| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC NIRAPPEL HOUSE MUDAVOOR P O MUVATTUPUZHA | ERNAKULAM | KERALA | 680667 | ₹5.1 L | L1 | Accepted-AOC Accepted Vide Resolution No. 4 dtd.13/03/2026 of Muvattupuzha municipality |
| 2 | L2₹5.3 LRejected-AOC NIRUPPEL CID MUDAVOOR PO | WAYANAD | KERALA | 670644 | ₹5.3 L | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | Siraj N.E. L2 | Shameer N.K L1 |
|---|---|---|---|---|---|
| 1.00Maintenance of Mangattupalli road in Ward 12 of Muvattupuzha Municipality | |||||
| 1.00 | OD479569/2025-2026:Engaging mancoolie | 2 | each | 1,183.72 ₹2,367.44 | 1,127.36 ₹2,254.72 |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 135.35 | sqm | 328.55 ₹44,469.24 | 312.91 ₹42,352.37 |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 72 | sqm | 426.41 ₹30,701.52 | 406.11 ₹29,239.92 |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,423.53 | sqm | 16.57 ₹23,587.81 | 15.79 ₹22,477.46 |
| 1.00 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 1,423.53 | sqm | 303.67 ₹4.3 L | 289.21 ₹4.1 L |
Tender Value
₹5.1 L
EMD Value
₹12,701
Closing Date
10 Mar 2026, 10:00 amClosed
ASSISTANT ENGINEER
Office of the Assistant Executive Engineer LIDEW Muvattupuzha Municipality
Pro.No.368/25-26 Maintenance of Mangattupalli road in Ward 12 of Muvattupuzha Municipality
2026_LSGD_842274_11
10/2025-26/AE/LSGD/MVPA
Open Tender
Civil Works - Roads
Muvattupuzha Municipality
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,120
₹12,701
19 May 2026
3 Mar 2026
11 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
Maintenance of Mangattupalli road in Ward 12 of Muvattupuzha Municipality
OD479569/2025-2026:Engaging mancoolie
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1422018.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.08 MB
viewnit.pdf
Tender Documents • 0.07 MB
viewsbd.pdf
Other Document • 1.88 MB
BOQ_1422018.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid