Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L Quoted ₹2.8 L | L1 | Accepted-AOC L1 |
Tender Value
₹2.5 L
EMD Value
₹6,350
Closing Date
23 Feb 2026, 11:00 amClosed
AEE
O/o AEE,PWD Buildings sub division Aluva
Provisions added in this estimate are steel work for fencing post,barbed wire fencing,scaffoldingetc.
2026_PWD_828906_2
PWD/BLDG/TR/14825/2025_5_1_1/1
Open Tender
Civil Works - Others
Aluva
Please refer Tender documents.
8 documents required · 8 mandatory
₹560
₹6,350
Yes
30 Jun 2026
13 Feb 2026
25 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1App I | |||||
| 1.001 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kg | 140.41 | - |
| 1.002 | 16.18.1:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire | - | metre | 24.61 | - |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 9,235.97 | - |
| 1.004 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | - | sqm | 357.38 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1407632.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1407632.xls
BOQ • 0.31 MB
SBDNIT.pdf
Tender Documents • 1.67 MB
prl.pdf
Tender Documents • 0.94 MB
affidavit.pdf
Tender Documents • 0.19 MB
FOT.pdf
Tender Documents • 0.35 MB
inst.pdf
Tender Documents • 0.48 MB
Integrity.pdf
Other Document • 0.34 MB
NIT.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid