Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹10,486
Closing Date
22 Jun 2026, 3:00 pm
The EE, WRD-IV, BLN
O/o The EE, WRD-IV, BLN
Reconstruction of Pump Motor Base and removal of clay or silt deposited over hose pipe and foot valve etc. during the year 2026-2027.
2026_CEWR_73715_1
07/EE/WRD-IV/BLN/DNIeT/2026-27
Open Tender
Civil Works - Water Works
180 days
O/o The EE, WRD-IV, BLN
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹10,486
Yes
12 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.-All kinds of soil | 216 | cum | 179.9 | ₹38,858.4 | BI01010001010000000000000515BI0100001127 |
| 2 | Desilting of earth, silt, garbage, slush and other solid deposits etc. from the existing canal mannually to bring it to the required section for smooth flow in the canal including disposal of excavated material outside of the canal with a lead of 50 m. and all lifts including execution of work in or under water, liquid mud and under foul conditions including the cost of taking care of canal section. Dewatering of stagnent or flowing or seepage water/sludge/liquid marsy entering into the canal from any sources as required for satisfactory execution of work including taking out the excavated material outside the canal as per directions of Engineer-in-charge. Disposal of excavated materials, such as earth, silt, garbage, slush and other solid deposits etc. to be deposited & properly levelled over the canal embankment | 144 | cum | 325.9 | ₹46,929.6 | BI01010001010000000000000515BI0100001128 |
| 3 | Dismentaling of old pump/motor from base & stacking of materials & return the same to Sub-Divisional store as per direction of the Engineer-in-Charge. | 12 | nos | 2,280.49 | ₹27,365.88 | BI01010001010000000000000515BI0100001129 |
| 4 | Dismentaling of G.I pipe including necessary earth cutting etc.& return the same to Sub-Divisional store as per direction of the Engineer-in-Charge. 125/150 mm dia a)15 mm to 40 mm nominal bore | 36 | mtr | 75.6 | ₹2,721.6 | BI01010001010000000000000515BI0100001130 |
| 4.01 | b)Above 40 mm nominal bore | 36 | mtr | 91.7 | ₹3,301.2 | BI01010001010000000000000515BI0100001131 |
| 5 | Dismentaling G.I pipes(external work) including excavation and refilling trenches after out the pipes, Manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer- in - charge | 36 | mtr | 200.54 | ₹7,219.44 | BI01010001010000000000000515BI0100001132 |
| 6 | Dismentling of G.I bend including necessary earth cutting etc. and return the same to sub divisional store as per direction of the Engineer -in charge. 125/150 mm dia | 36 | mtr | 391.77 | ₹14,103.72 | BI01010001010000000000000515BI0100001133 |
| 7 | Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer-in-charge:-14.2.1 nominal concrete 1:3:6 or richer mix(i/c equivalent design mix) | 26 | cum | 1,436 | ₹37,336 | BI01010001010000000000000515BI0100001134 |
| 8 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. :- | 4 | cum | 1,177.3 | ₹4,709.2 | BI01010001010000000000000515BI0100001135 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work upto plinth level
(i) 1 : 2: 4 ( 1 cement : 2 fine sand : 4 graded well burnt brick aggregate of 20mm nominal size ) | 26 | cum | 10,742.6 | ₹2,79,307.6 | BI01010001010000000000000515BI0100001136 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.98 MB
DNIeT-07.pdf
Tender Documents • 2.40 MB
BOQ_75024.xls
BOQ • 0.34 MB
Statement-I-III.pdf
Additional Documents • 0.07 MB
Appendix-II-V.pdf
Additional Documents • 0.47 MB
Download all tender documents and submit your bid