bolts and nuts 8mm dia G.I. 966.00 sqm
Limpet and bitumen washers complete.(SOR 2021-22 PG
76 5.00 Providing and fixing rolling shutters of approved make
made of 80 mm wide M.S.laths interlocked together
through their entier length & joinned together at the enda
by & locks mounted on specially design pipe shaft with
bracket plates giudes channel & arrangement for inside &
out side locking with push pull operation incl. the the hood
cover & spring etc. including priming , oil painting etc
complete.(SOR 2021-22 PG NO-
140,11006A+11007+11008A) (A) Shutters having width
below 3.5 meter
77 Provdg. & fixing UPVC handle valve of Prince,Supreme
Astral, finolex or equivalent make as per dir. Of engg. In
78 Provdg. And fixing to wall ,ceiling and floor 6.00 kg.
F/Sq.Cm working pressure polythelene pipes of the
following outside diameter, low, density, complete with
special flange compression type fittings, wall clips etc.
making good wall ceiling and floor. (SOR 2021-22, I.C NO-
a 10.00 20mm dia 52.08 Rmt
b 10.00 25mm dia 66.99 Rmt
79 Provdg. And fixing to wall ,ceiling and floor 10.00 kg.
F/Sq.Cm working pressure polythelene pipes of the
following outside diameter, low, density, complete with
special flange compression type fittings, wall clips etc.
making good wall ceiling and floor. (SOR 2021-22, I.C NO-
a 7.00 32mm dia 77.60 Rmt
b 7.00 40mm dia 82.95 Rmt
c 3.00 50mm dia 110.25 Rmt
d 2.00 75mm dia 186.90 Rmt
e 2.00 110 mm dia 333.90 Rmt
80 Provdg. And fixing to wall, ceiling & floor in true line and
level UPVC pipe Schedule- 40 of Prince , Supreme , astral
, finolex or equivalent make as approved by engg.
incharge. pipe shall be fix on wall with the help of clamp at
every twi meter center to center of shall be concealed as
directed in cluding neccesarry fitting etc. in cluding testing
of pipe and jointd and fixing the same with adhesive
solvent , including cost of all materials of following nominal
bore Bldg.s.o.r.2021-22,it code 23061. 23062,
81 Providing & Laying & Jointing glazed stoneware pipes incl.
excavation up to 2.0 mt.,refilling, trasporting the pipe to
work site, unloading, lowering in trenches, laying and
jointing the pipes in c.m. 1:1 incl. all jointing materials such
as cement, sand, hemp, bitumen as dire. testing the pipe
line to a head of 1.5 mt. and hydraulic test as dire incl.
watering trenches, spreading , and carting away of surplus
earth within 100 mt.lead as dire. etc. comp.Bldg.s.o.r.2021-
2022, item code 24001AA, 24001BA, it. No.24.1 Ch- 24)
a 10.00 100 mm dia 140.70 Rmt
b 50.00 150 mm dia. 192.15 Rmt
82 P/F. to wall ceiling and floor galvanized mild steel tubes
(Medium grade) of the following nominal dia. with all tube
fittings and clamps incl. making good the wall, ceiling and
floor. (At any floor level) (Bldg.Sor 2015-16,23.2,23001 a
83 50.00 Providing & Fixing 15 Cm Wide Chicken Mesh Jali With
Nails & Then Application Of 15 Mm Plaster On R.C.C.&
Masonary Joints As Per Dir.Of Engg.In Charge (N.S.)
84 Constructing chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation, C.C.
channel (1:2:4), finished 15 mm thick cement plaster inside
in CM 1:3 finishing with cement slurry, Brick masonry in
CM 1:5 & excluding the cost of chamber seat cover
etc.completed. AMC Drainage SOR 2016 it. no.11
a 2.00 (A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to
0.90meter for pipe dia <=150mm. 2262.00 No.
b 2.00 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to
meter for pipe dia <=20 mm 3905.00 No.
85 5.00 Repairing damaged I.C./ Raising removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and
plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover, removing the debris from chamber
and carting the same as directed. AMC Drainage SOR
86 Repairing damaged M.H. and rasing M.H. up to road level
incl. removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing
C.I. steps and existing MH sheet cover, removing the
debris from MH and carting the same as directed.AMC
Drainage SOR 2016 it. no.21
2.00 (A) up to 0.15 mt. (@ Two Coarse) 732.00 no
2.00 (B) up to 0.35mt. (@ Four Coarse) 1161.00 no
87 Providing F.R.C. MH seat cover incl. carting to the work
site etc. comp. Directed. AMC Drainage SOR 2016 it.
a 10.00 FRC heavy duty cover size 730 mm. & 90 mm thick
circular cover 20 M.T. design load and frame size 560 1080.00 no
mm clear opening size 890 x 890 x 120 mm.
b 10.00 FRC medium duty cover size 670 mm dia & 70 mm thick
10M.T. load design and frame size 560 mm clear 884.00 no
opening outer size 780 x 780 x 120 mm
88 10.00 Making connection to the ex.M.H.in running sewer incl.
Dewatering and other required machinery etc. of following
dia pipes at any convenient time. All damaged work shall 1340.00 no
be well repaired as per instructions. etc..complete. (a)
mm to 300 mm dia. AMC Drainage SOR 2016 it. no.19
89 Providing Kachha of Pakka Dummy in the following dia
pipes and removing the same after completion of the
connection work as directed. AMC Drainage SOR
5.00 (A) 100 mm to 300 mm dia. 199.00 no
5.00 (B) 350 mm to 600 mm dia 303.00 no
90 25.00 Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator, fuel,
power Supply etc. Complete as Directed. (No payment
should be allowed for non working condition of machinery
and for pipe line excavation and M.H. work. Allowed only
for break down work)
91 50.00 Supplying Mazdoor for misc. work like Restetment
Pavment, excavation, refilling, demolishion,levelling work 452.00 no
& other miscellanous work. (app rate in e-module)
92 30.00 Supplying carpenter for repairing doors with nece material
like stopper, hinges, handle, glass etc comp. as per
instruction of Engineer in charge etc. I03725 As per Market
93 5.00 Providing fiiter for D.I./P.V.C./C.I./M./A.C. Pressure water
pipe linmaintenance work with necessary manpower,
tools, plants, and equipments, and any other works 474.00 No.
required for AMC as per instruction of Engineer in charge
etc. complete. I03723 As per Market Rate
94 2.00 Providing and fixing 1.20 Metre high fencing with 2.0 Metre
long M.S. Angle posts 40mm x 40 mm x6 mm and oil
painting 3 coats fixed at 2.5 Mt,C/c. with five Horizontan
lines and two diagonals of galvanised steel barbed wire
weighting 9.38 Kg. per 100 Metre, strained and fixed to
posts with G.I,staples including fixing the postsin ground
with 0.5 M x 0.5.M x 0.5 M. block in C.C1:5:10 etc
comple(SOR 2021-22 PG NO-197,22001)
95 6.00 Providing and fixing stoper (M.S.) 6 inch with necessary
fiting in wooden door including removel of old fiting if any 47.00 No
etc completed as directed. I00870 6 inch
96 6.00 Providing and fixing Aldrop 10 mm size (M.S.) with
necessary fiting in wooden door including removel of old
fiting if any etc completed as directed. I00872 Aldrop
97 6.00 Providing and fixing handle (M.S.) 4 inch size in with
necessary fitting in wooden windows including removal of 39.00 No
old fitting if any etc completed as directed.I00873
98 6.00 Providing and fixing stopper (aluminium) 6 inch with
necessary fiting in wooden door including removel of old 40.00 No
fitting if any etc completed as directed. I00890 6 inch
99 6.00 Providing and fixing Aldrop 10 mm size (aluminium) with
necessary fiting in wooden door including removel of old 138.00 No
fiting if any etc completed as directed I00891
100 6.00 Providing and fixing handle (aluminium) 6 inch size in with
necessary fitting in wooden door including removal of old 36.00 No
fitting if any etc completed as directed.I00889
101 6.00 Reparing of existing Aluminium window/door/partition by
making necessary addition/alteration in same sides. Rate
incl of necessary fittings required and all labour included.
If necessary rate also incl. of removing from position and 500.00 No
refixing it at same place after repairing it, etc comp. as
directed. Sub Desc : As per approved rate of AMC MET
102 2.00 Rapairing Of Door & Window (Wood).It Also Including
Labour Charges For Erection And Fixing Door
Shutter & Frame Etc.And Necessary Repair As Per Site 100.00 No
Condition.(N.S.) I00375
103 6.00 Repairing of Doors/Windows shutters and Frames
including refixing-aligning shutter, providing, replacing,
fixing MS hinges, Aluminium aldrops, stoppers, tadi etc. 250.00 no
complete excluding painting as per
specifications.(app.rate)
104 30.00 Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as
mentioned in the drawing / instruction of engineer in
charge. Cost includes formworks using rubber mould, Rate
providing and laying paver blocks as per required grading
and specification. The paver block shall be mechanically
compacted. The work of paving blocks shall be executed 501.60 Smt
in line and level by skill mason of flooring work only. It
should be laid in such a way that the no cutting of the paver
block to be necessary. if cutting of paver block necessary
then it should be cut by machine only and carting. The
finished surface of the paver block shall have resonably
good, plain finished. Paver blocks shall be compacted and
shall be relaid if necessary. Gravel or such type of
materials shall not be allowed for production. Laying on
5cms thick sand beddding.
105 2.00 Providing & Fixing Door hinge spring include with
necessary all fixtures as dircted by engg.in charge 1175.00 No
106 2.00 Providing & Fixing wall,ceiling and floor 10 Kg.F/Sq.Cm
160 mm working pressure polythelene pipes of low density,
complete with special flange compression type fittings,wall 785.00 Rmt
clips etc.making good wall ceiling and floor as directed by
engg.in charge etc.comp.
107 3.00 P/F. 10 mm thick Novapan sheet of approved quality
including fixing on partition with necessary all fixtures as 1400.00 Smt
directed by engg.in charge etc.comp
108 3.00 Providing and fixing Stainless steel require size Aldrap in
Alluminium section door at differance floor of Multi story
building. work including nece fixing materials materials like
nut bolts, labour , equipment and fixing aldrap on 225.00 No.
aluminium section door etc complete as per instruction of
engineer in charge
109 5.00 Labour charges for removing of Alum. Door / partition /
Alum. Window / M.S Grill etc. 110.00 Smt
110 1.00 Providing, Fabricating and Erecting in position anodised
(15 to 25 micron of desired colour) door shutter (double
action opening) of standard aluminum section from 18mm
(3/4”) series of Jindal or approved equivalent make of size
top and vertical style 47.62 x 44.45 x 2mm ( w approx =
1.05 kg./m), lock rail and bottom section 114.30 x 44.45 x
2mm ( w approx = 1.83 kg/m), fitted on frame of size 4515.28 Smt
101.60 x 44.45 x 2mm ( w app = 1.60 kg./m) with standard
accesories like handle , stopper, locking arrangement, C.P.
brass hinges, etc, and glazing of 5 mm thick float glass of
Mody or approved equivalent , fixed with rubber / PVC
beading in upper and lower panel complete.
111 3.00 Providing, fabricating and erecting in position anodised (15
to 25 micronof desired colour) aluminum fixed glass
windows / partitions made up from standard aluminium
section from 18mm (3/4“) series of Jindal or approved
equivalent make of size 47.62 x 44.45 x 2mm (w app =
1.05 Kg/m), fitted on frame of size 64 x 40 x 2 mm ( w app 2932.00 Smt
= 1.09 Kg./m) with all standard accessories and glazing of
5mm thick flaot galss of Mody or approved eauivalent
fixed with rubber / PVC beading etc. complete as per
details including all fittings and fixtues & locking
arrangement completes.
112 8.00 P/F. new 12.5mm th. Gypsum board ceiling with necessary
heavy weight GI framing members as per site
requirement.Work incl. Supplying of app.brand gypsum
boards and fixing it as false ceiling in line and level with all
necessary hardware and labour etc. comp.as dire. (At any
113 5.00 Repairing of Spalling in concrete with modified cement
mortar & SBR including surface preparations and applying
bonding coat and rust converter of approved brand etc. 400.00 Smt
comp. including scaffolding, finishing with cement slurry As
114 2.00 Providing & Fixing Floor Spring including fixing shutter
etc. complete as per inst. of engineer in charge. 3300.00 no.
115 4.00 P/F. thermocol ceiling with necessary aluminium T section
25 x 25 x 1.2 mm inclusive fixing it to all wall to ceiling
junction and at junction position of two sheets ,item also
includes p/f 20 mm thick plain thermocol sheets size (1 x
0.5 mt) with all necessary fastening and hardware etc.
comp.as dire. (At any floor level)
116 10.00 Removing dry or oil bound distemper by a washing and
scraping and sand papering the wall surface smooth
including necessary repairs to scratches complete.(SOR
117 2.00 Extra over item 118 for removing dry oil bound distemper
on ceilings and sloping roofs.(SOR 2021-22 PG NO.-175 1.05 Smt
118 22.00 Distempeing (Two coats) with oil bound distemper of
approved brand and manufacture and of required shade
on wall surfaces to give an even shade, over and including
a priming coat with distemper primer of approved brand
and manufacture after thoroughly brushing the surface free
from mortar dropping and other foreign matter and also
including preparing the surface even and sand papered
smooth..(SOR 2021-22 PG NO.-175 18021)
119 22.00 Extra over Item 120 for every subsequent coat of approved
brand and manufacture.(18024) 20.06 Smt
120 20.00 Extra over Item 120 for distempering with oil bound
washable distemper on celling and sloping roofs.(18025) 5.36 Smt
121 22.00 Wall painting (two coats) with plastic emulsion paint of
approved brand and manufacture on undecorated wall
surface to give an even shade including throughly brushing
the surface free from mortar droppings and other foreign
matter and sand papered smooth..(SOR 2021-22 PG NO.-
122 22.00 Extra over item 123 for every subsequent coat of wall
painting with plastic emulsion pain of approved 22.26 Smt
123 90.00 Extra over item 123 for painting with plastic emulsion paint
of approved brand on ceilings and sloping roofs.(18032) 3.57 Smt
124 100.00 Applying two coats of Birla (white cement based) or Asian
(acrylic lapy- putty) or equivalent & two coats of primer of
approved brand and manufacture on new wall surface to
give an even shade including thoroughly brushing the 47.41 Smt
surface free from mortar dropping and other foreign matter
and sand papered smooth.(SOR 2021-22 PG NO.-182
125 22.00 Finishing wall with weather proof exterior emulsion paint
on wall surface (two coats) to give an required shape even
shade after thoroughly brushing the surface to remove all 75.60 Smt
dirt, and remains of loose powdered materials.etc
complete(SOR 2021-22 PG NO.-182 19031)
126 5.00 Providing and fixing Polycarbonate roof Lexan sabic
mm th.sheets of approved make, on structural roofing / sky
ligh structures in shapes as per Architect’s drawing. The
rate shall include cost of scaffolding, screws, nuts, bolts
and all necessary fixtures and fastening etc complete
(Rate excluded structural steel work)
127 100.00 Finishing wall with Apex Ultima Acrylic paint of " Asian
Paint " or equivalent on wall surfaces (two coats) to give
required even shade after application of Exterior Primer of
Approved Brand & Manufactures after thoroughly brushing
the surface to remove all dirt & remains of loose powered
128 100.00 Painting two coats (excluding priming coat) on new steel
and other metal surface with enamel paint, brushing,
interior to give an even shade including cleaning the
surface an even shade including cleanicn the surface of all
dirt, dust and other foreign matter.(SOR 2021-22 PG NO.-
129 100.00 Painting two coats (excluding priming coat) on new wood
and wood based surface with enamel paint, interior to give
an even shade including cleaning the surface of all dirt, 58.07 Smt
dust and other foreign matter sand papering and
stopping.(SOR 2021-22 PG NO.-179 19011)
130 102.00 Painting Two coats (excluding priming coat) on previously
painted steel and other metal surface with enamel paint,
brushing to give an even shade including cleaning the 72.46 Smt
surface of all dirt, dust and other foreign matter.(SOR
131 100.00 Painting one coats (excluding priming coat) on previously
painted wood and wood based surface with enamel paint,
to give an even shade including cleaning the of all dirt, dust 36.75 Smt
and other foreign matter.(SOR 2021-22 PG NO.-180
132 5.00 Labour charges for cleaning U.G. & O. H. tank by modern
science technology with six stage process as below (1)
Dewatering existing water by submersible pump. (2)
Hydrojetting by 150 kg. per sq.cm pressure. (3) Vaccum
cleaning to suck the sludge & Turbidity on bottom surface
(4) Heat air system by 80 degree c. tmp. for drying corners
& all sides of tank. (5) Anti bacterial chemical spraying to 650.00 Smt
all surface of tank and then (6) Ultra violet radiation pan
Treatment to tank in this six stages on site classic supply
etc. shall be provided by Muni. Corporation. without
charging any extra cost. The complete tank ckeaning by
mono cleaning systems as directed, rate of above process
are as below capacity of tank. (Approved Rate)
133 5.00 Providing and fixing of mirrors of 5 mm thick on walls of
wash basin counters , toilet area etc, including all hardware
and fixing details and position as per consultant design and 2281.00 Smt
drwaings of the consultant, as directed and to the
satisfaction of the Consultant / Engineer in charge.
134 10.00 Providing and applying texture paint at approved quality,
colour scheme, including preparation of surface, primer
coats+2 coats of putty and texture paint, as per 495.00 No.
manufacture's specification, scaffolding, roller finish etc
complete as per instruction of engineer in charge
135 20.00 Supplying and installation of 10mm thick recycled rubber
flooring having anti-skid and sound absorbing properties,
square shaped, with different color optns for create flooring
pattern, should be installed with proper adhesive as per
manufactures's guidelines, joints of surface to be done
properly to prevent dirt & watepenetration inside the
surface. etc complete as per instruction of engineer in
136 5.00 Providing and applying vinyl paint at approved quality,
including fixing laminate on surface, as per manufacture's
specification, finish etc complete as per instruction of
engineer in charge
137 3.00 Providing and Fixing Metal Jali, making of Wooden Patti
Frame of size 25 mm x 25 mm for Ventilation etc. complete 1437.00 Smt
138 2.00 Providing and fixing 35mm thick flush shutter for doors,
windows & clearstory windows incl. Indian teak wood
frames 12 cm x 7 cm including anodized alluminium fixture
and fastenings incl. primer coat of approved quality and 4800.00 Smt
two coats of oil painting etc. complete.(Fully pannele or
partly panneled and partly galzed door) Flush shutter with
both side laminate
139 5.00 Arrangement of zula with two or nece. skilled labour for
repairing & maintenance work out side building work 950.00 shift
etc.complete as per insructer incharge(At any floor level)
140 10.00 Providing Scaffolding for Demolition Plaster Work &
painting workby 'H' Frame Stand of by any means like
bamboo, balli etc. including carting material work site and
removing after completion of work. Rate include any type
rent etc. complete for any height as directed by engg. in
141 4.00 Supplying , erecting, testing, and commissioning of
Submercible pump set of 1.5 H.P. of Standard make
against the total monometric head of 15 mt. as per
specification incl. motor starter single phase preventer /
liquid level controller G.I. fitting check valves etc. comp. as
142 6.00 Providing, Manufacturing, Fixing Chain Link Jali 8".0" X
4".0" as per detailed Sketch & instruction of Engineer in
Charge same as Lal Darwaja Garden Pattern Consisting
of 3" dia MS pipe A class 5".4" height fixed at 8".9" in C.C.
(1:2:4) block of 9" X 9" X 9" size chain link jali 2" X 2" X
gauge fixed in 35 X 35 X 5 mm MS angle frame of 8".0" X
4".0" size with MS flat of size 25X3 mm welded with jali etc. 1940.00 Rmt
Comp. The Jali is to be Welded to MS angle with MS Flat
as per instruction given. The MS Pipe Jali, MS angle frame
are to be painted one coat of primer & two coats of paint
as directed, in line and level.The two hold fast has been
welded at equal distance at the bottom angle of jali for
support fixed in C.C. as directed by Engg. in Charge.
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Additional City Engineer
mobile no. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites online Percentage Rate sealed tenders from interested contractors for
the work mentioned below.
1 Name of work œrûtK Ítul RLîvwhe Jtuzobtk yum.ce.yub.( MJåA Cth< rbNl)
y<do< swœt swœt Bgwrlrmvj rcÕzekdtu,xtuRjux çjtuf, vu yuLz gwÍ
<ubs gwheljbtk sÁhegt< bwsc heltuJuNl ylu hevuhekd fhJt <ubs
fjh ftb fhJtlt ftb ctc<.( yu.yth.me.xuLzh )
2 Time Limit 12 Months (include monsoon)
3 Tender Validity Period 120 days from the date of submission of the tender
4 Eligibility The Bidder should satisfy all the below mentioned six criteria.
Criteria/Qualifiction for
bidders Register “E2” class in PWD in Govt. R&B/CPWD/AMC
orequivalent registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.24,99,999.00
6 Earnest Money Deposit Rs.4,9999.00 Demand Draft Or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad to be submitted as prescribed
7 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee / Demand
Draft in favour of Municipal Commissioner, Ahmedabad to be
submitted as prescribed in tender.
8 Tender fees Rs.900/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager(South zone), South zone office, Rambaug,
Maninagar Ahmedabad.
10 Tenders online Dt:- 10-02-2026 to Dt :- 02-03-2026 up to 18:00 Hrs.
submission date
11 Tenders physical 03-03-2026 Up to 16:00 Hrs.
submission date
12 Date of Opening To be Intimated after technical bid evaluation
13 Mode of sending the Document shall be submitted in sealed envelope systems By
TenderDocuments RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate ( One
Original & One Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at this
own exppence any defect which may developed or may be noticed
before the period mentioned here under from the certified date of
complition, The within 15 days of recipts of the notice. In the case of
failure on the part of the contractor, the Engineer incharge may rectfy
or remove or reexecute the work at the risk & cost of the contractore.
The Engineer incharge shall be entitled to appropriate the whole or
any part of the amount of security deposit towrdes they expences, If
any, incurred by him in rectification, removal or re- execution. The
defect liability period shall be as under (a) for all works costing up to
Rs. 50,000 (amount put to tender), the period shall be three months
from the cirtified date of complition. (b) for all workscosting more
than Rs. 50,000 and upto Rs. 1 crore (Amount put to tender) ,the
period shall be six (6) month from the cirtified date of compition or
one monsoon , which ever letter.(c) the major project costing more
than Rs. 1 crore , the period shall be 12 months from the cirtified date
of complition which should include one monsoon.(d) For building
works , the period specified in (a) ,(b) & (c) above or elapse of
monsoon period following cirtifide date of complition.,whichever is
letter . For the purpose of deciding the monsoon period, the
september may be treated as the last date.
16 Compansation for Delay 10 % of the balance work after Time limit expired as Peta Work
17 Deduction of Retention Retention @ 2% of the value of work done will be deducted from
Money from each RA each RA bill. It will be released along with release of payment of
Bill Final Bill.
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
Of Tender And The Same As to be Attached Along With The Tender
19 For E.P.F. Act. As per Account department cicular no.37, date-09/08/2018
20 GST Prevailing GST will be paid separately.
Conditional tenders will not be accepted. Municipal Commissionerreserves the rights to reject any or
all the tenders without assigning anyreasons thereof.
Seal and Signature of the Bidder Addl. City Engineer
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
Bank guarantee shall be submitted as per AMC Finance Department Circular No.03 dated 28-04-2023
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for theperiod up to March-
31, 2024. The validity cut-off date in the GR is withrespect to the date of issue of Bank Guarantee
irrespective of the date oftermination of Bank Guarantee.
Commercial Banks :-
1) A U Small Finance Bank
3) City Union Bank
4) DBS Bank India Limited
6) Equitas Small Finance Bank
7) Federal Bank
10) IndusInd Bank
11) Kotak Mahindra Bank
12) Standard Chartered Bank
13) Tamilnadu Mercantile Bank
14) Bandhan Bank
15) BNP Paribas
18) Karnataka Bank
19) Krur Vysya Bank
20) South Indian Bank
21) Utkarsh Small Finance Bank
Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-Operative Bank
8. The Mehsana Urban Co-operative Bank Limited
9. The Surat District Co-operative Bank
10.The Surat Peoples Co-operative Bank
11.SVC Co-operative Bank LTD.
The Issuing Branch Shall Be Of Ahmedabad & Gandhinagar Only.
Special Note: - Amendment, If any by finance department of A.M.C. Shall be Considered final and
Binding Contractors .
Seal and Signature of the Bidder Addl City Engineer(South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under the
"Minor Mineral Act", and such other laws and rules prescribed by the Government from time
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on the
work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of AMC's
Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to
which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time extension
will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the Contractor.
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour shall
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water
for the construction of the works and provide a satisfactory supply of potable water for
drinking, washing, sanitation and cleaning down. The contractor will be responsible for all
the costs where applicable of connection, meter installation, water consumed, water required
for testing purposes, disconnection and the laying, maintenances and ultimate removal of any
distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease the
scope of work. No any claim to that effect shall be entertained. The Municipal Commissioner
also reserves the right to reject any or all the tenders without assigning any reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 10 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 10 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the scope
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad MunicipalCorporation,
A'bad specified up to his first written demand, without demur without delay andwithout the necessity of
a previous of judicial or administrative procedures and without thenecessity to prove to the Bank the
defects or short comings or debits of the contractor any sumwithin the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effectduring the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender)we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consentof the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tendereror of
Date: Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender isaccepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
ftblw ltb :- œrûtK Ítul RLîvwhe Jtuzobtk yum.ce.yub.( MJåA Cth< rbNl) y<do< swœt swœt
Bgwrlrmvj rcÕzekdtu,xtuRjux çjtuf, vu yuLz gwÍ <ubs gwheljbtk sÁhegt< bwsc heltuJuNl ylu
hevuhekd fhJt <ubs fjh ftb fhJtlt ftb ctc<.( yu.yth.me.xuLzh )
I/We the undersigned have carefully gone through and clearly understood the Tender documentsfor the
above work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.I/We have visited
site & fully acquainted with local situations regarding materials, labours & others factorspertaining to work before
submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the saiddocument and
with such materials as are provided for, at the respective rates which I/we have quoted in theschedule-B or at such
other rates as maybe fixed under the provisions of these conditions.In the event of this tender being accepted I/We
agree to enter into an agreement and when required andexecute the contract, according to your fom1 of agreement
as or in default where of I/we bindmyself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC fromthe
date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and takenecessary action
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for thesum
as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer IfI/We fail to
commence the work specified. Otherwise the said sum shall be retained, by the Employer as onaccount of such.
Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
withConditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
ofopening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroiduties and other prevailing Government taxes/charges on such items on which the same are leviable and
therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR.ytÃgt ctœ 1૦ rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth ctœ&e dKJtbtkk ytJNu. <ubs
ðgth ctœ Jfo ytuzoh R~gw&gu&e mbtg bgtoœt NY &guje dKtNu.<&t <u mt&u fhthvºt fhJtltu hnuNu. ylu<u bwsc ftb NÁ fhJtle
<theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -1૦ fh<tk J^w rJjkc ltk rfMmt btk <ubs Jfo
ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk
rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t aftme zu.Bgw.frb©h
(œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 1૨0 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht ChJtle sJtc>the ftuLx[tfxhle
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk
hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su BGþrl.ftuvtuohuNl Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. >huf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht ^tuhKtu
Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ WvtzJtbtk lrn
ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s c<tJuj søgtyu fhJwk vzNu. yuf ftb
ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu LþfNtl &Nu <tu <ule mkÃËKo sJtcœthe
(òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg <ule
sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt>&tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me l vzu <ule sJtc>the vK
vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d
ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu ylu BGþrl.ftuvtuohuNlltu
ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu<ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015bwsc <btb juch / bsqhtulwk dwsht< rcÕzekd yuLz
y^h fLMx[[fNl Jfombtkk VhSgt<hSMx[uNl fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu. juch
yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu<ulu vubuLx ytvJtbtk ytJNu lrn <ubs ct¤
bswhtulu ftb Wvh htFe NftNu lrn.<ubs JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu ftuLx[[tfxhlu ckk^l f<to
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu lrn fu
ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu ftuLx[tfxh îtht ftuEvK «fthle
J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u
hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch yufx
Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch yufx
Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc yLþmhJtltk hnuNu. Mt>h ÃþM<eft øþsht<
çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e b¤e hnuNu. su Juc mtEx www.ahmedabadcity.gov.inWvh Bþfuj
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu mkÃËKo Fao <&t
Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ > vnujt, atÕþ ftbu <&t ftb ÃËKo
>ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubuhtbtk&e
ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe NfNu lrn. yt Nh<
MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. sgtk ftuE atuFJx l
&E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct> ftb
NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu yum.ytu.yth.btk ytExb l ntug <tu
btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu. J^tht
le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo, jtj xul , cuhefuxekd xuv,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu ftuEvK yfMbt<&Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe yuLSlegh©ele <ubtk mne juJtle
hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj ntug <tu <uLþk
ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe
yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf<<btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works. Progress
of work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as
per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He
shall be responsible for any damage to public. If any incident happen, during the execution of work. In
case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final. The
contractor shall have to give site clean of all rubbish during the work and at the time of completion of
work and hand over the site with final finishing of the work as directed. All the rejected materials shall
be removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have
to prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make his
own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR
or if item is not available in SOR than based on current market rates. In case of extra item decision of
Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra and
the contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim
for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the terms
and conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation
shall without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and
black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order to
start the work the penalty of the 0.01% tender Amount per day of delay of start shall be recovered
separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully :-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be applicable as
per tender condition only.
CONTRACTOR'SSIGNATURE & STAMP ADD. CITY ENGINEER
Mobile No.:- (South Zone)
For materials relevant specification of Building Specification shall apply.
Name of Works: - Repairing and renovation work of Kushabhav thakare hall and other different
Municipla building location in Indrapuri ward South zone (ARC Tender)
TECHNICAL SPECIFICATIONS
Item No 1 :-Demolition incl. stacking of serviceable materials & disposal of unserviceable materials
with all lead and lift.
(a) R.C.C. work (20.3,page 217)
(b) Brick work in Cement mortar (20.11,page 217)
(C) Plaster Bldg.s.o.r. 2015-2016 , it. No.20.11 , ch.20
(d) Tiles or Stone flooring (20.23,page 219)
(f) Sheet roofing (G.I. Or A.C.) (20.27,page 219)
(e) Doors,Windows ventilators (wood/steel) (20.49,page
1.0 Mode of measurements & payment :
1.1 The unserviceable materials shall be disposed of at all leads and lifts. The rate excludes scraping
straightening of reinforcement but includes cutting of reinforcement.
1.2 The rate shall be for a unit of one cubic metre
(b) Brick work in cement mortar
1.0 Workmanship :
1.1 The demolition shall consist of demolition of one or more parts of the building as specified or shown
in the drawings. Demolition implies taking up or down or breaking up. This shall consist of
demolishing whole or part of work including all relevant item as specified or shown in the drawings.
1.2 The demolition shall always be planned before hand and shall be done in reverse order of the one
in which the structure was constructed. This scheme shall be got approved from the Engineer-in-
charge before starting the work. This however will not absolve the contractor from the responsibility
of proper and safe demolition.
1.3 Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work
or property, which is to be left intact, before dismantling and demolishing is taken up and the work
shall be carried out in such a way that no damages is caused to the adjoining property.
1.4 Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
1.5 Dismantling shall be commenced in a systematic manner. All materials which are likely to be
damaged by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled
first. The dismantled articles shall be properly stacked as directed.
1.6 All materials obtained from demolition shall be the property of Government unless otherwise
specified and shall be kept in safe custody until handed over to the Engineer-in-charge.
1.7 Any serviceable materials, obtained during dismantling or demolition shall be separated out and
stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b
stacked as directed by the Engineer-in-charge.
1.8 On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
1.9 The relevant specifications of shall be Above followed except that demolition of R.C.C. work is to
2.0 Mode of measurements & payment :
2.1 Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured
under this item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed for construction of work.
2.2 All work shall be measured in decimal system as fixed in its place subject to the following limits,
unless otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b)
Area shall be worked out to the nearest 0.01 sq. mt. (c) Cubical connection shall be worked out to
the nearest 0.01 Cu.m.
2.3 the rate shall include cost of all labour involved and tools used in demolishing and dismantling
including scaffolding. The rate shall also include the charges for separating out and stacking the
serviceable materials properly and disposing the unserviceable materials with all lead and lift. The
rate also includes for temporary storing for the safety of the portion not required to be pulled down
or of adjoining property and providing temporary enclosures or partitions where considered
2.4 The relevant specification of above shall be followed except that the demolition of reinforced
concrete structure. The unserviceable materials shall be disposed of at all leads and lifts. The rate
excludes scraping straightening of reinforcement but includes cutting of reinforcement.
The rate shall be for a unit of one cubic metre.
(d) tiles or stone flooring
(e) Sheet roofing (G.I OR A.C)
1.00 Mode of measurement & Payment :
1.01 The rate shall include stacking the unserviceable materials as directed will lead and lift.
1.02 The rate shall be for a unit of one sq. meatier
(f) Doors ,Windows ventilators (wood/steel)
1.00 Mode of measurement & Payment :
1.01 The rate shall include stacking the unserviceable materials as directed will lead and lift.
1.02 The rate shall be for a unit of one No.
Item No 2:- Dismantling barbed wire fencing / Chainlink Fencing including making rolls and also
including dismantling fanning posts including all earth work concrete in the base
and making good the disturbed ground stacking unseal materials as directed and disposing
all the unserviceable materials with all leads al lifts & carting to AMC Store as directed by
engg. in charge [Bld. SOR 15-16;it:-20.51.page no-
Dismantling barbed wire fencing / Chainlink Fencing including making rolls and also including
dismantling fanning posts including all earth work concrete in the base and making good
the disturbed ground stacking unseal materials as directed and disposing all the unserviceable
materials with all leads al lifts & carting to AMC Store as directed by engg. in charge [Bld. SOR 15-
16;it:-20.51.page no-
Mode of Measurement shall be on runnig meter basis.
Item NO 3 :- Excavation for foundation in any types of soil including sorting out and stacking of useful
materials and disposing off the excavated stuff upto 50 Meter lead and required left
(Bldg.s.o.r.2015-2016,it. No.0.1 Ch- 4 )
(a) 0 to 1.5 mtr depth
(b)1.5 to 3.0 mt. depth.
(c)3.0 to 5.0 mt. depth
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any
such ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall
under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone,
materials and rubbish of all kind, bush, wood and trees shall be removed as directed. The materials
so obtained shall be property of the Government and be conveyed and stacked as directed. within
100 M. lead. The roots of the trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra
Setting Out : After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor
shall assume full responsibility for alignment, elevation and dimension of each and all parts of the
work. Contractor shall supply laborers, materials, etc. required for setting out the reference marks
and bench marks and shall maintain them as long as required and directed.
Excavation : The excavation in foundation shall be carried out in true line and level and shall have the
width and depth as shown in the drawings or as directed. The contractor shall do the necessary
shoring and shutting or providing necessary slopes to a safe angle, at his own-cost. The payment
for such precautionary measures shall be paid separately if not specified. The bottom of the
excavated area shall be 1 evened both longitudinally and transversely. as directed by removing and
watering as required. No earth filling will be allowed for bringing it to level, if mistake or any other
reason excavation is made. deeper or wider that shown on the plan or directed. The extra depth or
width shall be made up with concrete of same proportion as specified for the foundation concrete at
the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground
in layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work
to a place as directed with lead upped 100 M. and all lift.
Mode of measurement and payment :
6.1 The measurement of excavation in trenches for foundation shall be made according to the sections
of trenches shown on the drawing or as per sections given by the Engineer-in-charge. No payment
shall be made for surplus excavation made in excess of above requirements or due to slopping and
sloping back as found necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Item No 4:- (a)
Providing and laying cement concrete 1:4:8 (1 - Cement : 4-Coarse sand : 8-Graded Brick
bats aggregate 40 mm normal size) and curing complete excluding cost of form work in (A)
Foundation and Plinth (upto 10 ton) (Bldg.Sor Jan 2016,item no.5.3.3, 5008)
Provdg. & laying cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 hand broken stone
aggregates 40 mm nominal size) and curing complete excluding cost of form work in
Foundation and plinth.
Water shall conform to M-1, sand shall conform to M-6. Cement shall conform to M-3. Brick bats
shall conform to M-14.
The relevant specification of item No. 5.3.4 shall be followed except that brick bats aggregate shall
be used instead of stone aggregate.
Mode of measurement and payment :
The relevant specification of item No 5.3.4 shall be followed
The rate shall be for a unit of one cubic meter.
Water shall conform to M-1. Sand shall conform M-6. Cement shall conform to M-3. Stone aggregate
40 mm. nominal size shall conform to M-12.
2.0. Workmanship :
2.1.1. Before starting concrete bed of foundation treaches shall be cleared of all loose materials, leveled,
watered, and rammed as directed.
Proportion of Mix :
The proportion of cement, sand and coarse aggregate shall be one part of cement, 3 parts of sand,
6 parts of stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however
be allowed for smaller quantity of work if approved by the Engineer-in-charge. When hand mixing is
permitted by the Engineer-in-charge incase of break-down of machinery’s and in the interest of the
work. it shall be carried out on a water tight platform and care shall be taken to ensure that mixing
is continued until the mass is uniform in colour and consistency. However in such cases 10% more
cement than otherwise required shall have to be used without any extra cost. The mixing in
mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water shall be sufficient
to produce a dense concrete of required workability for the purpose.
Transporting & Placing the concrete :
The concrete shall be handled from the place of mixing to the final position in not more than
minutes by the method as directed and shall be placed into its final position, compacted and finished
within 30 minutes of mixing with water i.e. before the setting commences.
The concrete shall be laid in layers of 15 cms. to 20 cms.
The concrete shall be rammed with heavy iron rammers and rapidly to get the required compaction
and to allow all the interstriees to be filled with mortar.
After the final set, the concrete shall be kept continuously wet, if required by pounding for a period
of not less than 7 days from the date of placement.
2.7. Mode of measurement and payment :
The concrete shall be measured for its length breadth and depth, limiting dimensions to those
specified on plan or as directed.
The rate shall be for a unit of one cubic meter.
Item No 5 :- Providing and laying controlled cement concrete M-200 and curing complete, excluding
the cost of form work and reinforcement for reinforced concrete work in: (Bldg.Sor 2015-
16,item no.5.8.,page no-57)
(A) Foundations, footings, base of columns, and mass
(B) Walls from top of foundations/level up to floor two
(C) Slabs, landings, shelves, balconies, lintels, beams,
girders and cantilever upto floor two level.
(D) Columns, pillars, posts and struts upto floor two level.
Item No 6:- Providing & Applying Tri mix with De watering Machine floter machine on constructed
RCC work including Machine & Labour etc Comp as directed (approved rate)
Mode of Payment:
The payment for this item shall be done per smt basis.
Item No 7:- Filling Available Excavated Earth (Excluding Rock) In Trenches,Plinth,Sides Of
Foundations Etc.In Layers Not Exceeding 20 Cm.In Depth Consolidation Each Deposited
Layer By Ramming And Watering.(P.15,Ch.4, Item.No.4.12)
The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and water
thoroughly after each layer and shall be properly consolidated with rammers so that no hollow voids
remain there. In general the work shall be carried out in the best manner so that no hollow voids
remain after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Item No 8 :- Providing form work in ordinary timber planking so as to give a rough finish including
centering, shuttering, strutting and propping etc. height of propping and centering below
supporting floor to celling not exceeding 4 M & removal of the same for in situ reinforced or
plain concrete work in (Bldg.Sor 15-16 ,,item no.9.1,page no-99 )
(A) Foundation, footings, bases of columns etc. and mass concrete.
(B) Flat surface such as soffits of slabs, landing and the like
(I) Floors etc. 200 mm in thickness.
(C) Vertical surface such as walls (any thickness) partitions and the like including
attached but tresses & string course & the like.
(D) Columns Pillars Posts and struts.(1) Square Rectangular Polygonal in plan.
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood
shall not be less than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and
be so constructed as to remain sufficiently rigid during the placing and compacting of the concrete.
Adequate arrangements shall be made by the contractor to safe guard against any settlement of the
form work during the course of concreting and after concreting. The form work of shuttering,
centering, scaffolding bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the
interior of the form before the concrete is placed and the form work in contact with concrete shall be
cleaned and thoroughly wetted or treated. The surface shall be then coated with soap solution
applied before concreting is done. Soap solution for the purpose shall be prepared by dissolving
yellow soap in water to get consistency of paint. Alternatively a coat of raw linseed oil or form oil of
approved manufacture may be applied in case steel shuttering is used. Soap solution or raw linseed
oil shall be applied after thoroughly cleaning the surface. Care shall be taken that the coating does
not get on construction joint surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry
of following periods:
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
2.4 Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the
reinforced concrete surface. Before the soffits form work and struts are removed, the soffits and the
concrete surface shall be exposed where necessary in order to ascertain that the concrete has
sufficiently hardened.
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure
absolute safely of the form work and concrete work before, during and after pouring concrete. Watch
should be kept to see that behavior of centering and form work is satisfactory during concreting.
Erection should also be such that it would allow removal of forms in proper sequence without
damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to
carry the loads without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge
before concreting. But this will not relieve the contractor of his responsibility for strength, adequacy
and safety of form work and centering. If there is a failure of form work or centering, contractor shall
be responsible for the damages to the work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of
concreting shall be provided and removed on completion work by contractor at his own expense.
The scaffolding, hoisting arrangements and ladders etc. shall be strong enough to with stand all live,
dead and impact loads expected to act and shall be subject to the approval of the Engineer-in-
charge. However, contractor shall be solely responsible for the safety of the scaffolding, hoisting
arrangement, ladders, work and workman etc.
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work
spot and afford easy inspection.
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall
include the cost of materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens
centering, shuttering propping, bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm
width to beams, columns and the like.
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Before re use all forms shall be inspected by Engineer-in-charge and their suitability ascertained. The forms
shall be scarred, cleaned, and joints gone over, repaired where required. Inside surface shall be
retreated to prevent adhesion of concrete.
Mode of measurements & payment:
Form work shall be measured as the area in square meters of shuttering in contract with concrete except in
the case of inclined member and portion of curved profile and upper side in which case only area of
underside shall be measured for payment.
Form work to secondary beams shall be measured up to the sides of main beams but no deduction shall be
made from the form work of the main beam at the inter section point. No. deduction shall be made
from the form work of a column at inter section of beams.
The rate is for the completed item.
The rate shall be for a unit of one Sq. meter
Item No 9 :- Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregates 20 mm nominal size) and curing complete excluding cost of form work and
reinforcement for reinforced concrete work in (P.49,Item No.5.4.1 sor-15-16)
(A) Foundations, footing, of columns and mass concrete
(B) Slabs, landings, shelves, balconies, lintels, beams, girders and cantilever upto
floor two level.
Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried
out for reinforced concrete work for work as specified in item 1.2. In addition, the following
stipulations shall be followed for :
1.2 The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar
1:2 (1 cement : 2 coarse sand) about 4 cms x 4 cms
section and of thickness equal to the specified cover shall be placed between the bars and shuttering
as to secure and maintain the requisite cover of concrete over the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held in
position by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with
slotes accurately out in them. The temphtes shall be removed after concreting has been done below
it. The bars may also be suitably tied by means of annealed steel wires to the shuttering to maintain
their position during concreting.
1.3 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to
be attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if the
bars are not likely to be incorporated with succeeding mass of concrete within the following 10 days.
This coat of thin neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Item No 10 :- Providign thermo Mechanically treated bars (RNT EARS) confirming to IS 786/FC
for R.C.C works includings bendings, binding and placing in position complete upto floor
two level.(Bldg.Sor 15-16,item no-5.4.11,page no-53)
The specification of the above item can be available from Ch.5, pg.no.29 to 42, “ General Technical
Specifications for Building Works ” Book published by Gujarat Book Stores (P) Ltd, Sector-21,
Gandhinagar or It can be downloaded from www.egovamc.com.
Mode of Payment:
The payment for this item shall be done in Kg basis.
Item No 11 :- Brick Work Using Common Burnt Clay Building Bricks Having Crushing Strength Not
Less Than 35 Kg/Sq. Cm. In Cement Mortar 1:6 (1 Cement : 6 Fine Sand) ((Bldg.Sor 15-16,item
no.6.13-,page no-83) A) In foundation and Plinth
Extra for brick work in super structure above plinth level upto floor two level (B) Conventional
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick shall
conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 6 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about
two hours before use or as directed. The cessation of bubbles, when the bricks are wetted with water
is an indication of through wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be
used except when necessary to complete to bond; closer in such case shall be cut to required size
and used near the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each
brick shall first be properly bedded and set home by gently tapping with handle of trowel or wooden
mallet. It side face shall be flushed with mortar before the next brick is laid and pressed against it.
On copletion of course, the vertical joints shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and
all vertical joint shall be truly vertical. Vertical joints in alternate course shall generally be directly one
over the other. The thickness of brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight
edges, mason’s sprit level, square half meter rub, and pins, string and plumb shall be kept on the
site of work for frequent checking during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place.
All the connected brick work shall be kept not more than one meter over the rest of the work. Where
this is not possible, the work shall be raked back according to bond (and not left toothed) at an angle
not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are
required to be built in wall shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins
shall not exceed 12 mm. The face joints shall be raked out as directed by taking tools daily during
the progress of work, when the mortar is still green so as to provide key for plaster or pointing to
The face of brick shall be cleaned the very day on which the brick work is laid and
all mortar dropping removed.
2.5.1 Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces
for a period seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
2.6.1 If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all
loose materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete
footing, the top of concrete shall be cleaned and moistened. The contractor shall obtain the
engineer'’ approval for the foundation bed, before foundation masonry is started. When puccas
flooring is to be provided flush with the top to plinth, the inside plinth offset shall be kept lower than
the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in
foundation up to plinth. The limiting dimensions not exceeding those shown on the plans or as
directed shall be final. Battered, tapered and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment
made for embedding in masonry or making holes in respect of following items:
(1) Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional
area does not exceed 500 Sq. cm.
(2) Opening not exceeding 1000 Sq. cm.
(3) Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed
10 Cms. and the bearing does not extend to the full thickness of wall.
(4) Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows
(5) Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes
etc. for concealed wiring.
(6) Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make
splaying of jambs, throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Item No 12:-.Half Brick Masonry In Common Burnt Clay Building Bricks Having Crushing Strength
Note Less Than 35 Kg/Sq. Cm. In Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) In
Foundation and plinth .(P.87,Ch.6,Item No.6.3,06008A2)
Extra for half brick masonry in super structure above plinth level upto floor two level. (B)
1.0 Materials: Brick shall conform to M-15. Water shall conform to M-1. Cement shall conform to M-3.
Sand shall conform to M-6. Cement mortar shall conform to M-11.
2.0 Workmanship:
2.1 Relevant specifications of bricks, wetting and laying of bricks, joints, curing etc. shall conform to item
No 6.19 (A) except the brick work of half bricks shall be carried out.
2.2 Cement mortar used in masonry work shall be in proportion of 1 part of cement and 4 part of sand
2.3 All bricks shall be laid strecher wise, breaking joints with those in the upper and lower courses. The
wall shall be taken truly plumb. All courses shall be laid truly horizontal and all vertical joints shall be
truly vertical. The bricks shall be laid with frogs upwards. A set of masons tools shall be maintained
on work as required for frequent checking.
3.0 Mode of measurement and payment:
3.1 The half brick masonry work in foundation and plinth shall be measured under this item, the limiting
dimensions shall not exceed those shown in the plan or as directed. Any work done extra over the
specified dimensions shall be ignored.
3.2 The relevant specifications of item No. 6.12 shall be followed. The length shall be measured nearest
3.3 The rate shall be for a unit of Sq. Mt.
Item No 13 :- Providing cement plaster in single coat on brick/concrete wall for interior/exterior
plastering upto any floor level finished even and smooth in CM 1:3 incl. finishing with
floating coat of neat cement slurry, with necessary scaffolding etc. complete.
(P.91,Ch.6.,Item No.6.32,06010B)(a) 15 mm th.
1.0 Materials :
1.1 Water M-1. The Cement mortar of proportion 1:4 shall conform to M-13.
2.0 Workmanship :
2.1 Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These
shall be properly examined before erection and use Stage scaffolding shall be provided for ceiling
plaster, which shall be independent of the walls.
2.2 Preparation of back-ground :
2.2.1 The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and
other foreign matter by water or by brushing. Smooth surface shall be roughened by wire brushing
if it is not hard and by racking if it is hard. In case of concrete surface, if a chemical retarder has
been applied to the form work, the surface shall be roughened by wire brushing and all the resulting
dust and loose particles cleaned off and care shall be taken that none of the retarder is left on the
surface. Trimming of projections on brick/concrete surface where necessary shall be carried out to
get an even surface.
2.2.2 Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period
before carrying out the plaster work.
2.2.3 The work shall not be soaked but only damped evenly before applying the plaster. If the surface
becomes dry such area shall be moistened again.
2.2.4 For external plaster, the plastering operation shall be started from top floor and carried downwards.
For internal plaster, the plastering operations may be started wherever the building frame and
cladding work are ready and the temporary supporting ceiling resting on the wall of the floor have
been removed, Ceiling plaster shall be completed before starting plaster to walls.
2.3 Applications of Plaster :
2.3.1 The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than
metre intervals over the entire surface to serve as gauge. The surfaces of these gauges shall be
truly inplane of the finished plastered surface. The mortar shall then be applied in uniform surface
slightly more than the specified thickness, then brought to a true surface by working a wooden
straight edge reaching across the gauges with small upward and sideways movement at a time.
Finally, the surface shall be finished off true with a trowel or wooden float according as a smooth or
a sandy granular texture is required. Excessive trowelling or overworking the float shall be avoided.
All corners, arrises, angles and junctions be truly vertical or horizontal as the case may be and shall
be carefully finished. Rounding or chamfering corners, arrises junctions etc. shall be carried out with
proper templates to the size required.
2.3.2 Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which
is partially set shall be rejected and removed forthwith from the site :
2.3.3 In suspending the work at the end of the day, the plaster shall be left out clean to the line both
horizontally and vertically. When recommending the plaster, the edges of the old work shall be
scraped clean and wetted with cement putty before plaster is applied to the adjacent area to enable
the two to properly joint together. Plastering work shall be closed at the end of the day on the body
of the wall and nearer than 15 cm. To any corners or arrises. Horizontal joints in plasterwork shall
not also occur on parapet tops and copings as these invariably lead to leakage. No portion of the
surface shall be left out initially to be packed up later on.
2.3.4 Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of
days. Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall
be avoided and only as much water as can be readily absorbed shall be used excessive evaporation
on the sunny or windward side of building in hot air or dry weather shall be prevented by handling
mattings or gunny bags on the outside of the plaster and keeping them wet.
3.0 Mode of measurement & payment :
3.1 The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations
described under workmanship.
3.2 All plastering shall be measured in square metres unless, otherwise specified length, breadth or
height shall be measured correct to a centimeter.
3.3 Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in
brick work, stone work etc. or space between laths. Thickness of plaster shall be average thickness
with minimum 15 mm. at any point on this surface.
3.4 This item includes plastering upto floor two level.
3.5 The measurement of wall plastering shall be taken between the walls or partition (dimensions before
plastering being taken) for length and from the top of floor or skirting to ceiling for height. Depth of
cover of cornices if any shall be deducted.
3.6 Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured
3.7 For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints,
beams, posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding
0.5 sq.mt. and not exceeding 3.0 sq. mt. in each area deductions and additions shall be made in the
following manner :
(a) No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq.
mt. each and no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for
finish to plaster around ends of joints, beams, posts etc.
(b) Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as
follows and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
(i) When both faces of all wall are plastered with same plaster, deduction shall be made for one face
(ii) When two faces of wall are plastered with different types of plasters or if one faces is plastered and
the other pointed, deductions shall be made from the plaster or pointing on the side of frame for
door, window etc. on which width or reveals is less than that on the other side but no deductions
shall be made on the other side. Where width of reveals on both faces of all are equal, deductions
of 50% of area of opening on each face shall be made from area of plaster and/or pointing as the
3.8 For openings having door frames equal to projecting beyond the thickness of wall, full deduction for
opening shall be made from each plastered face of the wall.
3.9 In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs,
soffits and sills shall be measured.
3.10 The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 14 :- Providing 20mm thick double coat sand face/mala cement plaster on interior
brick/concrete work for plastering comprising o f base coat of 12mm thick cement
plasterin cement mortar(1Cement:4coarsesand) in rough finishing and 8mm thick t op
coat of cement mortar1:2(1Cement:2Coarsesand) finished with trovel including
scaffoldingcuring etc. complete.(P.203,Ch.17.,17017)
The rate shall be for a unit of one sq. metre.
Item No 15:- Providing & Applying Cement Popada Plaster In Cement Mortar In 1 : 3 Incl.
Cleaning Surface Before Plastering Rate Also Incl. Scafloding, Watering , And
Neat Finishing Etc. Comp. As Dire.(N.S./ARC)
Providing & Applying Cement Popada Plaster In Cement Mortar In 1 : 3 Incl.
Cleaning Surface Before Plastering Rate Also Incl. Scafloding, Watering , And Neat
Finishing Etc. Comp. As Dire.(N.S./ARC)As per Item and instructed by engineer
The rate shall be for a unit of one sq. metre.
Item No 16:- Providing and applying fibere reinforced cementitious micro concrete work in
cellings and beams incl.mixture of CEMSCREED HM (F) fair mate company material,
FBR bonding agent material with water in suItable proportion anti corrosive treatment
on exposed beam,celling steel bars with safeCore R incl.all kind of labour
etc.comp.including three coat of white wash.(Approved Rate in ARC)
Providing and applying fibere reinforced cementitious micro concrete work in cellings and
beams incl.mixture of CEMSCREED HM (F) fair mate company material, FBR bonding agent
material with water in suItable proportion anti corrosive treatment on exposed beam,celling
steel bars with safeCore R incl.all kind of labour etc.comp.including three coat of white
wash.(Approved Rate in ARC)The rate shall be for a unit of one sq. metre.
Item No 17 :- Providing And Laying Polished Kota Stone Slab Flooring Over 20 Mm. (Average)
Thick Base Of Cement Mortar 1:6 (1 Cement : 6 Coarse Sand) Or Lime Mortar
1:1.5 Laid Over And Joined With Grey Cement Slurry mixed with pigmentt
omatchtheshade of slab including rubbing and polishing etc.complete.(A)25mmthick.
1.0 Materials :
1.1 Water shall conform M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11
polished kota stone shall conform to M-49.
2.0 Workmanship :
2.1 Each slab shall be cut to the required size and shape and fine chisel dressed at all the edges. The
sides thus dressed shall have a full contact if a straight edge is laid along. The sides shall be table
rubbed with coarse sand before paving. All angles and edges of the slabs shall be true square and
free form chippings and giving plain surface. The thickness shall be 25 mm. (Average) as specified
in the item but not less than 20 mm. at any place of the slab.
2.2 Bedding for the kota stone slabs shall be cement mortar 1:6 (1 cement : 6 coarse sand) or L.M. 1:1.5
of average thickness 20 mm. as given in the description of the item. Sub grade shall be cleaned,
wetted and mopped. Mortar of the specified mix and thickness shall be then be spread on an area
sufficient to receive one kota stone slab. The slab shall be washed clean before laying. It shall be
laid on top pressed, tapped gently to bring it in level with the other slabs. It shall be lifted and laid
aside. Top surface of the mortar shall then be corrected by adding fresh mortar at hollows or
depressions. The mortar shall then be allowed to harden bit. Over this surface, cement slurry of
honey like consistency shall be applied. The slab shall then be gently place in position and tapped
with wooden mallet till it is properly pedded in level with and close to the adjoining slab. The joint
shall be as fine as possible. The slabs fixed in the floor adjoining the wall shall enter not less then
10 mm. under the plaster skirting or dado. The junction between the wall floor shall be finished
neatly. The finished surface shall be true to levels and slopes as directed.
2.3 The floor shall be kept wet for a minimum period of 7 days. So that bedding and joints set properly.
2.4 Polishing shall be normally commenced after 14 days of laying the stone slab. First polishing shall
be done with ear borundum stones of 120 grade grit fitted in the heavy machine and then second
polishing shall be done with carborundum stone of 220 of 350 grade grit fitted in heavy machine.
Water shall be properly used during polishing. The stone shall then be washed clean with water.
When directed by the Engineer-in-charge wax polish of approved quality shall be applied on the
surface with the help of soft cloth over a clean and dry surface. Then the polish machine fitted with
bobs shall be run over it.
2.5 The holes required for Nahni traps, pipes any other fittings shall be made without any extra cost.
3.0 Mode of measurements & payment :
3.1 The rate shall include the cost of all materials and labour involved in all the operations described
above. The Kota stone flooring shall be measured in square metres correct to two places of decimal,
length and breadth shall be measured correct to a centimeter and between the finished face of
skirting dado or wall plaster and no deduction shall be made nor extra paid for any opening in floor
of area upto 0.1 sq. mt.
The rate shall be for a unit of one sq. metre.
Item No 17 :- Labour Work for moulding the polish kota stone surface rate also including provding
cutting and grinder machine for molding work etc.complete as directed.(app.rate)
The rate shall be for a unit of one running metre.
As per Item and instructed by engineer incharge
Item No 18:- Labour work for Polish kota stone surface rate also including providing cutting and
grinder machine for molding work etc comlete as directed.(app. rate)
The rate shall be for a unit of rmt.
As per Item and instructed by engineer incharge
Item No 19:- Labour work for Polish kota stone surface rate also including providing cutting and
grinder machine for molding work etc comlete as directed.(app. rate)
The rate shall be for a unit of one sq. metre
As per Item and instructed by engineer incharge]
Item No 20 :- Providing And Laying Cement Concrete Flooring For I.P.S.1:2:4 (For Indian
Patent Stones) (1 Cement: 2 Coarse Sand:4 Graded Stone Aggregate 20 Mm.
Nominal Size) Lain In Layer Finished With A Floating Coat Of Net Cement.(40
Mm Th.)(P.187,Item No.14.71,14015A)
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 20 mm. nominal size shall conform to M-12.
Cement concrete 1:2:4 proportion measured by volume shall conform to relevant
specification or ordinary grade 1:2:4 concrete.
2.0 Workmanship :
2.1 The cement concrete flooring of 40 mm. thick (average) is to be laid as per the site condition. The
concrete shall be mixed in a mechanical mixer at the work. Hand mixer may however be allowed for
smaller quantities of work and in case of failure of machines or as permitted by the engineer-in-
charge. It shall carried out on a water tight platform and care shall be taken to ensure that mixing is
continued until the mass is uniform in colour and consistency. However in such cases 10% more
cement than otherwise required shall have to be used without any cost. The mechanical mixing shall
be done for a period of 1/2 to 2 minutes. The quantity of water shall be thus sufficient of produce a
dense concrete required workability for the purpose. Flooring of specified thickness shall be laid in
accordance with approved pattern or as directed. Finishing operation shall start shortly after the
cessation of beating and shall be spread over a period of one to six hours depending upon the
temperature and atmospheric conditions. The surface shall be left for some time till moisture
disappears from it. Fresh quantity of cement shall be mixed with water to form a thick slurry and
spread over the surface while the concrete is still green. Use of dry cement or cement and sand
mixture sprinkled on this surface to stiffen the concrete or absorb excessive moisture shall not be
permitted. The cement slurry shall than be properly paste twice by means of iron flats, once, when
the slurry is applied and the second time when cement starts setting and finished smooth. The
surface shall be marked with string or B.R.C. fabric jali to make the surface non slippery as and
when directed. The junction of floors with wall plaster dado or skirting shall be rounded where so
required upto 25 mm. radius. Flooring in lavatories and bath rooms shall be laid after fixing of water
closet and squatting pans and floor traps, which shall be plugged while laying the floors and opened
after the floors, are completed. Any damage, done to water supply sanitary fittings during the
execution of work shall be mage good.
2.2 After the final set, the concrete shall be kept continuously wet, if required ponding for a period of not
less than 7 days from the date of placement.
2.3 The form work shall be provided if necessary as directed by the engineer in charge. Concreting shall
be done as per alternate bay method with necessary centering wither by mastic or cement mortar
3.0 Mode of measurement & payment :
3.1 The rate shall include the cost of all material and labour involved in all the operations described
above. No deduction shall be made or extra paid for any opening upto 0.1 sq. metre in area in the
floor, nothing extra shall be paid for laying the floor at different levels in the same room or the court
3.2 The rate shall be for unit of one sq. metre.
Item No 21 :- Additional Rate For Providing Water Proofing Solution in I.P.S
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 22 :- P & L 24"x24" vitrified 8mm thick tile flooring over 20mm (average) base of cement
mortar 1:6(1cement:6coarsesand) on new surface or fixing on existing flooring by
adhesive material including dismentaling of existing flooring and jointed with color
cement slurry including finis ed with flush pointing & cleaning the
surfaceetc.complete for anti skit(P.189,Item No.14.9,14021)
Item No 23 :- P & L 24"x24" vitrified 8mm thick tile flooring over 20mm (average) base of cement
mortar 1:6(1cement:6coarsesand) on new surface or fixing on existing flooring by
adhesive material including dismentaling of existing flooring and jointed with color
cement slurry including finis ed with flush pointing & cleaning the
surfaceetc.(P.189,Item No.14.9,14022)
Water shall conform to M-1. Cement mortar shall conform to M-11. vitrifiedtiles shall
conform to M-55.
2.0 Workmanship :
2.1 Preparation of surface : In case of brick masonry wall, the joints shall be raked out to a depth of atleast
15 mm. while the masonry is being laid. In case of concrete wall, the surface shall be chiselled and
roughened with wire brushes. The surface shall be cleaned and wetted thoroughly before
commencing the laying work.
2.2.1 The wall surface shall be covered 20 mm. thick plaster of cement mortar 1:6 mix and allowed to
harden. The plaster shall be roughened with wire brushes both way. The back of tiles shall be
floated with gray cement slurry and edges with white cement slurry set in bedding mortar. The tiles
shall be gently tapped in position one after the other keeping the joints as this as possible. Top f
skirting or dado shall be truly horizontal and the joints vertical or as per required pattern.
2.2.2 Risers of steps, skirting and dado shall rest on top of treads or flooring. Where full size tiles cannot
be fixed, they shall be cut to the required size and the edges be smoothened. surface shall be
2.2.3 The joints shall be cleaned and flush pointed with white cement. The surface shall be kept wet for
seven days. After curing the surface shall be washed clean.
3.0 Mode of measurement & payment :
3.1 The rate shall include the cost of all materials and labour required for various operations described
above. Risers of steps, skirting and dado shall be measured in square meters. Length and height
shall be measured along the finished face of the skirting or dado including curves, where special
such as covers, internal and external angles, etc. used. The length and height shall be measured
correct to the centimeter except in cast of riser and skirting where height shall be measured correct
3.2 The rate shall be for a unit of one sq. meter.
As per Item and instructed by engineer incharge
Item No 23:- Providing & laying polish kota stone (25 mm th,) Sandwich platform. Work incl. provdg
good quality & even shade polish kota stone of required size having uniform thickness.
Work also incl. providing nece. Dismentling of brick work for making jari to support the
etc.comp.(app rate)
The rate shall be for a unit of one Sq.mt.
As per Item and instructed by engineer incharge
Item No 24:- Providing and Fixing pvc.Door (sintex door-equivalent) with necessary alluminium
fitting with EL-7 section frame (Approved Rate as per ARC)
The rate shall be for a unit of one Sq.mt.
As per Item and instructed by engineer incharge
Item No 25:-Providing & laying polish kota stone (25 mm th,) Sandwich platform. Work incl. provdg
good quality & even shade polish kota stone of required size having uniform
thickness. Work also incl. providing nece. Dismentling of brick work for making jari to
support the etc.comp.(app rate)
The rate shall be for a unit of one square meter.
As per Item and instructed by engineer incharge
Item No 26 :- P/F glass of 4 mm thik for vent lowers and window with wooden border patti as per
instruction of eng. In chage.(app.rate)
The rate shall be for a unit of one no.
As per Item and instructed by engineer incharge
Item No 27:- Making hole in brick wall & all damaged work shall be well repaired as per inst. etc.
The rate shall be for a unit of one no.
As per Item and instructed by engineer incharge
Item No 28:-Provdg. & fixing rubber plug for sink or wash basin.
The rate shall be for a unit of one no.
As per Item and instructed by engineer incharge
Item No 29:-Providing and fixing 30 mm thick approved standard brand factory made PVC rigid
foam paneled door shutter manufactured by made from m.s. cube 19 guage
thickness size 19 x 9 mm for styles and 15 x 15 mm for top and bottom rails , covered
with heat moulded PVC '''' C channel of 5 mm thick sheet and 30 x 50 mm wide to
foam styles and 5 mm thick and 75 mm wide PVC sheet for top rail, lock rail,
and bottom rail on either side and 5 mm thick, 20 mm wide cross PVC sheet as gap
insert for top rail and bottom rail , paneling of 5 mm thick PVC sheet filled in the
MS frame welded / shield to the styles and rails with 5 x 30 mm PVC sheet
beading on either side and joined together with solvent cement adhesive
etc. complete as per manufacturers applications and directions of engineer in
charge fixed to frames with three nos .Stainless Steel hinges (four inch long)
incl.medium grade aluminium hardware all octroi, tax charges etc.complete
The rate shall be for a per smt.
As per Item and instructed by engineer incharge
Item No 30 :- Providing and fixing approved standard brand factory made PVC door FRAME of
size 50 x 47 mm with a wall thickness of 5 mm made out of extruded 5 mm rigid
PVC foam sheet mitred at corners and jointed with 2 Nos. of 150 mm long
brackets of 15 x 15 mm M.S.square tube the vertical door profiles to be reinforced
with 19 x 9 mm M.S.square tube of19 guage, EPDM rubber gasket weather seal to
be provided through out the frame. The door frame to be fixed to the wall using
M.S.screws of 65/100 mm size etc.complete as per manufacturers specifications
and direction of Engineering in charge incl. medium grade aluminium hardware all
octroi, tax charges etc.complete
(item code no-10050 sor-15-16)
The rate shall be for a per rmt.
Item No 31 :- Providing and fixing pre laminated PVC rigid foam sheet manufactured by approved
standard brand wall paneling of thickness 5 mm stuck on inner frame work of 35 mm
wide strips of 5 mm thick PVC rigid foam sheet. The strips should have in their centre
a groove of 6 mm width and 2 mm depth for sinking the head of the screw used to fix
the strips to the wall and should be placed vertically at equal intervals of 405 / 407 mm
center to center. The PVC strips to be fixed to the wall using 65 mm long M.S. screws
through the groove in the strip by using PVC fasteners. the distance between two
screws shall not be more then 300 mm. A groove of 2 mm to be left at the joint of two
panels for aesthetic look.
Item No 32 :- Providing and fixing 35 mm th. Shutters for doors windows & clearstory windows
incl. wood frames as specified 12 cm. x 7cm. size incl. anodised alluminium fixtures
and fastenings including primer coat of approved quality and two coats of oil paint etc.
complete. Bldg.s.o.r.2015-2016 ,ch.no.10, it code 10032a, 10032b, 10032c)
(I) Fully glazed
(II)Fully panelled
(III) Partly panelled & partly glazed.
1.0 Materials: Indian teak wood shall conform to M-29. Glass shall conform to M-38.
2.0 Workmanship: The relevant specifications of item no 10.1 (A) shall be followed for frame work
except that the framework of 10x 7 cms. Size of required size ventilators shall be provided with
glazed glass louvers. The glass louvers shall be provided as directed. In the groove of 1.25 cms.
Depth made in frames, the thickness of glass shall be 5 mm and glass shall be glass of best quality.
The ventilation blades shall slope down towards the outside at an angle of 45
3.0 Mode of measurements and payment:
3.1 The area of opening within the frame in which louvers are fixed shall be measured in sq. meters
3.2 The rate includes painting 3 coats to wood work with ready mix paint.
3.3 The rate shall be for a unit of one square meter.
As per Item and instructed by engineer incharge
Item No 33 :- Providing And Laying Glazed Tiles 6 Mm Thick In Flooring Treads Of Steps
And Landing Laid On A Bed Of 12Mm Thick Cement Mortar 1:3 (1 Cement : 3 Coarse
Sand) Finished With Flush Pointing In White Cement.(P.183,Item No.14.29(A),14008A)
Item No 34 :- Providing And Laying Glazed Tiles 6 Mm Thick In skirting risers of Steps and
dedo 10Mm Thick Cement plaster 1:3 (1 Cement : 3 Coarse Sand) Finished With
Flush Pointing In White Cement slurry.(P.183,Item No.14.32),14009A)
Materials : Water shall conform to m –1 cement mortar shall conform to M-11 white glazed tiles shall
conform to M-55.
1.0 Workmanship:
1.0 The work shall be carried out for skirting as dedo. Before fixing precast terrazzo (Mosaic marble)
tiles of shade and size as specified, the surface shall be prepared by heavy scarping, making joints
etc. to the required line, level and plumb. The surface shall be thoroughly wetted before commencing
the laying work. Thereafter about 10 mm. thick backing of cement mortar in specified proportion shall
be applied on the surface in true like and level generally as per specifications of plaster item.
2.2 Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour
and the mosaic tiles shall then be gently tapped against the surface, with a wooden mallet. The
skirting shall be done only after the flooring is competed. Any pipes coming out of the wall through
the dedo or skirting shall only beat at the intersections of the horizontal and vertical joints. The tiles
shall not have staggered joints. The joints shall be true to entire line both ways and vertical joints
shall be in line with joints of flooring. Tiles shall be fixed as close as possible to the adjoining tiles
and any difference in the thickness of the mosaic tiles shall be evened out in the cement paste so
that all the tiles faces are set in conformly with one another. The skirting shall project uniformly and
not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo shall be
truly horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever
required. The tiles shall be cut (sawn) and thin edges smoothened before use.
2.3 Curing : Curing shall be done for 7 days continuously.
2.4 Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface.
In case of skirting only 10 mm. x 10 mm. grove shall be provided at the junction of cement plaster
and cement tiles.
2.1.2 The white glazed tiles shall be laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The
mortar shall have sufficient plasticity for laying and there shall be no hard lumps that would interfere
with the evenness of bedding the base shall be cleared with well wetted. The mortar shall then be
spread in thickness not less than 10 mm at any place and average 12 mm thickness. The proportion
of the cement mortar shall be as specified in the item.
1.1 Fixing tiles :
1.1.1 The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at
3.3 Kg/Cement /Sq. mt. Of honey like consistency shall be separated over the mortar bedding as
directed. The edges of the tiles be smeared with neat cement slurry. The tiles shall be well pressed
and gently tapped with a wooden mallet till they are properly bedded and in level with the adjoining
tiles. There shall be no hollows in bed or joints. The joints between the tiles shall be as thin as
possible in straight line or as per pattern.
1.1.2 The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni
trap coming in the flooring shall be so positioned that its grating shall replace only one tile as far as
possible. Where full size tiles cannot be fixed, they shall be cut (swan0 to be required size and the
edges rubbed smooth to ensure straight and true joints. The joints shall be filled with grey cement
grout with wire brush of trowel to a depth of 5 mm. and loose material removed. White cement shall
be used for pointing the joints., After fixing the tile finally in an even the flooring shall be kept wet
and allowed to nature undisturbed for 7 days.
1.2.1 The surplus cement grout that may have come out of the joints shall be cleared off before it sets.
Once the floor has set, it shall be carefully washed, cleared by dilute acid and dried. Proper
precaution and measures shall be taken to ensure that the tiles are not damaged inany way till the
completion of the construction.
2.0 Mode of measurement & payment
2.1 The work done shall be measured in sq. mt. For visible area of work done, The length and width of
the flooring shall be measured not between the faces of skirting or dedos or plastered face of wall
as the case may be. The paving under dedo or skirting shall not be measured. No deduction shall
be made not extra paid for any opening in the floor of area upto 0.1 sq. mt. Nothing extra shall be
paid for laying the floors at different levels in the same rooms.
3.0 Mode of measurement & payment
3.1 The work done shall be measured in sq. mt. For visible area of work done, The length and width of
the flooring shall be measured not between the faces of skirting or dedos or plastered face of wall
as the case may be. The paving under dedo or skirting shall not be measured. No deduction shall
be made not extra paid for any opening in the floor of area upto 0.1 sq. mt. Nothing extra shall be
paid for laying the floors at different levels in the same rooms.
3.2 The rate shall be for a unit of one sq. metre.
Item No 35 :- Providing and laying coloured glazed tiles of the size 300 mm x 200 mm x
8 mm / 300 mm x 450 mm x 8 mm in skirting, risers of steps and dedo on 10 mm. thick
cement plaster 1:3 (1 cement : 3 coarse sand) & jointed with white cement slurry.
The rate shall be for a unit of one sq. metre
Item No 36 :- Providing and fixing rough cast wired glass 6 mm thick bedded in putty and thick with
wooden beading including the cost of wooden beadings of Indian teak wood and
necessary cutting of glass. (P.169,Item No.13.3,13002)
(C) wired figured glass.
The rate shall be for a unit of one sq. metre
Item No 37 :- Supplying And Fixing Nimbhada Ladi 37 To 50 Mm Thick For Walk-Way, Covering The
Activity Of Excavation, Ramming, Laying On Sand Bedding As Per Requirement
To Fix The Nibhada Stone In Line & Level With Cement Pointing In Cement Mortar
1:2 Etc Complete As Directed.
Item No 38 :- Labour work for fixing above or any interlocking blocks/nimbhada on up to 50mm th
sand bedding,levelling,watering anf fixing. Rate incl. average 30cm depth for
excavation and or filling,carting away debries/excavated material up to 5 km and
cleaning the site etc.comp. as directed.I00194
Labour work for f ixing above inter locking block on up to 50 mm th, sand bedding level ing,
water ing and f ixing. Rate average 30 cms depth excavation and of f i ll ing, car t ing away debr is
/ excavated mater ials up to 5.0 kmt. Cleaning the site etc. comp. as directed.
C.C. Block shal l be laid on 50 mm the sand bedding, level ing, etc. comp. Rate also includes up
to 150 mm thick excavat ion and / f i l l ing and car t ing away derbr ies / excavated mater ials up
to 5 kms lead. Excavat ion shal l be done to the reqd. depth & level & grade as shown to the
contractor . The foundat ion bed should be watered and consol idation before the bedding is laid.
Block shal l be laid in l ime and level as per design / pattem approved by AMC. In propor tion of
coloured blocks.
Mode of payment shall be in Sq. mt. basis
Item No 39 :- Providing & Laying China Mosaic Flooring On Terrace With 6Mm Th.White Or Coloured
Glazed Tiles Chips Of Mini.25 To 35Mm Approved.Square Or Rectangular Shape &
Fixing It.Before Start The Work Remove All Existing Flooring & Open Old Slab Surface
With Wire Brush & Fill Crack If Shown With Water Proof Material.Than For Making Level
Gps.Work Done In Mini.45 To 50 Mm Th.& Fixing.China Mosaic In Cm 1:3 With
Neat Cement Slurry At Top & Filling The Gap With White Or Colour Cement With
Finishing Smooth Surface & Even Shade Incl.Cleaning Of All Dirt,Dust &
Other Foreign Matter.Rate Including For Making Colour Patta,Round Vata With
Fixing Neccessary Water Spout Opening Gap Etc.Comp.As Directed.(As per A.R.C)
(1) China Chips in required colours specially broken from full tiles in required size
(2) Cement (3) Sand (4) White Cement (5) Steiner
Before laying a final layer of China Chips prepare the surface to the required slope and level with a
backing coat in C.M (1:3). While laying a backing coat, spread a layer of thick cement slurry and scrub the
same vigorously to seal all pores in concrete below.
For the required designs prepare templates for different patterns from steel flats or plywood and mark out
total design on the designated area. Estimate the quantity of Chips of different colous and ensure its
uninterrupted supply before starting the work. Lay the chips flat on the bedding coat and fix tightly be light
hammering. Remove grey cement from the joints by scrapping before final set of cement.
Finish the joints neatly with white cement and harmonious colour Steiner. All design and pattern shall be
finished with first class workmanship. The surface should finally cleaned, given a mild acid wash for gain the
luster of China Chips.
Cost of China Chips, White cement, OPC, Sand, Steiner and all labour for leveling, laying by specialist
artisan, preparing templates, testing etc are included.
Mode Of Measurment :
Dimensions of total finished area as laid are recorded and area is computed in sq.m., rounded to two places
Item No 40 :- Providing Cement Vata (10 Cms X 10 Cms)Size Quarter Round In Cement Mortar 1:1
Including Near Cement Finishing, Watering Etc. Complete.(P.203,Item No.0.0 17015)
The rate shall be for a unit of one running metre basis.
Item No 41 :- Providing, supplying and fixing precast C.C. blocks (M-20) edge kerb having size of
75 x 300 x 300 mm depth and as per design conveying it to the site, jointing into C:M
1:3 and racking out the joints incl. necessary excavation of asphalt, soil etc..completed.-
The curb shall be M-20 of size 300 x 300 x 75mm it shall be laid in proper line and camber and jointing vata in
C.M. 1:3 prop. Including the activities of excavation, ramming etc. comp.
Trenches of specified width and depth shall first be mode along the edges of the wering course of the road of
along the line of pave block flooring to receive the restraint block. The bed of the trenches shall be compacted
manually with steel rammers firm and even surface and then stones shall be set in P.C.C. The edge restraint
blocks shall be laid with their length running parallet to the paving edge, true in line and gradient. The joints of
blocks shall be not more than to mm and filled with the CM 1:3 (1 cement: 3 fine sand) which shall be cured for
The edge shall be restored and all surplus earth including rubbish etc. disposed off as directed by the engineer
Length of the finished work shall be measured in running meter along the edge of the paving correct to a cm.
The rate shall include the cost the materials and labour including stone of specified materials involved in all the
operation described above. Sampling for testing on kerb shall be done Sampling for testing on kerb shall be done
in accordance with appendix – A as per Item No. 08. Testing for compressive strength relevant shall be
undertaken in accordance with I.S. Code.
The Mode of measurement and rate shall be given as per one running meter basis.
Item No 42 :- Conveyance charges of earth lime, murrum, building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregate of any kind etc. comp. upto 5 km lead. (Bldg.S.O.R.
All the surplus earth and debries remaining on site after sufficient watering shall be carried away
immediately from site of work to the place within 5 km distance as directed by the Eng. In Charge,
so as not to cause any inconvenience to the public or traffic.
If the instruction of the Eng. In Charge of work are not followed within 7 days from the site,
the work shall be carried out by the Municipal Corporation at the risk and cost of the contractor and
any claim / dispute will not be entertained in the respect.
If the filling in the trenches after subsidence of the earth filled in is to be done the same shall
be carried out at contractor’s risk and cost. No extra payment shall be made for the such work.
The contractor shall take care of the surplus earth after the trenches are well watered and
refilled with earth.
If required the carting shall be carried out during night also without any extra cost.
All work shall be carried out as directed by Engineer-in-Charge.
Mode of measurement
Payment shall be as per cubic meter. Rate including cost of all materials, labour,
machinery, and equipment as directed.
Item No 43 :- Providing & Fixing M.S.Grill,Gate,Elevation Element Of Decorative Pattern With
M.S.Channel,Flat,Medium Grade M.S.Pipe,Square Or Round Bars With Round Heanded
Bolts,Nuts,Or By Screw.Incl.Applying One Coat Zinc Primer And Two Coat Of Oil
Paint Etc.Comp.(as per A.R.C))
1.0 Materials : The structural steel shall conform to M-22.
2.0 Workmanship:
2.1 The M. S. Grill shall be prepared as per the drawings or as directed for fixing to wooden frames of
2.2 The grill shall be fabricated to the designs and patterns shown in the drawings and the weight shall be
as directed and the joints shall be riveted or welded as shown in the plan or as directed. The grill so
formed shall be fixed into the frames of the windows etc., before they are erected in position. The
outside strip frame of the grill shall be housed to its full thickness into the recess cut into the frame
of the windows etc. The grill shall be fixed to the frame with number of bolts and nuts of screws viz.
bolt nut/screw per 30 cm. Of the length of outer strip subject to a minimum of 2 nos. on each side of
the frame or as indicated in the drawings or as directed.
2.3 The bolts and nuts or screws shall be counter sunk and shall be fixed with the top of their heads flush
with the face of frame strips.
3.0 Mode of measurement and payment:
3.1 No payment shall be made for weight of screws, bolts, nuts etc. Only weight of grill shall be paid.
3.2 The rate shall be for unit of one Kg.
Item No 44 :- Providing & Laying 18 mm thick Mirror polish granite For flooring , counter , stair -riser
, tread , skirting , dedo etc. machine cut or chiselled on bed of cement mortar 1:1
pointing with neat cement slurry incl. moulding etc. comp. as per instruction of engineer
in charge. (Bldg. s.o.r 2015-2016,sr.no23 ch.no.14 )
As per Item and instructed by engineer incharge
The measurement shall be given in one smt basis
Item No 45 :- Providing & fixing 2.00 mm thick F.R.P. sheet of good quality and standard make rate
also includes necessary fabrication structure in the grid of 1'-6" x 1'-6" size usiung
hollow pipe of size 3/4" x 3/4" , 2" x 1" & 1" x 1" rate also inclusive necessary bending
,cutting and fabrication charges and priming coat and 2 coats of oil paint of shade
approved by engineer in-charge rate also includes washer and silicon paste required
for fixing the sheet in good quality as diredted.(As per ARC)
As per Item and instructed by engineer incharge
The measurement shall be given in one smt. Basis
Item No 46 :- Carrying out plinth treatment to post construction / exsiting structure by spraying
chenical solution for termite control treatment incl. labour and materials consistant with
I.S.I specification.(Bldg.s.o.r. 2015-2016 ,sr.no.7,Ch.22)
As per Item and instructed by engineer incharge
The measurement shall be given in one smt. Basis
Item No 47 :- Carrying out timber treatment to all wood work incl. drilling holes and spreying oil
based chenical solution on surface ot timbner work for termite contorl including labour
and materials etc. comp (Bldg.s.o.r.2015-2016,sr.no.5, Ch-22 )
As per Item and instructed by engineer incharge
The measurement shall be given in one smt. Basis
Item No 48:-Provdg. & fixing 100 mm size P or S trap for water closet squatting pan incl. jointing
the trap with the pan & soil pipe in cement mortar 1 :1 (cement : 1 fine sand) (Bldg.Sor 15-
(A) Vitreous China :
(B) The measurement shall be given in no. Basis
Item No 49 :- Providing and fixing wash down water closet (Europeantype,W.C.Pan) with integral P
or S trap including jointing the trap with soil pipe in Cement Mortar1:1(1-Cement:1-
finesand) (Sea land cover to be measured and paid for separately) (A)vitreous China
Pattern :(i) in white colour (Bldg.Sor 15-16) page no-263,it no-23.112,23010
As per Item and instructed by engineer incharge.
The measurement shall be given in each no. basis
Item No 50 :- Providing and fixing water closet s quatting P an (IndiantypeW.C.Pan)size580mm
(Earthwork,bedconcrete,footresteandtraptobemeasured and paid for
separately)(A)VitreousChina.(I)Long pattern = White colour (Bldg.Sor 15-16) page no-
As per Item and instructed by engineer incharge.
The measurement shall be given in each no. basis
Item No 51 :- P/F. wash basin with single hole for pillar tap with C.I. or M.S. brackets painted white
incl. cutting holes and making good the same including all necessary fittings like bottle
trap CP waste coupline, pillar tap, stop cock, lead connections (At any floor (a) Viterous
China : : 550 mm x 400 mm size white/ colour(Bldg.Sor 15-16,ITEM NO.23.127,23018)
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 52 :- Provdg. & fixing C.P. Brass screw down bib taps of following size Bldg.s.o.r.2015-
The measurement shall be given in one no. basis
Item No 53 :- Providing & Fixing Angle Cock Of "Ess Ess" Trend Series Or Equivalent Standard
Make As Approved By Engg.In Charge All Complete.(N.S.)I00103
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 54 :- Provdg. & Fixing Gun Metal Check Or Nonruturn Full Wheel Valve. (P.269,Item
No.23.99 A To D) (A) 15 Mm Dia
1.0 Materials :
1.1 The gun metal check or non return full way wheel valve of specified dia. shall conform to I.S. 778-
1964. The non return valve shall be of tested quality.
2.0 Workmanship :
2.1 The gun metal check or non return valve shall be fully cleared of all foreign matter before fixing. The
fixing of valve shall be done by means of bolts nuts and 3 mm. rubber insertions with flanges of
spigot and socketed tail pieces, drilled to the same specification as in case of socket and spigot and
with flanges in case of flanged pipes. The jointing shall be done leak proof.
3.0 Mode of measurements & payment :
3.1 The rate includes all labour, materials, tools and plant etc. required for satisfactory completion of
3.2 The rate shall be for a unit of one number
Item No 55 :- Supplying nece hardware,G.I. Fittngs etc.comp of app.quality as under
(a)1/2 '' Half turn bib cock
(b)1/2 '' Gun metal check or
nonruturn full wheel valve.
(c) 1/2 '' Piller tap
(d) 1/2 '' stop cock
(e) 1/2 '' G.I. Nipple -3 "'
(f) 1/2 '' G.I. Nipple -6 "'
(g) 1/2 '' G.I. Nipple -9 "'
(h) 1/2 '' G.I. Nipple -12 "'
(j) S.S.Soap dish
(l) PVC 1/2 '' Half turn bib cock
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 56 :- Provdg. & fixing ball cock of approved qaulity as directed. (23037A1,SOR-15-16)
(A) Copper metel.
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 57 :- Provdg. & Fixing Flat Back Large Urinal of White/ color of "Cera" or " Hindware" incl.
C.P. Brass waste coupline , waste pipe, pvc connection etc. Complete.( size
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 58:- Providing & Fixing Chromium Plated Brass Flush Cock With Lever Of "Ess Ess"
- Trend Series Or Equivalent Make Incl.Fixing In Pipe Etc.Comp.As Dir.Of Engg.In
Charge.(N.S.) (1) 25 Mm Dia.I00117
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 59 :- Provdg. & fixing 600mm x 450 mm Bevelled edge mirror of superior glass mounted of
.6 mm th. A.C. sheet or plywood sheet and fixed to wooden pluge with C.P. brass screws
and washers.Bldg.s.o.r.2015-2016,it. No.23.143 Ch-23 )
As per Item and instructed by engineer incharge
The measurement shall be given in one no. basis
Item No 60 :- Provdg. And Fixing Cast Pvc/C.I.(Span) Nahni Trap Of The Following Nominal
Diameter Of Self Clenising Design With C.I. Scread Down Or Hinged Gratiing Incl.
Cost Of Cutting & Making, Good The Walls And Floors 100 Mm Inlet And 50 Mm Outlet
Etc.Comp.(P.263,Item No.23.857)23008
1.0 Materials :
1.1 The cast iron (spun) Nahni trap shall be conform to M-69. The C.I. hinged of screwed down cover
shall be of best quality.
2.0 Workmanship :
2.1 The Nahni trap with 100 mm. dia. inlet and 50 mm. dia. outlet shall be fixed as per drawings or as
2.2 The Nahni trap shall be jointed with C.I. Pipe, 75 mm. dia. with lead joints. The lend joints shall be
done in conformation with I.S. 782-1976.
3.0 Mode of measurements & payment :
3.1 The rate includes cost of all labour, materials, tools and plants etc. required for satisfactory
completion of this item including lead jointing and testing.
3.2 The payment of seat and cover shall be made separately.
3.3 The rate shall be for a unit of each one number.
Item No 61 :- Provdg. & fixing plastic seat & cover for wash down water closet with C.P.brass hinges
and rubber buffers.(P.265,Item No.23.121)23017(B) plastci seat & cover
(B) plastci seat & cover
As per Item and instructed by engineer incharge.
The measurement shall be given in each no. basis
Item No 62 :- Provdg. & fixing 12.5 lit.PVC Flush tank with nece.fixtures etc.comp as per site
condition (Bldg.Sor 15-16)
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 63 :- P/F Jet Spreay at Europeon WC Pan, incl nece. lath connection, stop cock, and other
fixing material and labour as per inst. of engineer in charge
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 64 :- Providing & Fixing Polytheline Over Head Tank With Necessary Dia.Holes For
Outlet,Inlet Over Flow And Washout Necessary Washer And Checkput Etc.Comp.(N.S.)
As per Item and instructed by engineer incharge
The measurement shall be given in Liter basis
Item No 65 :- Providing & Fixing Door closer-complete of Approved make to wooden / Alluminium
Doors as per direction of engg.in charge.(N.S.)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one no. basis
Item No 66 :- P & F app.quality for Conseal lock in Alu.door .as per inst of engg in charge
.etc.comp.(app.rate)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one no. basis
Item No 67 :- P & f app.quality for brass baby latch (door stopper) as per inst of engg in charge
.etc.comp (app.rate)
As per Item and instructed by engineer incharge.
The rate shall be for a unit of one no. basis
Item No 68:- Providing & Fixing In Position Alluminium Doors With Frame Using Approved Quality
Anodised Extruded Alluminium Section As Approved By Engg.In Charge(Jindal
Alluminium) (A)Frame Sections 101.6x44.45 Mm(B)Shutter Bottom Vertical & Top
Section 83.5x44.45 (Wt.1.31 Kg/Mt.)(At 1.31Kg/Mt)(C)Shutter Bottom Section
At14.3x44.45 Mm At (1.37 Kg/Mt) Shutter Middle Section At 100x44.3 Wt.(1.37Kg/Mt)
Incl.Providing & Installing 5 Mm Thick Approved Color Acrylic Sheet Of Standard
Quality Fixed With Glazing Chips On Upper Pannel & Laminated Sheet On
Lower Pannel (Wtt.0.13 Kg/Rmt) Etc.Comp.As Direction Of Engg.In Charge.
As per Item and instructed by engineer incharge.
The rate shall be for a unit of one smt basis
Item No 69 :- Providing & Fixing In Position Alluminium Window Sliding / Fix Type With Frame Using
Approved Anodised Extruded Alluminium Section As Approved By Engg.In
Charge.(Jindal Alluminium) Units Equivalent (A) Frame Sections 65 X 25 Mm (At
0.41kg/Mt) (B) Sliding Frame Bottom Section Of 61.85 X31.75 Mm (At 0.41 Kg/Rmt)
(C) Shutter Top & Bottom Section 40 X 18 Mm (Wt.0.41 Kg/Rmt) (D) Shutter Interlock
Vertical Section 10 X18 Mm.(0.41 Kg/Rmt) (E) Shutter Vertical Of 40 X 18 Mm (0.41
Kg/Rmt) Including P/F Installing 5 Mm Thick Approved Color Acrylic Sheet Of
Standard Quality Etc.Comp.(N.S.)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt basis
Item No 70 :- Provding & fixing Aluminum section partition with powder coating using 2.5'' x
1.5'' all section work incl.p/f 5 mm thick glass in upper portion and 10 mm th. Novapan
panel in lower section Work incl.fixing the partition in wall/floor with
nece.screws,rubber gasket & other fittings etc.comp. as directed by engg.incharges.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt basis
Item No 71 :- Providing & Fixing In Position Alluminium Vents With Frame Using Approved
Anodised Extruded Alluminium Section As Approved By Engg.In Charge.(Jindal
Alluminium) Units Equivalent (Approved Rate) Frame Section Of 63.50 X 38.50Mm
(Wt.0.68 Kg/Rmt) Incl.Providing & Installing 5 Mm Thick Approved Color Acrylic Sheet
Of Standard Quality Etc.Comp.I00136
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt basis
Item No 72 :- Providing and fixing in position collapsible steel shutters with vertical channels
20x10x2 mm braced with flat iron diagonals 20x5 mm size with top & bottom rails of T-
iron 40x40x6 mm with 38 mm dia. Steel pulleys complete with bolts , nuts , locking
arrangement , stoppers , handles including applying a priming coat of red lead paint &
two coats of enamel paint of selected shade & approved make. ( Bldg.s.o.r.2015-2016,it.
Materials: The collapsible steel gate shall conform to M-33.
T-rails shall be fixed to the floor and to the lintel at top by means of anchor bolts, embedded
in cement concrete on floor and lintel. The anchor bolts shall be placed approximately at
mm centers alternatively in the two flanges of the T iron. In the bottom runner (T-iron) shall
be embedded in the floor and proper groove shall be formed along the runner for the purpose.
The collapsible gate shall be fixed at the sites by fixing the end double channels in the T-Iron
rail and also by hold fasts bolted to the end double channel and fixed in the masonry of the
side walls or the otherwiseIn case where the collapsible gate is not required to the lintel
beams or slop above, a tee iron suitably designed may be fixed at the top embedded in
masonry and provided with necessary clamps and roller arrangement at the top.
All the adjoining work damaged while fixing of gate shall be made good to match the existing
work without any extra payment.
All the members of the collapsible gate including T-Iron shall be thoroughly cleaned of rust,
scales, dust etc. and given a priming coat of red lead before fixing them in position.
Mode of measurements and payment:
The collapsible gate shall be measured in sq. meter. The height of the gate shall be
measured as the length of double channels and breadth from outside to outside of the end
fixed double channels in open position of the gate. The rate includes providing handles,
locking arrangements, stoppers etc.
The rate shall be for unit of one sq. meter.
Item No:-73 :- Providing corrugated 0.80 mm (22 gauge) thick G.I. sheets roofing fixed with
galvanized iron ‘J’ or ‘L’ hook bolts, and nuts 8 mm. dia with bitumen and G.I. limpet
washers filled with white lead complete excluding the cost of purlines, rafters and
trusses. ( Bldg.S.O.R. 2015-2016 It. no.15.1 )
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt basis
Item No 74 :- Providing valleys 900 mm. overall in plain 1.6 mm. thick G.I. sheet Class – 3 fixed with
‘J’ or ‘L’ hook bolts and nuts galvanized from ‘J’ or ‘L’ hook bolts and bitumen washers
complete.( Bldg.S.O.R. 2015-2016 It. no.15.8 )
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt. basis
Item No 75 :- Providing and fixing rolling shutters of approved make made of 80 mm wide M.S.laths
interlocked together through their entier length & joinned together at the enda by &
locks mounted on specially design pipe shaft with bracket plates giudes channel &
arrangement for inside & out side locking with push pull operation incl. the the hood
cover & spring etc. including priming , oil painting etc complete.( Bldg.S.O.R. 2015-
(A) Shutters having width below 3.5 meter
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt basis
Item No 76 :- Provdg. & fixing UPVC handle valve of Prince,Supreme , Astral, finolex or equivalent
make as per dir. Of engg. In charge.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one no. basis
Item No 77:- Provdg. And fixing to wall ,ceiling and floor 6.00 kg. F/Sq.Cm working pressure
polythelene pipes of the following outside diameter, low, density, complete with special
flange compression type fittings, wall clips etc. making good wall ceiling and floor.
1.1 The low density polythene pipe of specified diameter with 10 Kg/Sq.cm. working pressure shall
conform to I.S. 3076/1968. The specials and fitting required shall be of best quality.
1.0 Workmanship :
2.1 The P.V.C. Pipes of specified diameter shall be fixed as directed. Due to thermal expansion of rigid
P.V.C. Pipes, due allowance shall be made particularly in over ground pipe lines for any change in
length of pipe line which may occur during installation or when pipe line is in service.
2.2 Above ground installation of rigid P.V.C. pipe should be undertaken after preparations are observed
for their protection against direct sun rays and mechanical damage.
2.3 The rigid P.V.C. pipe lines should not be kept exposed above ground when if passes through public
places, railway lines, road side and foot paths.
2.4 P.V.C. pipes shall be supported at the following intervals :
20 mm dia. 500 mm. 32 mm. dia. 900 mm.
25 mm. dia. 750 mm.
2.5 Closer support spacing shall be provided if recommended by the manufacture.
2.6 The guide lines indicated by the manufacturer regarding, handling, transportation, storing laying and
jointing of pipes shall be kept in view during execution.
2.7 P.V.C. pipes shall be fixed on wall with wooden plugs and suitable plastic clamps.
2.8 Jointing the pipes :
2.8.1 The pipes and sockets shall be accurately cut. The ends of the pipes and fittings should be absolutely
free from dirt and dust. The outside surface of the pipes and the inside of the fittings shall then be
roughened with emery paper, and then solvent cement joint. Since solvent cement is aggressive to
P.V.C., care must be taken to avoid applying excessive cement to the inside of pipe sockets as any
surplus cement cannot be wiped off after jointing. Empty solvent cement tins, brushes rags, or paper
unpregnated with cement should not be buried in the trenches. They should be gathered, not left
scattered about, as they can prove to be a hazard to animals, which may chew them.
2.8.2 If manufacture recommends its own methods of jointing, the same shall be adopted after necessary
approval from the Engineer-in-charge.
2.9 Laying pipes in Trenches :
2.9.1 The pipe shall be laid over uniform relatively soft fine grained soil found to be free of presence of
hard objects such as large flints, rocky projections, large tree roots etc. The width of the trenches
shall be minimum width required for working.
2.9.2 The pipes laid underground shall not be less than one metre from the ground level. The pipe shall
be positioned in the trenches so as to avoid any induced stresses due to deflection. Any deviation
required shall be obtained by using proper type of rubber ring joints.
3.0 Mode of measurements & payment :
3.1 The relevant specifications of item 23.2 (A) shall be followed except that the P.V.C. pipes of specified
dia. shall be paid under this item.
3.2 The unit rate shall be for a unit of one running metre.
Item No 78:- P/F. To Wall Ceiling And Floor 10.0 Kgf/Cm2 Working Pressure Pvc Pipes Of The
Following Outside Dia Complete With Special Flange Type Fittings,Wall Clamps Incl.
All Necessary Fittings Etc. Complete. (At Any Floor Level)I00226 (A) 75mm Dia.
I00227 (B) 75mm Dia.
I00227 (B) 110mm Dia.
2.0 Materials :
1.1 The low density polythene pipe of specified diameter with 10 Kg/Sq.cm. working pressure shall
conform to I.S. 3076/1968. The specials and fitting required shall be of best quality.
3.0 Workmanship :
2.1 The P.V.C. Pipes of specified diameter shall be fixed as directed. Due to thermal expansion of rigid
P.V.C. Pipes, due allowance shall be made particularly in over ground pipe lines for any change in
length of pipe line which may occur during installation or when pipe line is in service.
2.9 Above ground installation of rigid P.V.C. pipe should be undertaken after preparations are observed
for their protection against direct sun rays and mechanical damage.
2.10 The rigid P.V.C. pipe lines should not be kept exposed above ground when if passes through public
places, railway lines, road side and foot paths.
2.11 P.V.C. pipes shall be supported at the following intervals :
20 mm dia. 500 mm. 32 mm. dia. 900 mm.
25 mm. dia. 750 mm.
2.12 Closer support spacing shall be provided if recommended by the manufacture.
2.13 The guide lines indicated by the manufacturer regarding, handling, transportation, storing laying and
jointing of pipes shall be kept in view during execution.
2.14 P.V.C. pipes shall be fixed on wall with wooden plugs and suitable plastic clamps.
2.15 Jointing the pipes :
2.15.1 The pipes and sockets shall be accurately cut. The ends of the pipes and fittings should be absolutely
free from dirt and dust. The outside surface of the pipes and the inside of the fittings shall then be
roughened with emery paper, and then solvent cement joint. Since solvent cement is aggressive to
P.V.C., care must be taken to avoid applying excessive cement to the inside of pipe sockets as any
surplus cement cannot be wiped off after jointing. Empty solvent cement tins, brushes rags, or paper
unpregnated with cement should not be buried in the trenches. They should be gathered, not left
scattered about, as they can prove to be a hazard to animals, which may chew them.
2.15.2 If manufacture recommends its own methods of jointing, the same shall be adopted after necessary
approval from the Engineer-in-charge.
2.9 Laying pipes in Trenches :
2.9.3 The pipe shall be laid over uniform relatively soft fine grained soil found to be free of presence of
hard objects such as large flints, rocky projections, large tree roots etc. The width of the trenches
shall be minimum width required for working.
2.9.4 The pipes laid underground shall not be less than one metre from the ground level. The pipe shall
be positioned in the trenches so as to avoid any induced stresses due to deflection. Any deviation
required shall be obtained by using proper type of rubber ring joints.
3.0 Mode of measurements & payment :
3.3 The relevant specifications of item 23.2 (A) shall be followed except that the P.V.C. pipes of specified
dia. shall be paid under this item.
3.4 The unit rate shall be for a unit of one running metre.
Item No 79:- Provdg. And fixing to wall, ceiling & floor in true line and level UPVC pipe Schedule-
of Prince , Supreme , astral , finolex or equivalent make as approved by engg. incharge.
pipe shall be fix on wall with the help of clamp at every twi meter center to center of
shall be concealed as directed in cluding neccesarry fitting etc. in cluding testing of
pipe and jointd and fixing the same with adhesive solvent , including cost of all
materials of following nominal bore Bldg.s.o.r.2015-2016,it code 23061. 23062,
As per Item and instructed by engineer incharge
The rate shall be for a unit of one rmt basis
Item No 80:- Providing & Laying & Jointing glazed stoneware pipes incl. excavation up to
mt.,refilling, trasporting the pipe to work site, unloading, lowering in trenches, laying
and jointing the pipes in c.m. 1:1 incl. all jointing materials such as cement, sand, hemp,
bitumen as dire. testing the pipe line to a head of 1.5 mt. and hydraulic test as dire incl.
watering trenches, spreading , and carting away of surplus earth within 100 mt.lead as
dire. etc. comp.Bldg.s.o.r.2015-2016,it. No.24.1 Ch- 24)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one rmt basis
Item No 81:- P/F. to wall ceiling and floor galvanized mild steel tubes (Medium grade) of the following
nominal dia. with all tube fittings and clamps incl. making good the wall, ceiling and
floor. (At any floor level) (Bldg.Sor 2015-16,23.2,23001 a to 23001d)
1.0 Materials: Galvanized mild steel tubes of specified dia. nominal bore shall conform to I. S.
1239-1968. The galvanized fittings, clamps, etc. required for specified dia. bore pipes shall
be of best quality and make as approved by the Engineer-in-charge.
2.0 Workmanship :
2.1 Cutting, Laying and Jointing :
2.1.1 When the tubes are to be cut or retheraded, the end shall be carefully filed out so that no
obstruction to bore in offered. The ends of the tubes shall then be threaded conforming to
the requirements of I. S. 554-1955 with pipe dies and taps carefully in such a manner as will
not result in slackness of joints when the two pieces are screwed together.
2.1.2 The taps and dies shall be used only for straightening screw threads which have become
bent or damaged and dies shall not be used for turning of the threads so as to make them
slacks as the latter procedure may not result in watertight joints. The screw threads for tube
and fittings shall be protected form edge unit they are fitted.
2.1.3 In jointing the tubes, the inside of the socket and the screwed end of the tubes shall be oi8led
and smeared with white or red lead an wapping around with a few turn of fine spun yarn
round the screwed end of the tube. The end shall then be tightly screwed in the socket, tees
etc. with a pipe wrench. Care shall be taken that all pipes and fittings are properly jointed so
as to make the joints completely water tight and pipes are kept at all times free from dust,
and dirt during fixing. Burr joints shall be removed after screwing. After laying the open ends
of the pipes shall be temporarily plugged to prevent access of water, soil or any other foreign
2.1.4 Any threads exposed after jointing shall be painted or in the case of underground piping
thickly coated with approved anti-corrosive a paint to prevent corrsion.
2.2 Fixing of the tube fitting to wall ceiling and floors :
2.2.1 In case of fixing of tubes and fittings to the walls or ceilings these shall run on the surface of
the wall or ceiling (not in chase) unless otherwise specified. The fixing shall be done by
means of standard pattern, holder clamps keepings the pipes about 15 mm clear of the wall.
When it is found necessary to conceal the pipes and when specified so, chasing may be
adopted or pipe fixed in ducts or resesses etc. provided that there is sufficient space to work
on the pipe with usual tools. The pipe shall not ordinarily be buried in walls or solid floor,
where unavoidable, pipes may be buried for short distances provided that adequate
protection is given against damage and where so required joints are not buried. When
required M. S. tube sleave shall be fixed at a palace a pipe is passing through a wall or floor
for expansion and contraction and other movements. In case the pipe is embedded in walls
or floors, it should be painted with anti-corrosive bitumastic paint of approved quality. The
pipe should not come in contact with lime mortar or lime concrete as the pipe is affected by
lime. Under the floors, the pipe shall be laid in layer of sand filling.
2.2.2 All pipes and fittings shall be fixed truly vertical and horizontal unless unavoidable. The pipes
shall be fixed to walls with standard pattern clamps of required size and shape, one end of
which shall be properly plugged or cemented into walls with cement mortar 1:3(1 cement :
coarse sand) and the other tightened round the pipes to hold it securely. These clamps shall
be spaced at regular intervals in straight length at 2 M C/C interval in horizontal run and
M. interval in vertical run. For pipe of 15 mm dia. up to 25 mm. dia. the holes in the walls and
floors shall be made by drilling with chisel or jumper and not by dismantling the brick work
or concrete. However for bigger diameter pipes, the holes shall be carefully made of the
smallest required size. After fixing the pipe the holes shall be made good with cement mortar
1:3(1 cement : 3 coarse sand) and properly finished to match the adjacent surface.
2.3 Testing of joints :
2.3.1 After laying and jointing the pipes and fittings shall be inspected under working conditions
of pressure and flow. Any joint found leaking shall be redone, and all leaking pipes removed
and replaced without extra cost.
2.3.2 The pipes and fittings as they are laid shall be tested to hydraulic pressure of 6 Kg/sq. cm.
The pipe shall be slowly and carefully charged with water allowing all air to escape and
avoiding all shock and water hammer. The draw off takes and stop cock shall then be closed
and specified hydraulic pressure shall be applied gradually. The pressure gauge must be
accurate. The pipes and fittings shall be tested in sections as the work of laying proceeds
keeping the joints exposed for inspection during the testing.
3.0 Mode of measurements and payment :
3.1 The description of each item shall unless otherwise stated, be held to include where
necessary, conveyance, and delivery, handling unloading, storing fabrication, hoisting, all
labour for finishing to required shape and size; testing, fitting in position, straight, cutting
and waste, return of packing etc.
3.2 The length shall be measured on running meter basis of finished work. The length shall be
taken along the center line of the pipe and fittings. The pipes fixed to walls, ceiling, floors etc
shall be measured and paid under this item.
3.3 All the work shall be measured in decimal system as fixed in its place, subject to tolerance
given below unless otherwise stated:
(i) Dimension shall be measured to the nearest 0.01 meter
(ii) Area shall be worked out to the nearest 0.01 sq. meter.
3.4 All measurements of cutting shall unless otherwise stated be held to include the consequent
3.5 In case of fitting of unequal bore, the largest bore shall be measured for the test.
3.6 Testing of pipe lines fittings and joints include for providing all plant and appliances
necessary for obtaining access to the work to be tested and carrying out the tests.
3.7 The rate includes galvanized steel tubing with screwed socket joints, together with all fittings
(such as bends, sockets, springs, elbows, tees, crosses, short pieces, clamps and plugs
unions etc.) and fixing complete with clamping wall-hooks, wooden plugs etc and also cutting
,screwing and waste and for making forged (or hand made) bends on piping as required.
Connector shall be inserted, where required or directed. The rate also includes cutting
through walls, floors etc. and their making good and painting exposed threads with anti
corrosive paint as above and testing. Where tubes are to be fixed to wall, ceiling and flooring,
the rate shall not include painting of pipes, providing sleeves and sand filling under floor for
which separate payment shall be made.
3.8 The rate shall be for a unit of one running meter.
Item No 82:- Providing & Fixing 15 Cm Wide Chicken Mesh Jali With Nails & Then Application Of
15 Mm Plaster On R.C.C.& Masonary Joints As Per Dir.Of Engg.In Charge (N.S.)I00095
As per Item and instructed by engineer incharge
The rate shall be for a unit of one rmt basis
As per Item and instructed by engineer incharge
Item No 83:- Constructing Slab type Chamber of following size including excavation, refilling, BBCC
(1:5:10), for foundation, C.C.Channel (1:2:4) finished, 15 mm thick cement plaster inside
& outside in CM 1:3, finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated
steps 35 cm c/c at 35 cm staggered masonary in CM 1:5, RCC Slab in CC 1:1.5:3,
including Centering & reinforcement but excluding the cost of chamber seat cover
etc..completed.
(A) 0.60 X 0.45 mt. size Inside Clear,
Depth from 0.0 to 0.90meter for pipe
(Drainage SOR 2009-10,
P.H.E.Chamber, Item No.243 Page No.
0.75 X 0.75 mt. size (Inside Clear)
Depth from 0.0 to
meter for pipe dia <=20 mm
depth 0 to 1.2 mt. item including nece. Excavn. B.B.C.C. in 1:5:10 (1 cement ,5 coarse sand,
graded bk.agg.& ramming & curing etc. comp. Bricks work with bricks having crushing strength not less
then 35 kg./sq.cm.in C.M.1:5 the thickness of bk.masonary wall 0.35 mt. for 1 mt.depth and
mt.th.1mt. depth & racking out joint crushing.
The inside of wall shall be plastered 15mm th. C.M.1:3(1cement ,3 coarse sand)and finishing with
floating coating of neat cement channel shall be semicircular in bommom and of dia.equal to the sewer.
Above the horizontal dia.the sides shall be extended vertically same level as the crown of the out going
pipe and top edge shall be suitably rounded of the channel and benching shall be done c.c 1:2:4(1
cement 2coarse sand 4 graded stone agg.20 mm down graded )rising at a slop in line from adges of
channel the channel of the bottom of chamber.shall be plaster with C.M.1:2 and smooth finish.P/F C.I
The cover of slab of R.C.C.1:2:4 & 15 mm th. Reinforced with 10 mm brass at 15 cms
c/c both way.surface and edges finished fair full bearing equal to the width of wall shall be given to the
slab on all sides the frame of M.H.cover shall be embedded firmly R.C.C. slab so that the top of the frame
remains flush with the top of the R.C.C.club.After copletion of work back filling with water & chamber
cover of F.R.C. medium duty etc.comp.as dire. & details given by the Engg.incharge. The rate shall be for
a unit of one no. basis
Item No 84:- Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber
sheet cover, removing the debris from chamber and carting the same as directed.
(Based on Drainage SOR 2009-10)
The measurement shall be as per no. basis.
Item No 85:- Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged
brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing MH sheet cover, removing the debris from MH and
carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
The measurement shall be as per no. basis.
Item No 86:- Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
(Based on rate of central store)
FRC heavy duty cover size 730 mm. & 90 mm thick
circular cover 20 M.T. design load and frame size
mm clear opening size 890 x 890 x 120 mm.
FRC medium duty cover size 670 mm dia & 70 mm thick
10M.T. load design and frame size 560 mm clear
opening outer size 780 x 780 x 120 mm
Item No 87:- Extra rate over item of excavation of earth for excavation of asphalt pavement of
thickness including demolishing the asphalt carpet,metal,soiling etc.comp. with stacking the
material as directed.
upto 0.20 meter thickness (By Manual)
The measurement shall be as per smt basis
Item No 88:- Making connection to the ex.M.H.in running sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any convenient time. All damaged work shall
be well repaired as per instructions. etc..complete. (a) 150 mm to 300 mm dia
The measurement shall be as per no. basis.
Item No 89:- Providing Kachha of Pakka Dummy in the following dia pipes and removing the same
after completion of the connection work as directed
(A) 100 mm to 300 mm dia.
(B) 350 mm to 600 mm dia
Item No 90:- Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on
site by using Operator, fuel, power Supply etc. Complete as Directed. (No payment
should be allowed for non working condition of machinery and for pipe line excavation
and M.H. work. Allowed only for break down work) ( Based on Previously approved rate
As Per Item & Instructed by Engineer incharge,
The rate shall be for a unit of one hour basis
Item No 91:- Supplying Mazdoor for misc. work like Restetment Pavment, excavation, refilling,
demolishion,levelling work & other miscellanous work.I00948 (app rate in e-module)
As per Item & Instructed by Engineer- incharge.
The rate shall be for a unit of one no. basis
Item No 92:- Supplying carpenter for repairing doors with nece material like stopper, hinges, handle,
glass etc comp. as per instruction of Engineer in charge etc. I03725 As per Market Rate
As per Item & Instructed by Engineer- incharge.
The rate shall be for a unit of one no. basis
Item No 93:- Providing fiiter for D.I./P.V.C./C.I./M./A.C. Pressure water pipe linmaintenance work with
necessary manpower, tools, plants, and equipments, and any other works required for
AMC as per instruction of Engineer in charge etc. complete. I03723 As per Market Rate
As per Item & Instructed by Engineer- incharge.
The rate shall be for a unit of one no. basis
Item No 94:- Providing and fixing 1.20metre high fencing with 2 meter long M S angle posts40mm
X 6 mm and oil painting 3 coast s fixed at 2.5 M C/C with five horizontal lines and two
diagonals of galvanized steel barbed wire weighting 9.38 kg per 100 meter (Min)
strained and fixed to posts with GI staples including fixed to post in wall with
necessary C.C. Work 0.50M X 0.50 M x 0.50 < block in CC 1:5:10 etc complete(Bldg.Sor
1.0 Materials :- (1) Water shall conform to M-1 (2) Cement shall conform
to M-3 (3) Sand shall conform to M-6 (4) Bricks bats aggregate shall conform to M -14
(5) Oil Paint shall conform to M-44 (6) Barbed wire shall conform to M-78.
2.0 Workmanship :-
2.1 The pits of the size 0.5 M X 0.5 M X 0.5 shall first be excavated true to line and level to
receive the post at 2.0 M C/C The relevant specifications of item 2.00. shall be followed
for excavations work.
2.2 The pits shall be filled with a layer of 0.15 M thick with lean concrete 1:5:10 (1 cement
:5 sand :10 graded brick bat aggregates 40 mm nominal size ) The MS angle 40 mm X
MM x 6 mm Shall be the pierced over the confute in true to line and plumb.The remaining
portion of block shall be filled in with filled in with lean concert 1:5:10 and rammed
properly so as to from total 0.5 M x 0.5M x 0.5M concrete block .The concert shall be
cured for 7 days to all it to set.
2.3 The barbed wire shall be stretched and fixed in 5 horizontal rows and two diagonals.
The bottom row shall be 140mm above ground and the rest at 125 mm center to center
The concrete shall be stretched between adjacent posts from top of one post of 2nd
post The wire shall be fixed to posts by means of staple.
2.4 The MS Angle posts shall be painted with 3 coasts of oil paint of approved tinted
3.0 Mode of Measurements & Payment :-
3.1 The work shall be measured for the finished work from center to center of the posts.
3.2 The rate shall include the cost of all labour and material involved in the operations
described above.
3.3 The rate shall be for a unit one running meter.
Item No 95:- Providing and fixing stoper (M.S.) 6 inch with necessary fiting in wooden door including
removel of old fiting if any etc completed as directed. I00870 6 inch
Measurement will be done in No..
As Per Item & instructed by Engineer-incharge
Item No 96:- Providing and fixing Aldrop 10 mm size (M.S.) with necessary fiting in wooden door
including removel of old fiting if any etc completed as directed. I00872 Aldrop 10mm
Measurement will be done in No..
As Per Item & instructed by Engineer-incharge
Item No 97:- Providing and fixing handle (M.S.) 4 inch size in with necessary fitting in wooden
windows including removal of old fitting if any etc completed as directed.I00873
Measurement will be done in No..
As Per Item & instructed by Engineer-incharge
Item No 98:- Providing and fixing stopper (aluminium) 6 inch with necessary fiting in wooden door
including removel of old fitting if any etc completed as directed. I00890 6 inch
Measurement will be done in No..
As Per Item & instructed by Engineer-incharge
Item No 99:- Providing and fixing Aldrop 10 mm size (aluminium) with necessary fiting in wooden
door including removel of old fiting if any etc completed as directed I00891
Measurement will be done in No..
As Per Item & instructed by Engineer-incharge
Item No 100:- Providing and fixing handle (aluminium) 6 inch size in with necessary fitting in wooden
door including removal of old fitting if any etc completed as directed.I00889
The rate shall be for a unit of one no. basis
As Per Item & instructed by Engineer-incharge
Item No 101:- Reparing of existing Aluminium window/door/partition by making necessary
addition/alteration in same sides. Rate incl of necessary fittings required and all labour
included. If necessary rate also incl. of removing from position and refixing it at same
place after repairing it, etc comp. as directed.
The rate shall be for a unit of one no. basis
As Per Item & instructed by Engineer-incharge
Item No 102:- Rapairing Of Door & Window (Wood).It Also Including Labour Charges For Erection
And Fixing Door Shutter & Frame Etc.And Necessary Repair As Per Site
Condition.(N.S.)I00375
As per Item and instructed by engineer incharge
The rate shall be for a unit of one no. basis.
Item No 103:- Repairing of Doors/Windows shutters and Frames including refixing-aligning shutter,
providing, replacing, fixing MS hinges, Aluminium aldrops, stoppers, tadi etc. complete
excluding painting as per specifications.(app.rate)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 104:- Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-
35 Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath, parking areas, service lanes and other
areas as mentioned in the drawing / instruction of engineer in charge. Cost includes
formworks using rubber mould, Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be mechanically compacted. The work
of paving blocks shall be executed in line and level by skill mason of flooring work only.
It should be laid in such a way that the no cutting of the paver block to be necessary.
ifcutting of paver block necessary then it should be cut by machine only and carting.
The finished surface of the paver block shall have resonably good, plain finished. Paver
blocks shall be compacted and shall be relaid if necessary. Gravel or such type of
materials shall not be allowed for production. Laying on 5 cms thick sand bedding(As
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 105:- Providing & Fixing Door hinge spring include with necessary all fixtures as dircted by
engg.in charge etc.comp.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 106:- Providing & Fixing wall,ceiling and floor 10 Kg.F/Sq.Cm 160 mm working
pressure polythelene pipes of low density, complete with special flange
compression type fittings,wall clips etc.making good wall ceiling and floor as
directed by engg.in charge etc.comp.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Running meter.
Item No 107:- P/F. 10 mm thick Novapan sheet of approved quality including fixing on partition with
necessary all fixtures as directed by engg.in charge etc.comp
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 108:- Providing and fixing Stainless steel require size Aldrap in Alluminium section door
at differance floor of Multi story building. work including nece fixing materials materials
like nut bolts, labour , equipment and fixing aldrap on aluminium section
door etc complete as per instruction of engineer in charge
As per Item and instructed by engineer incharge
The rate shall be for a unit of one no.
Item No 109:- Labour charges for removing of Alum. Door / partition / Alum. Window / M.S Grill etc.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 110:- Providing, Fabricating and Erecting in position anodised (15 to 25 micron of
desired colour) door shutter (double action opening) of standard aluminum section
from 18mm (3/4”) series of Jindal or approved equivalent make of size top and vertical
style 47.62 x 44.45 x 2mm ( w approx = 1.05 kg./m), lock rail and bottom section
x 44.45 x 2mm ( w approx = 1.83 kg/m), fitted on frame of size 101.60 x 44.45 x 2mm (
w app = 1.60 kg./m) with standard accesories like handle , stopper, locking
arrangement, C.P. brass hinges, etc, and glazing of 5 mm thick float glass of Mody or
approved equivalent , fixed with rubber / PVC beading in upper and lower panel
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 111:- Providing, fabricating and erecting in position anodised (15 to 25 micron of
desired colour) aluminum fixed glass windows / partitions made up from standard
aluminium section from 18mm (3/4“) series of Jindal or approved equivalent make of
size 47.62 x 44.45 x 2mm (w app = 1.05 Kg/m), fitted on frame of size 64 x 40 x 2 mm (
w app = 1.09 Kg./m) with all standard accessories and glazing of 5mm thick flaot galss
of Mody or approved eauivalent , fixed with rubber / PVC beading etc. complete as per
details including all fittings and fixtues & locking arrangement completes.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No112:- P/F. new 12.5mm th. Gypsum board ceiling with necessary heavy weight GI framing
members as per site requirement.Work incl. Supplying of app.brand gypsum boards
and fixing it as false ceiling in line and level with all necessary hardware and labour
etc. comp.as dire. (At any floor level)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 113:-GLASS FILMS (sun control, Safety film, decorative, reflective, frosted, opaque film etc)
Imported Lumaar make as approved by engg.in charge etc.comp.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 114:- Providing and fixing 4 mm th. Acrylic sheet of approved quality including fixing with
door/window shutter & frames with necessary all fixtures as dircted by engg. in
charge etc.comp.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 115:- Repairing of Spalling in concrete with modified cement mortar & SBR including
surface preparations and applying bonding coat and rust converter of approved
brand etc. comp. including scaffolding, finishing with cement slurry As directed
As per Item and instructed by engineer incharge
The rate shall be for a unit of one square meter.
Item No 116:- Providing & Fixing Floor Spring including fixing shutter etc. complete as per inst. of
engineer in charge.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one no.
Item No 117:- P/F. thermocol ceiling with necessary aluminium T section 25 x 25 x 1.2 mm inclusive
fixing it to all wall to ceiling junction and at junction position of two sheets ,item also
includes p/f 20 mm thick plain thermocol sheets size (1 x 0.5 mt) with all necessary
fastening and hardware etc. comp.as dire. (At any floor level)
The rate shall be for a unit per smt
Item No 118:- Removing dry or oil bound distemper by a washing and scraping and sand papering
the wall surface smooth including necessary repairs to scratches complete.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 119:- Extra over item 118 for removing dry oil bounddistemper on ceilings and sloping roofs.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 120:- Distempeing (Two coats) with oil bound distemper of approved brand and manufacture
and of required shade on wall surfaces to give an even shade, over and including a
priming coat with distemper primer of approved brand and manufacture after
thoroughly brushing the surface free from mortar dropping and other foreign matter
and also including preparing the surface even and sand papered smooth.
4.0 Materials :-
1.1 Oil bound washable distemper and primer shall be of approved brand and
manufacture. The
distemper shall be of required colour and shade and the same shall conform to I.S. 428-
5.0 Workmanship :
5.1 Scaffolding : Where scaffolding is required, it shall be erected in such a way that as
far as possibleno part of scaffolding shall rest against the surface to be distempered. A
properly secured strong
and well tied suspended platform (Jools) may be used for distempering. Where ladders
are used,pieces of old gunny bags shall be tied at top and bottom to prevent scratches
to the walls andfloors. For distempering to ceiling, proper stage scaffolding shall be
erected where necessary.
5.2 Preparation of surface :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
5.2.1 The undecorated surface to be distempered shall be thoroughly brushed off from
dust, dirt, grease,mortar dropping and other foreign matter and sand papered smooth.
New plaster surface shall beallowed to dry for atleast 2 months before applications of
5.2.2 All unnecessary nails shall be removed. pitting in plaster shall be made good with
plaster of parismixed with dry distemper of colour to be used. The surface shall then be
rubbed down again with afine grade sand paper and made smooth. A coat of distemper
shall be applied over the patches.The surface shall be allowed to dry thoroughly before
the regular coat of distemper is allowed. Thesurface affected by moulds, moss, fungi
algae lichens, efflorescence etc. shall be treated inaccordance with I. S. 2395 (Part-I)
1966. Before applying distempering, any unevenness shall bemade good by applying
putty made of plaster of paris mixed with water on entire surface includingfilling up the
undulation and then sand papering the same after it is dry.
5.3 Priming coat :
5.3.1 A priming coat or distemper prime of approved manufacture and shade shall be
applied over thepapered surface in case of new work on undecorated surface. If the
distemper priming is done afterthe wall surface dries completely, the distemper primer
shall be applied.
5.3.2 Application of Primer shall be done as under :
The primer shall be applied with a brush on the clean dry and smooth surface.
Horizontal strokesshall be given first and vertical strokes shall be applied immediately
afterwards. This entireoperation will constitute one coat. The surface shall be finished
as uniformly as possible leaving nobrush marks. It shall be allowed to dry for atleast
hours before oil bound distemper or Paint isapplied.
5.3.3 Oil bound distemper is not recommended to be applied within six months of the
completion of wallplaster.
5.4 Preparation of oil bound distemper :
2.4.1 The distemper shall be diluted with water or any other prescribed thinner in a
mannerrecommended by the manner recommended by the manufacture only. Sufficient
quantity ofdistemper required for a day's work shall be prepared.
2.5 Application of Distemper coat :
2.6.1 For undecorated surfaces, after the primer coat is dried for atleast 48 hours, the
surface shall belightly sand papered to make it smooth for receiving the distemper,
taking care not to rub out thepriming coat. All loose particles shall be dusted off after
rubbing. Minimum two coats of distempershall be applied with brushes in horizontal
strokes followed immediately by vertical strokes whichtogether shall constitute one
coat. The subsequent coats shall be applied after a time interval of
atleast 24 hours between consecutive coats to permit proper drying of the preceding
finished surface shall be even and uniform without patches, brush marks, distemper
2.6.2 sufficient quantity of distemper shall be mixed to finish one room at a time. The
application of a coat
in each room shall be finished in one operation and no work shall be started in any
cannot be completed on the same day.
2.6.3 15 cm. double bristled distemper brush shall be used. After day's work brushes
shall be thoroughly
washed in hot water soap solution and hung down to dry. Old brushes which are dirty
with distemper shall not be used on the work.
2.7 Protective measurements : The surfaces of doors, windows, floors, articles of
furniture etc. and
such other parts of the buildings as are not to be distempered shall be protected from
splashed upon. Such surfaces shall be cleaned of distemper splashes if any.
6.0 Mode of measurements & payment :
6.1 Priming coat of distemper primer, scraping of surface spoiled by stunk soots
removal of oil and
grease spots, treatment for infection of effloresces mould moss, fungi, algae and litchen
repairs to plaster shall be included in this item for which nothing extra shall be paid.
6.2 All the work shall be measured net in the decimal system as in place subject tot he
following limits
unless otherwise stated hereinafter :
(c) Dimensions shall be measured to the nearest 0.01 m.
(d) Area in individual items shall be worked out to the nearest 0.01 sq. m. all work shall
sq. metre. No deductions shall be made for ends of joints, beams, posts etc., and
exceeding 0.5 sq.m. each and no addition shall be made for reveals, jambs, soffits, sills
these openings nor for finish around ends of joints, beams, posts etc.
6.3 Deductions of opening exceeding 0.5 sq.m. but not exceeding 3 m. in each shall be
follows and net addition shall be made for reveals, jambs, soffits etc. of these openings
(d) When both the faces of walls are provided with same finish : deductions shall be
made or one face
(e) When each face of wall is provided with different finish, deduction shall be made for
frame for doors, windows etc. on which width of reveal is less than that of the other
AHMEDABAD MUNICIPAL CORPORATION VOL.-I & II
deduction shall be made on the other side. Where the width of reveals on the both the
are equal, deduction of 50% of area of opening of each face shall be made from area of
(f) When only one face of wall is treated and the other face is not treated, full deduction
if the width of the reveal on treated side is less than that on untreated sides but if the
reveal is equal or more than that on untreated side neither deductions not addition to
reveals, jambs, soffits, sills etc.
6.4 In case opening of area exceeding 3 sq. m. each, deduction shall be made for
openings but jambs,
sills and soffits shall be measured.
6.5 No deductions shall be made for attachments such as casings, conduits, pipes,
electric wiring and
6.6 Item includes removing nails, making good holes, cracks, patches with material
composition of distemper.
6.7 The rate includes cost of all materials, labour, scaffolding, protective measures etc.
involved in all
the operations described above. This shall also include conveyance, delivery, handling,
storing work etc.
6.8 The rate shall be for a unit of one sq. metre.
Item No 121:-Extra over Item 120 for every subsequent coat of approved brand and manufacture..
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 122:- Extra over Item 120 for distempering with oil bound washable distemper on celling
and slopingroofs.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 123:- Wall painting (two coats) with plastic emulsion paint of approved brand and
manufacture on undecorated wall surface to give an even shade including throughly
brushing the surface free from mortar droppings and other foreign matter and sand
papered smooth.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 124:- Extra over item 123 for every subsequent coat of wall painting with plastic emulsion
pain ofapproved brand.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 125:- Extra over item 123 for painting with plastic emulsion paint of approved brand on
ceilings and sloping roofs.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 126:- Applying two coats of Birla (white cement based) or Asian (acrylic lapy- putty) or
equivalent & two coats of primer of approved brand and manufacture on new wall
surface to give an even shade including thoroughly brushing the surface free from
mortar dropping and other foreign matter and sand papered smooth.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 127:-Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to
give an required shape even shade after thoroughly brushing the surface to remove all
dirt, and remains of loose powdered materials.etc complete
The rate shall be for a unit of one Smt..
As per Item and instructed by engineer incharge
Item No 128:-Providing and fixing Polycarbonate roof Lexan sabic 10 mm th.sheets of approved
make, on structural roofing / sky ligh structures in shapes as per Architect’s drawing.
The rate shall include cost of scaffolding, screws, nuts, bolts and all necessary fixtures
and fastening etc complete (Rate excluded structural steel work)
The rate shall be for a unit of one Smt..
As per Item and instructed by engineer incharge
Item No 129:- Finishing Wall With Apex Ultima Acrylic Paint Of " Asian Paint " Or Equivalent On
Wall Surfaces (Two Coats) To Give Required Even Shade After Application Of
Exterior Primer Of Approved Brand & Manufactures After Thoroughly Brushing
The Surface To Remove All Dirt & Remains Of Loose Powered Materials.(N.S.) -
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 130:- Painting two coats (excl. priming coat) on new steel & other Metal surfacer with
enamel paint, brushing, interior to give an even shade incl. cleaning the surface of
all dirt, dust and other foreign matter..( Building SOR - 2015-16 Ch-19, Item
No.19.7Page no.211)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 131:- Painting one coats (excl. priming coat) on peviously painted steel & other Metal
surfacer with enamel paint, brushing, interior to give an even shade incl. cleaning
the surface of all dirt, dust and other foreign matter..( Building SOR - 2015-16 Ch-19,
Item No.19.11 Page no.211)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt..
Item No 132:-Painting Two coats (excluding priming coat) on previously painted steel and other
metal surface with enamel paint, brushing to give an even shade including cleaning the
surface of all dirt, dust and other foreign matter.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one Smt
Item No 133:- Painting one coats (excluding priming coat) on previously painted wood and wood
based surface with enamel paint, to give an even shade including cleaning the of all
dirt, dust and other foreign matter.
The rate shall be for a unit of one Smt
Item No 134:- Labour charges for cleaning U.G. & O. H. tank by modern science technology with
six stage process as below (1) Dewatering existing water by submersible pump. (2)
Hydrojetting by 150 kg. per sq.cm pressure. (3) Vaccum cleaning to suck the sludge &
Turbidity on bottom surface (4) Heat air system by 80 degree c. tmp. for drying corners
& all sides of tank. (5) Anti bacterial chemical spraying to all surface of tank and then
(6) Ultra violet radiation pan Treatment to tank in this six stages on site classic supply
etc. shall be provided by Muni. Corporation. without charging any extra cost. The
complete tank ckeaning by mono cleaning systems as directed, rate of above process
are as below capacity of tank. (Approved Rate)
The rate shall be for a unit per no
Item No 135:- Providing and fixing of mirrors of 5 mm thick on walls of wash basin counters , toilet area etc,
including all hardware and fixing details and position as per consultant design and drwaings of the
consultant, as directed and to the satisfaction of the Consultant / Engineer in charge...
The rate shall be for a unit of one Smt
Item No 136:- Providing and applying texture paint at approved quality, colour scheme, including
preparation of surface, primer 2 coats+2 coats of putty and texture paint, as per
manufacture's specification, scaffolding, roller finish etc complete as per instruction
of engineer in charge
The rate shall be for a unit of one Smt
Item No 137:- Supplying and installation of 10mm thick recycled rubber flooring having anti-skid
and sound absorbing properties, square shaped, with different color optns for create
flooring pattern, should be installed with proper adhesive as per manufactures's
guidelines, joints of surface to be done properly to prevent dirt & watepenetration inside
the surface. etc complete as per instruction of engineer in charge
The rate shall be for a unit of one Smt
Item No 138:- Providing and applying vinyl paint at approved quality, including fixing laminate on
surface, as per manufacture's specification, finish etc complete as per instruction of
engineer in charge
The rate shall be for a unit of one Smt
Item No 139:- Providing and Fixing Metal Jali, making of Wooden Patti Frame of size 25 mm x
mm for Ventilation etc. complete as directed.
The rate shall be for a unit of one Smt
Item No 140:- Providing and fixing 35mm thick flush shutter for doors, windows & clearstory
windows incl. Indian teak wood frames 12 cm x 7 cm including anodized alluminium
fixture and fastenings incl. primer coat of approved quality and two coats of oil painting
etc. complete.(Fully pannele or partly panneled and partly galzed door)
Flush shutter with both side laminate
The rate shall be for a unit of one Smt
Item No 141:- Arrangement of zula with two or nece. skilled labour for repairing & maintenance work
out side building work etc.complete as per insructer incharge(At any floor level)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one number basis..
Item No 142:- Providing Scaffolding for Demolition Plaster Work & painting workby 'H' Frame Stand
of by any means like bamboo, balli etc. including carting material work site and
removing after completion of work. Rate include any type rent etc. complete for any
height as directed by engg. in charge.
The rate shall be for a unit of one Smt
Item No 143:- Supplying , erecting, testing, and commissioning of Submercible pump set of 1.5 H.P.
of Standard make against the total monometric head of 15 mt. as per specification incl.
motor starter single phase preventer / liquid level controller G.I. fitting check valves etc.
The rate shall be for a unit of per no.
Item No 144:- Providing, Manufacturing, Fixing Chain Link Jali 8".0" X 4".0" as per detailed Sketch
& instruction of Engineer in Charge same as Lal Darwaja Garden Pattern Consisting of
3" dia MS pipe A class 5".4" height fixed at 8".9" in C.C. (1:2:4) block of 9" X 9" X 9" size
chain link jali 2" X 2" X 10 gauge fixed in 35 X 35 X 5 mm MS angle frame of 8".0" X 4".0"
size with MS flat of size 25X3 mm welded with jali etc. Comp. The Jali is to be Welded
to MS angle with MS Flat as per instruction given. The MS Pipe Jali, MS angle frame are
to be painted one coat of primer & two coats of paint as directed, in line and level.The
two hold fast has been welded at equal distance at the bottom angle of jali for support
fixed in C.C. as directed by Engg. in Charge.
The rate shall be for a unit of per RMT.
Item No 145:- Providing of Fixing carpet in Auditorium of the administration building of the reputed
brand like " splendor or new royal series " of Unitex or equivalent in approved
combination on all the levels steps( tread
and risers and other areas) and having specification as Pile Fiber - 46% PP BCF &
% PP Cable Yarn
Construction -Bulk continuous filament ,yarn type tri color solution dyed, Machine
gauge- 2.54 mm(12/10")
39.4 rows/100mm, stitch rate-40/10 cms, construction - Scroll (high/low) Density
factor - 157,600 tufts/m2,
Tufted pile weight-850gms/m2 ,Tufted pile height - 7mm (+ 5%) ,Primary Backing
,Secondary Backing -55 gms/m2,Moth proofing Naturally resistant, Bond Strength -
30 Newton, Tuft
Withdrawal strength -20 Newton, Flammability- Passes the test, Static Generation -
Under 3 KV , Light Fastness- 5+ ,Warranties - 10 year limited wear, the complete work
is to be done excellent workmanship as per architect or engg. in charge. (approved
As per Item and instructed by engineer incharge
Item No 146:- Proving & Fixing Auditorium chair auto-tip upmechanism. Understructure fixed to
ground by 2 nos.anchor fasteners 10 mm x 100 mm in floor fixing. 50mm x 25 mm
SWG ms pipe frame base of 50 mm x 10 mm ms flat , 30 Density foam with side support
with cloth covered. Using Seat handle is PPCP material. Seat assembly consists
structure size 20” x 20”using square pipe frame 1.6 SWG with Horizontal & Vertical
Spring the seat frame size 17” x 20” with5” PU seat thickness. Back assembly consists
20” x20” x 1.6 SWG M.S. Square Pipe Frame with 12” x 3” M.S. Flat Strip. Back should
be covered by PVC. The good quality cloths using in omplete seat should be
As per Item and instructed by engineer incharge
Item No 147:- Provinding and Laying 15 mm thick enginering Stage woodan Flooring shapherd /
unitex make laminated wooden flooring on top of foam layer over a base of wooden
plank flooring including all accessories, material & labor complete as directed by
Architect / Engineer – in – charge.
As per Item and instructed by engineer incharge
Item No 148:- Designing, fabricating, testing, installing and fixing inposition Curtain Wall with
Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear
portions of the building, for all heights and all levels etc. including(a) Structural analysis &
design and preparation of shop drawings for pressure equalisation or rain screen principle
as required, proper drainage of water to make (b) Providing, fabricating and supplying and
fixing panels of aluminium composite panel cladding in pan shape in metalic colour of
approved shades made out of 4mm thick aluminium composite panel material (c) The
fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations
and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor
bolts of approved make in SS 316, Nylon separators to prevent bi- metalliccontacts all
complete required to perform as per specification and drawing The item includes cost of all
material & labour component, the cost of all mock upsat site, cost of all samples of the
As per Item and instructed by engineer incharge
Item No 149:- Supply & installation of Anutone /Ecotone/Himalyan Salon Slats Surco Lite or
equivalent make made of pinewood E1 grade fiber board, melamine/veneer
laminated finish, groove perforated slats L16-2 - (2mm grooves @16mm pitch with
7.3% open area) backlined with Soundtexvblack acoustical fleece of 0.27mm thick,
surface density 63g/m2,tongue-groove edge for a seamless look, 1-test FR grade,
size 128 x2440x16mm, L16-2,volume density of base board 700Kg/m3, weight
9Kg/m2 installed by using Anutone Strut framework system.
"The framework system shall include Strut CC25 thickness 0.55mm, length
3600mm, knurled web 50mm, depth 25mm and equal flanges 15mm is fastened to the
wall positioned vertically at every 600mm centres.
Anutone Strut CC18,aluminium core cross channel, thickness 0.5mm, length
2400mm, web 15mm & 27mm, depth 18mm and flanges of 7mm with suitable
edge & center brackets is then fixed perpendicular to the Strut CC25 with the help of
fasteners at every 400mm centers
Anutone/Ecotone/Himalyan Slats Surco Lite of size 128x 2440x16mm,L16-2, is
then fixed perpendicular to Strut CC18 with suitable edge & centre brackets.
Contractor to provide expansion joints of 3mm at every 4.88m length wise and
4.992m width wise.
Note:Wooden packings of appropriate thickness to be used at rear of strut to bring
finish inline with Stretch Hush finish.if applicable."
"The system is backlined with Anutone/Ecotone/Himalyan SynthPF 10x25 adhered on
spots of Anutone/Ecotone/Himalyan stick S7 adhesive."
Technical Parameters
"• Acoustics – NRC 0.8( For L32 C40 Mounting)
* Thermal conductivity (W/mk)– na
* Climate (°C, RH) – 50,
* Light reflectance (%) – 75 (Maple Arce)
* Green (VOC, RC %) – E1, 25"
CONTRACTOR'S SIGNATURE & STAMP ADD . CITY ENGINEER
Mobile No.:- (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
South Zone Tender Notice No.18 2025-26 Tender No.620.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .