Loading…
Loading…
Tender Value
Refer Docs
Closing Date
8 Jun 2026, 2:00 pmClosed
DEVESH GANESH CHAUDHARI
REFINERY, Bharat Petroleum Corporation Limited
.
25416
1000456027
Single Tender
Lump-Sum
REFINERY
8 Jun 2026
25 May 2026
8 Jun 2026
25 May 2026
8 Jun 2026
25 May 2026
TENDER DOCUMENT
PROCUREMENT OF GOODS / SERVICES TO
CENTRAL PROCUREMENT ORGANISATION, KOCHI REFINERY,
BHARAT PETROLEUM CORPORATION LIMITED
AMBALAMUGAL, KERALA
Tender Document Index
S. No Document Title
1 Notice Inviting Tender
2 Request For Quotation (RFQ)
Scope of work, Drawings & Additional Conditions of Tender, if
4 Item wise Details of Quote
5 Commercial Format (CF)
6 Deviation & Exception Form
7 Instructions To Bidders C1 Tenders
8 Policy for Holiday Listing of Vendors in BPCL
9 Policy of Restrictions for Countries which Share Land Border
10 General Conditions of Contract
11 Integrity Pact
12 Advisory on Environmental Criteria
13 Advisory on Bank Guarantee
14 Government Directives
Safety and Security Regulations with Electrical Safety
16 Instructions to Contractors
Five Tier Contractor Safety Management with Safety
17 Competency Form
18 Additional Conditions Under GST
19 Tender Acknowledgement
20 Compliance to Bid Requirement
To, REQUEST FOR QUOTATION
M/s. BPCL ESTIMATE Collective RFQ Number/ Purchase Group
MUMBAI . India - 400038. 1000456027 / J12-MECHANICAL
Ph:,Fax:. Contact person/Telephone
Vendor Code:300648 SIJU M C/0484-2821680
Email:[email protected]
RFQ No/Date: 6001933593 / 20.05.2026 Quotation Due Date/Time:08.06.2026/14:00:00
Material/Services required at:
M/s. Bharat Petroleum Corpn.Ltd
KOCHI ERNAKULAM-
THIS TENDER IS FOR FINALIZATION OF TWO YEAR RATE CONTRACT FOR GT MAINTENANCE
BY M/S.BGGTS AT BPCL KOCHI REFINERY.
EVALUATION METHODOLOGY: OFFERS WOULD BE EVALUATED AND CONTRACT WILL BE PLACED
ON OEM BASIS. OFFERS WITH NIL VALUE OR ZERO VALUE FOR ANY OF THE ITEMS MAY
ALSO LIABLE TO BE REJECTED.
TYPE OF JOB: SERVICE.
NATURE OF SERVICE: SERVICE BY RATE CONTRACT.
THIS IS A NON DIVISIBLE SERVICE CONTRACT JOB.
PRICING: FIXED PRICING IS APPLICABLE AS PER ATTACHED TENDER DOCUMENT.
EARNEST MONEY DEPOSIT (EMD): NOT APPLICABLE.
PERIOD OF CONTRACT: TWO YEARS FROM THE DATE OF CONTRACT.
TIME OF COMPLETION : 6 MONTHS FROM RECEIPT AT BGGTS REFURBISHMENT FACILITY.
SINCE TIME IS THE ESSENCE OF THIS CONTRACT, EXECUTION OF WORK/SERVICE WITHIN
THE ABOVE PERIOD SHALL BE A TENDER CONDITION FOR SMOOTH RUNNING OF THE
REFINERY. OFFERS WHICH ARE NOT MEETING ABOVE TIME PERIOD WILL NOT BE
CONSIDERED FOR EVALUATION.
PAYMENT TERM: PAYMENT SHALL BE MADE ON THE BASIS OF WORK ACTUALLY EXECUTED AND
APPROVED BY THE ENGINEER-IN-CHARGE (EIC) WITH ALL SUPPORTING DOCUMENT.
75% PAYMENT OF THE RUNNING ACCOUNT BILL (RA BILL) SHALL BE RELEASED WITHIN
CALENDAR DAYS OF RECEIPT OF RA BILL DULY CERTIFIED BY EIC AND THE BALANCE
PAYMENT SHALL BE RELEASED WITHIN 30 DAYS OF RECEIPT OF RA BILL BY EIC AFTER
DETAILED SCRUTINY. THIS PAYMENT WILL BE MADE AFTER MAKING NECESSARY DEDUCTIONS
AS STIPULATED ELSEWHERE IN THE CONTRACT DOCUMENT FOR MATERIALS, SECURITY
DEPOSIT OR ANY MONEYS DUE TO THE OWNER ETC. THE FINAL BILL SHALL BE SUBMITTED
Page 1 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
BY THE CONTRACTOR WITHIN ONE MONTH OF THE DATE OF PHYSICAL COMPLETION OF THE
WORK, AND SETTLED IMMEDIATELY BUT NOT LATER THAN 60 DAYS. THE DETAILS OF
PAYMENT IS MENTIONED IN CLAUSE NO.75 TO 80 OF THE ATTACHED GENERAL CONDITIONS
THE OFFERS, INCLUDING PRICE, RECEIVED AGAINST THIS TENDER SHALL BE VALID FOR A
PERIOD OF 180 DAYS FROM THE BID OPENING DATE. IN CASE OF TWO PART BID SYSTEM,
UN PRICED BID OPENING DATE IS CONSIDERED AS THE BID OPENING DATE.
THE BIDDER SHOULD UPLOAD THE ATTACHED DOCUMENT "ITEM WISE PRICE DETAILS OF
QUOTE" ALONG WITH PRICE BID ONLY.
RATE CONTRACT CLAUSE: THIS TENDER IS INVITED FOR FINALIZING A RATE CONTRACT.
THE QUANTITY MENTIONED IN TENDER DOCUMENT IS TENTATIVE AND ESTIMATED
CONSIDERING THE DURATION OF THE CONTRACT AND MAY VARY TO AN EXTENT. HENCE THE
SAME SHALL NOT BE TAKEN AS OUR FIRM COMMITMENT. PO QUANTITY / ACTUAL WORK MAY
BE CONSIDERABLY LESS THAN THE ESTIMATED QUANTITY. BIDDER WILL NOT HAVE ANY
CLAIM WHATSOEVER IF THE QUANTITY IS CONSIDERABLY LESS. THE RATE QUOTED SHALL
BE FIRM FOR THE ENTIRE CONTRACT PERIOD. A RATE CONTRACT (VALUE CONTRACT) WILL
BE ISSUED TO THE SUCCESSFUL BIDDER VALID FOR THE CONTRACT PERIOD AND SEPARATE
RELEASE ORDERS BASED ON PRICING WILL BE ISSUED FOR ACTUAL QUANTUM OF WORK
DEPENDS UPON OUR REQUIREMENT. THE TIME OF COMPLETION FOR INDIVIDUAL JOBS
MENTIONED IN THE RELEASE ORDERS WILL BE THE BASE DATE FOR LIQUIDATED DAMAGES
DEVIATION TO TENDER CONDITIONS: DEVIATION TO ANY OF THE TENDER CONDITIONS IS
NOT AT ALL ACCEPTABLE. BIDDERS ARE REQUESTED TO QUOTE STRICTLY AS PER OUR
TENDER CONDITIONS. IN CASE OF OFFER WITH TECHNICAL/COMMERCIAL DEVIATIONS &
EXCEPTIONS, PLEASE HIGHLIGHT IT WITH SPECIFIC DETAILS IN THE DEVIATION &
EXCEPTION FORM. PLEASE NOTE THAT IF NO DEVIATION & EXCEPTION IS GIVEN, IT
SHALL BE PRESUMED THAT YOUR OFFER HAS NO DEVIATION FROM OUR TENDER CONDITIONS.
NO AMENDMENT WILL BE ENTERTAINED AFTER PLACEMENT OF ORDER.
THE BIDDER SHOULD UPLOAD ALL THE SUPPORTING DOCUMENT FOR THE TECHNO COMMERCIAL
EVALUATION OF THE OFFER. THE BIDDER ALSO NEEDS TO UPLOAD THE SIGNED COPY OF
THIS RFQ AND SCOPE OF WORK ALONG WITH TENDER DOCUMENTS.
PRE BID QUERIES: THE PURPOSE OF PRE BID QUERIES IS TO CLARIFY ANY DOUBTS OF
THE BIDDERS ON THE INTERPRETATION OF THE PROVISIONS OF TENDER. PRE BID
TECHNICAL QUERIES, IF ANY, CAN BE SUBMITTED BY E MAIL TO
[email protected] (TELEPHONE NO. 0484 282 4515) AND COMMERCIAL
QUERIES CAN BE SUBMITTED TO [email protected] (TELEPHONE NO. 0484
E TENDER - THIS IS AN E TENDER THROUGH GEM PORTAL (HTTPS://GEM.GOV.IN).
DIGITALLY SIGNED QUOTATIONS ARE INVITED, IN TWO PART BID SYSTEM (UNPRICED BID
AND PRICED BID), FROM OEM / PROPRIETARY VENDORS FOR THE SUBJECT SERVICE AS PER
THE ENCLOSED TENDER DOCUMENTS.
SUBMISSION OF BIDS ONLINE: BIDDERS ARE REQUESTED TO SUBMIT/ UPLOAD THEIR
Page 2 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
UNPRICED AND PRICED BID WITH ALL REQUIRED DOCUMENTS THROUGH ABOVE WEBSITE. THE
DETAILS ARE MENTIONED IN THE ATTACHED TENDER DOCUMENTS. THE UNPRICED BIDS WILL
BE OPENED ON THE TENDER DUE DATE AFTER THE TENDER DUE TIME. THE PRICE BIDS OF
QUALIFIED BIDDERS WILL BE OPENED ON A LATER DATE.
LIQUIDATED DAMAGES FOR DELAY: IN CASE THE CONTRACTOR FAILS TO COMPLETE THE
WHOLE WORK WITHIN THE STIPULATED PERIOD, HE SHALL BE LIABLE TO PAY LIQUIDATED
DAMAGES OF 0.5% OF THE BASIC VALUE OF CONTRACT PER WEEK AND OR PART THEREOF OF
THE DELAY SUBJECT TO A MAXIMUM OF 5% OF THE VALUE OF THE CONTRACT. THE DETAILS
OF PRICE REDUCTION CLAUSE IS MENTIONED IN CLAUSE NO.22 & 86 OF ATTACHED GCC.
PERFORMANCE SECURITY DEPOSIT / RETENTION MONEY: TO ENSURE PERFORMANCE OF THE
CONTRACT AND DUE DISCHARGE OF THE CONTRACTUAL OBLIGATIONS, THE SUCCESSFUL
CONTRACTOR WILL HAVE TO PROVIDE SECURITY DEPOSIT OF 5% OF THE BASIC VALUE OF
CONTRACT. THIS SECURITY DEPOSIT MAY BE FURNISHED IN THE FORM OF BANK GUARANTEE
/ INSURANCE SURETY BOND IN THE PRESCRIBED FORMAT. IN CASE THE SUCCESSFUL
CONTRACTOR IS NOT FURNISHING THE PERFORMANCE SECURITY DEPOSIT AS REFERRED
ABOVE ON AWARD OF THE JOB, THE SAME SHALL BE DEDUCTED FROM EACH RUNNING
ACCOUNT BILLS AT THE RATE OF 5% OF BILL VALUE TILL OVERALL SECURITY DEPOSIT OF
5% AS MENTIONED ABOVE IS COLLECTED. THE DETAILS OF PERFORMANCE SECURITY
DEPOSIT / RETENTION MONEY IS MENTIONED IN CLAUSE NO.18 OF ATTACHED GENERAL
CONDITIONS OF CONTRACT. IN THE CASE OF SECURITY DEPOSIT SUBMITTED IN THE FORM
OF BANK GUARANTEE / INSURANCE SURETY BOND, THE BANK GUARANTEE / INSURANCE
SURETY BOND SHALL BE VALID AND REMAIN IN FORCE TILL THE CONTRACTUAL COMPLETION
PERIOD (EXPIRY OF THE DEFECT LIABILITY PERIOD- REFER CLAUSE-74 OF GCC, IF
APPLICABLE) AND WITH A CLAIM PERIOD OF SIX MONTHS THEREAFTER.
DEFECT LIABILITY PERIOD: THE CONTRACTOR SHALL GUARANTEE THE WORK FOR A PERIOD
OF 12 (TWELVE) MONTHS FROM THE DATE OF COMPLETION OF WORK.
GENERAL CONDITIONS OF CONTRACT (GCC): - PLEASE FIND THE GCC ATTACHED WITH
TENDER DOCUMENTS, SIGN ALL THE PAGES OF GCC AS A TOKEN OF YOUR ACCEPTANCE OF
ALL THE TERMS & CONDITIONS AS MENTIONED AND UPLOAD WITH DULY FILLED GCC
ACKNOWLEDGEMENT FORM.
INTEGRITY PACT: - BPCL KOCHI REFINERY HAS IMPLEMENTED AN INTEGRITY PACT
PROGRAM (IPP) FOR PROCUREMENT OF SERVICES AND ACCORDINGLY THE FOLLOWING TERMS
SHALL BE ENFORCED. THE FORMAT OF INTEGRITY PACT PROGRAM IS ATTACHED WITH
TENDER DOCUMENTS.
PROFORMA OF INTEGRITY PACT (IP) ATTACHED SHALL BE UPLOADED BY ALL THE BIDDER/S
ALONG WITH THE UN- PRICED BID DOCUMENTS DULY SIGNED (OR DIGITALLY SIGNED IN
CASE OF E-TENDER) BY THE SAME SIGNATORY WHO IS AUTHORIZED TO SIGN THE BID
DOCUMENTS. ALL THE PAGES OF THE INTEGRITY PACT SHALL BE DULY SIGNED AND
STAMPED INCLUDING NAME, ADDRESS AND SIGNATURE OF ONE WITNESS IN THE LAST PAGE.
BIDDER'S FAILURE TO UPLOAD THE IP DULY SIGNED (DIGITALLY) ALONG WITH BID
DOCUMENTS SHALL RESULT IN THE BID NOT BEING CONSIDERED FOR FURTHER EVALUATION.
IF THE BIDDER HAS BEEN DISQUALIFIED FROM THE TENDER PROCESS PRIOR TO THE AWARD
OF THE CONTRACT IN ACCORDANCE WITH THE PROVISIONS OF THE INTEGRITY PACT, BPCL
SHALL BE ENTITLED TO DEMAND AND RECOVER FROM BIDDER LIQUIDATED DAMAGES AMOUNT
BY FORFEITING THE EMD/BID SECURITY AS PER PROVISIONS OF THE INTEGRITY PACT.
Page 3 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
IF THE CONTRACT HAS BEEN TERMINATED ACCORDING TO THE PROVISIONS OF THE
INTEGRITY PACT, OR IF BPCL IS ENTITLED TO TERMINATE THE CONTRACT ACCORDING TO
THE PROVISIONS OF THE INTEGRITY PACT, BPCL SHALL BE ENTITLED TO DEMAND AND
RECOVER FROM CONTRACTOR LIQUIDATED DAMAGES AMOUNT BY FORFEITING THE SECURITY
DEPOSIT/PERFORMANCE BANK GUARANTEE AS PER PROVISIONS OF THE INTEGRITY PACT.
FOR ANY QUERIES/CLARIFICATIONS ON TENDER POINTS AND OTHER TERMS AND CONDITIONS
OF THE TENDER, PLEASE CONTACT AS FOLLOWS:
1. Siju M C, PROCUREMENT MANAGER,
CONTACT NOS. : LAND PH: 0484 282 1680, MOB:
E-MAIL ID: [email protected]
2. Sabareesan C K, PROCUREMENT LEADER,
CONTACT NOS. : LAND PH: 0484 282 1631, MOB:
E-MAIL ID: [email protected]
OFFICE ADDRESS:
CPO (KR), BPCL - KOCHI REFINERY, POST BAG NO. 2, AMBALAMUGAL P O, PIN -
682302, ERNAKULAM DISTRICT, KERALA, INDIA.
BIDDERS MAY RAISE DISPUTES/ COMPLAINTS, IF ANY, WITH THE PRINCIPAL APPOINTED
INDEPENDENT EXTERNAL MONITOR (IEM). THE NAME AND E MAIL I D OF INDEPENDENT
EXTERNAL MONITORS APPOINTED ARE GIVEN BELOW:
1. SHRI. GANESH VISHWAKARMA, EMAIL: [email protected]
2. SHRI. DR. ATANU PURKAYASTHA, EMAIL: [email protected]
3. SHRI. PRADEEP KUMAR, EMAIL: [email protected]
BIDDERS ARE REQUIRED TO READ AND COMPLY WITH THE FOLLOWING DOCUMENTS ATTACHED
WITH THE TENDER. ALL FORMS, DECLARATIONS, AND CERTIFICATES REQUIRED AS PER THE
BELOW DOCUMENTS SHALL BE DULY FILLED, SIGNED, STAMPED, AND UPLOADED ALONG WITH
THE TENDER DOCUMENTS. FAILURE TO SUBMIT OR SUBMISSION OF INCOMPLETE DOCUMENTS
SHALL RENDER THE BID NON RESPONSIVE AND LIABLE FOR REJECTION.
1. COMMERCIAL FORMAT
2. POLICY FOR HOLIDAY LISTING OF BIDDERS IN BPCL
3. LAND BORDER RESTRICTION POLICY
4. 5 TIER SAFETY COMPETENCY MANAGEMENT
5. TENDER ACKNOWLEDGEMENT FORM
6. COMPLIANCE TO BID REQUIREMENT FORM
7. BIDDER DOCUMENT CHECKLIST
GST IS APPLICABLE AS PER GCC CLAUSE 86 AND ADDITIONAL TERMS AND CONDITIONS
UNDER GST ARE ATTACHED WITH TENDER DOCUMENTS.
CONTRACTOR SHALL AT HIS OWN EXPENSES CARRY AND MAINTAIN INSURANCE WITH
REPUTABLE INSURANCE COMPANIES TO THE SATISFACTION OF THE OWNER AS PER GCC
Page 4 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
BIDDERS ARE ALSO REQUIRED TO READ AND COMPLY WITH THE FOLLOWING DOCUMENTS
ATTACHED WITH THE TENDER.
1. INSTRUCTIONS TO BIDDERS
2. ADVISORY ON ENVIRONMENTAL CRITERIA
3. ADVISORY ON BANK GUARANTEE
4. GOVERNMENT DIRECTIVES
5. SAFETY & SECURITY REGULATIONS
6. INSTRUCTIONS TO CONTRACTORS
THE ATTACHED TENDER DOCUMENT (TENDERDOCS) FORMS AN INTEGRAL PART OF THIS
E-TENDER. PLEASE READ, DULY FILL, SIGN, STAMP AND UPLOAD THE REQUIRED
DOCUMENTS ALONG WITH YOUR OFFER. OFFERS NOT COMPLYING THE ABOVE POINTS ARE
LIABLE TO BE REJECTED.
BPCL-KOCHI REFINERY RESERVES THE RIGHT TO ACCEPT OR REJECT ANY OR ALL
QUOTATIONS, EITHER IN WHOLE OR IN PART, AND TO ACCEPT ANY QUOTATION OTHER THAN
THE LOWEST PRICED QUOTATION WITHOUT ASSIGNING ANY REASON. ANY QUOTATION
CONTAINING INCORRECT STATEMENT OR INCOMPLETE INFORMATION IS LIABLE TO BE
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
00010 RC FOR GT MAINTENANCE KR BGGTS YEAR1 12.11.2026
The item 00010 covers the following services:
CAP POWER PLANT TECH ADV (MECH) (Mandays)
Per day charges for providing of Technical Advisors (Mechanical), as per the
scope of work and terms and conditions, who will be responsible for supporting
BPCL in emergency maintenance / trouble shooting, including identification of
the problem, assisting in rectification work, commissioning back the system
and preparing necessary Failure Analysis Reports, etc. The job shall be
carried out as per instructions of the BPCL Engineering incharge at the
respective locations.
Service Item 10: Unit basic rate in words ________________________________
CONT ASST EXTRA HR WORK TA (MECH) OT (Hours)
CONTRACT ASSISTANCE
EXTRA HOUR WORK
Per hour charges for Technical Advisors (Mechanical) for working beyond normal
Page 5 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
hours and / or on sundays/ public holidays as per the scope of work and terms
and conditions.
Service Item 20: Unit basic rate in words ________________________________
CONT ASST MISC CHARGE-TRAVEL TIME (Number)
CONTRACT ASSISTANCE
Charges towards travel time per trip per person
Service Item 30: Unit basic rate in words ________________________________
CONT ASST MISC TO&FRO TRAVEL (Number)
CONTRACT ASSISTANCE
To & fro travel charges per trip per person (Technical Advisors) to any of the
BPCL locations.
Service Item 40: Unit basic rate in words ________________________________
CONT ASST OEM SERVICE BOARDING EXP (Days)
CONTRACT ASSISTANCE
BOARDING EXPENSE INCLUSIVE OF ALL INCIDENTAL EXPENSES.
Service Item 50: Unit basic rate in words ________________________________
Page 6 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
CONT ASST CREW (MECH (Number)
CONTRACT ASSISTANCE
Charges towards travel time per trip per person for crew (Mechanical)
Service Item 60: Unit basic rate in words ________________________________
CONT ASST-TRAVEL TIM - CREW (Number)
CONTRACT ASSISTANCE
To & fro travel charges per trip per person (Mechanical Crew) to any of the
BPCL locations.
Service Item 70: Unit basic rate in words ________________________________
CONT ASST-BOARDING - CREW (Days)
CONTRACT ASSISTANCE
BOARDING EXPENSE INCLUSIVE OF ALL INCIDENTAL EXPENSES FOR CREW (MECHANICAL)
Service Item 80: Unit basic rate in words ________________________________
CONT ASST 8 HR SKILLED (Days)
CONTRACT ASSISTANCE
Deployment of skilled manpower for preventive/ breakdown maintenance purposes
as directed and scheduled scope by the Engineer-in charge.
Page 7 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
Service Item 90: Unit basic rate in words ________________________________
CONT ASST EXTRA HR WORK SPLZD SKLLD (each)
CONTRACT ASSISTANCE
EXTRA HOUR WORK
RATE PER EXTRA HOUR WORKING TOWARDS HIRING OF SPECIALZED SKILLED PERSONNEL FOR
CONTRACT ASSISTANCE AS PER SCOPE OF WORK.
Service Item 100: Unit basic rate in words ________________________________
MECH GEN CLNG GT FILTERS (Lumpsum)
LUMPSUM RATE FOR REMOVAL/CLEANING/REPLACEMENT OF AIR INLET FILTERS OF GT. THE
SCOPE ALSO INCLUDES SHIFTING TO APPROPRIATE LOCATION FOR
CLEANING/TRANSPORTATION OF NEW FILTERS FROM ISSUE POINT TO SITE IF NEW FILTERS
ARE TO BE PUT AND FIXING BACK OF FILTERS AS PER SCOPE OF WORK.DISPOSAL OF
SCRAP FILTERS/SCRAP TO THE DESIGNATED LOCATION IS ALSO INCLUDED IN THE SCOPE.
Service Item 110: Unit basic rate in words ________________________________
CAP POW PLNT FR5 GT INSPEC GT BI (Number)
Carrying out only Borescope Inspection of Frame-V, Gas Turbines as per scope
of work and terms & conditions. This shall include supply of all labour,
supervision, tools, tackles, instruments, etc. required to complete the job as
per the instructions of BPCL Engineer incharge.
Page 8 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
Service Item 120: Unit basic rate in words ________________________________
CAP POW PLNT FR6 GT INSPEC GT BORO (each)
To carry out boroscopic Inspection of Gas Turbine Fr-5 and Fr-6 machines as
per instruction of BPCL site incharge
Service Item 130: Unit basic rate in words ________________________________
CAP POW PLNT FR5 GT REP/REFURB GT CL (set)
Carrying out repair and refurbishment work of Combustion Liners of the Frame -
V, Gas Turbines as per scope of work and terms & conditions. This shall
include supply of all materials, labour, supervision, tools, tackles,
instruments, etc. required. The Repair work shall be carried out at the
Vendor's Works, necessary packing, forwarding, transportation, insurance shall
be organized by BPCL. The job shall be carried out to meet the design /
performance creterion as prescribed by the OEM.
Service Item 140: Unit basic rate in words ________________________________
CAP POW PLNT FR5 GT REP/REFURB GT FN (set)
Carrying out repair and refurbishment work of Fuel Nozzles of the Frame - V,
Gas Turbines as per scope of work and terms and conditions. Set of 10nos.
This shall include supply of all materials (but excluding replacement of
parts), labour, supervision, tools, tackles, instruments, etc. required. The
Repair work shall be carried out at the Vendor's Works, necessary packing,
forwarding, transportation, insurance shall be organized by BPCL. The job
shall be carried out to meet the design / performance creterion as prescribed
Page 9 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
Service Item 150: Unit basic rate in words ________________________________
CAP POW PLNT FR5 GT INSPEC GT MI (Number)
Carrying out Major Inspection of Frame-V, Gas Turbines as per scope of work
and terms & conditions. This shall include supply of all labour, supervision,
tools, tackles, instruments, etc. required to complete the job as per the
instructions of BPCL Engineer incharge.
Service Item 160: Unit basic rate in words ________________________________
CAP POW PLNT FR5 GT INSPEC GT CI+BI (Number)
Carrying out Combustion & Bore scope Inspection of Frame - V, Gas Turbines as
per scope of work and terms & conditions. This shall include supply of all
labour, supervision, tools, tackles, instruments, etc. required to complete
the job as per the instructions of BPCL Engineer incharge.
Service Item 170: Unit basic rate in words ________________________________
CAP POW PLNT FR6 GT INSPEC GT CI+BI (Number)
Carrying out Combustion & Bore scope Inspection of Frame - VI, Gas Turbines as
per scope of work and terms & conditions. This shall include supply of all
labour, supervision, tools, tackles, instruments, etc. required to complete
the job as per the instructions of BPCL Engineer incharge.
Service Item 180: Unit basic rate in words ________________________________
Page 10 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
CAP POW PLNT FR6 GT INSPEC HGP (each)
Gas Turbine Hot Gas Path Inspection as per instruction of BPCL site in-charge.
Service Item 190: Unit basic rate in words ________________________________
CONT ASST MISC DEMOB/MOB MI (Number)
CONTRACT ASSISTANCE
Demobilisation and mobilisation charges of all persons deployed for the GT
inspection jobs (MI), under specific conditions as per the scope of work and
terms and conditions
Service Item 200: Unit basic rate in words ________________________________
State GST % : ________ % Central GST % : ________ % Integrated GST % : ________ %
Union Ter. GST % : ________ % GST Comp. Cess % : ________ %
HSN Code / SAC Code : ______________
Billing State : ______________
00020 RC FOR GT MAINTENANCE KR BGGTS YEAR1 12.11.2026
The item 00020 covers the following services:
CAP POWER PLANT TECH ADV (MECH) (Mandays)
Per day charges for providing of Technical Advisors (Mechanical), as per the
scope of work and terms and conditions, who will be responsible for supporting
BPCL in emergency maintenance / trouble shooting, including identification of
Page 11 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
the problem, assisting in rectification work, commissioning back the system
and preparing necessary Failure Analysis Reports, etc. The job shall be
carried out as per instructions of the BPCL Engineering incharge at the
respective locations.
Service Item 10: Unit basic rate in words ________________________________
CONT ASST EXTRA HR WORK TA (MECH) OT (Hours)
CONTRACT ASSISTANCE
EXTRA HOUR WORK
Per hour charges for Technical Advisors (Mechanical) for working beyond normal
hours and / or on sundays/ public holidays as per the scope of work and terms
and conditions.
Service Item 20: Unit basic rate in words ________________________________
CONT ASST MISC CHARGE-TRAVEL TIME (Number)
CONTRACT ASSISTANCE
Charges towards travel time per trip per person
Service Item 30: Unit basic rate in words ________________________________
CONT ASST MISC TO&FRO TRAVEL (Number)
CONTRACT ASSISTANCE
To & fro travel charges per trip per person (Technical Advisors) to any of the
BPCL locations.
Page 12 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
Service Item 40: Unit basic rate in words ________________________________
CONT ASST OEM SERVICE BOARDING EXP (Days)
CONTRACT ASSISTANCE
BOARDING EXPENSE INCLUSIVE OF ALL INCIDENTAL EXPENSES.
Service Item 50: Unit basic rate in words ________________________________
CONT ASST CREW (MECH (Number)
CONTRACT ASSISTANCE
Charges towards travel time per trip per person for crew (Mechanical)
Service Item 60: Unit basic rate in words ________________________________
CONT ASST-TRAVEL TIM - CREW (Number)
CONTRACT ASSISTANCE
To & fro travel charges per trip per person (Mechanical Crew) to any of the
BPCL locations.
Service Item 70: Unit basic rate in words ________________________________
CONT ASST-BOARDING - CREW (Days)
Page 13 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
CONTRACT ASSISTANCE
BOARDING EXPENSE INCLUSIVE OF ALL INCIDENTAL EXPENSES FOR CREW (MECHANICAL)
Service Item 80: Unit basic rate in words ________________________________
CONT ASST 8 HR SKILLED (Days)
CONTRACT ASSISTANCE
Deployment of skilled manpower for preventive/ breakdown maintenance purposes
as directed and scheduled scope by the Engineer-in charge.
Service Item 90: Unit basic rate in words ________________________________
CONT ASST EXTRA HR WORK SPLZD SKLLD (each)
CONTRACT ASSISTANCE
EXTRA HOUR WORK
RATE PER EXTRA HOUR WORKING TOWARDS HIRING OF SPECIALZED SKILLED PERSONNEL FOR
CONTRACT ASSISTANCE AS PER SCOPE OF WORK.
Service Item 100: Unit basic rate in words ________________________________
MECH GEN CLNG GT FILTERS (Lumpsum)
LUMPSUM RATE FOR REMOVAL/CLEANING/REPLACEMENT OF AIR INLET FILTERS OF GT. THE
SCOPE ALSO INCLUDES SHIFTING TO APPROPRIATE LOCATION FOR
CLEANING/TRANSPORTATION OF NEW FILTERS FROM ISSUE POINT TO SITE IF NEW FILTERS
ARE TO BE PUT AND FIXING BACK OF FILTERS AS PER SCOPE OF WORK.DISPOSAL OF
SCRAP FILTERS/SCRAP TO THE DESIGNATED LOCATION IS ALSO INCLUDED IN THE SCOPE.
Page 14 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
Service Item 110: Unit basic rate in words ________________________________
CAP POW PLNT FR5 GT INSPEC GT BI (Number)
Carrying out only Borescope Inspection of Frame-V, Gas Turbines as per scope
of work and terms & conditions. This shall include supply of all labour,
supervision, tools, tackles, instruments, etc. required to complete the job as
per the instructions of BPCL Engineer incharge.
Service Item 120: Unit basic rate in words ________________________________
CAP POW PLNT FR6 GT INSPEC GT BORO (each)
To carry out boroscopic Inspection of Gas Turbine Fr-5 and Fr-6 machines as
per instruction of BPCL site incharge
Service Item 130: Unit basic rate in words ________________________________
CAP POW PLNT FR5 GT INSPEC GT CI+BI (Number)
Carrying out Combustion & Bore scope Inspection of Frame - V, Gas Turbines as
per scope of work and terms & conditions. This shall include supply of all
labour, supervision, tools, tackles, instruments, etc. required to complete
the job as per the instructions of BPCL Engineer incharge.
Service Item 140: Unit basic rate in words ________________________________
CAP POW PLNT FR6 GT INSPEC GT CI+BI (Number)
Page 15 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
Carrying out Combustion & Bore scope Inspection of Frame - VI, Gas Turbines as
per scope of work and terms & conditions. This shall include supply of all
labour, supervision, tools, tackles, instruments, etc. required to complete
the job as per the instructions of BPCL Engineer incharge.
Service Item 150: Unit basic rate in words ________________________________
CAP POW PLNT FR6 GT INSPEC HGP (each)
Gas Turbine Hot Gas Path Inspection as per instruction of BPCL site in-charge.
Service Item 160: Unit basic rate in words ________________________________
CAP POW PLNT FR6 GT INSPEC GT MI (Number)
Carrying out Major Inspection of Frame - VI, Gas Turbines as per scope of
work and terms & conditions. This shall include supply of all labour,
supervision, tools, tackles, instruments, etc. required to complete the job as
per the instructions of BPCL Engineer incharge.
Service Item 170: Unit basic rate in words ________________________________
CONT ASST MISC DEMOB/MOB MI (Number)
CONTRACT ASSISTANCE
Demobilisation and mobilisation charges of all persons deployed for the GT
inspection jobs (MI), under specific conditions as per the scope of work and
terms and conditions
Page 16 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
Service Item 180: Unit basic rate in words ________________________________
State GST % : ________ % Central GST % : ________ % Integrated GST % : ________ %
Union Ter. GST % : ________ % GST Comp. Cess % : ________ %
HSN Code / SAC Code : ______________
Billing State : ______________
* 1 SCOPE OF WORK
BPCL Scope of Supply :
1. Full time coordination (single point of contact) for the outage
2. Gate passes, permission to work etc to facilitate 24 hrs working if
3. Lifting facilities including EOT crane and Test Certificate.
4. Lifting equipment and transportation equipment for transporting parts
from BPCL warehouse to gas turbine work area
5. Sleepers, packers and special lifting devices
6. Spares required for assembly of machine
7. Lubricants / chemicals which go in to machine. This excludes DP Test Kits.
8. Electricity, compressed air and water supply at gas turbine work area
9. Adequate illumination for entire work area.
10. Medical aid in case emergencies
11. BPCL Safety training
1. The Inspection jobs shall include supply of all manpower (Specialized,
skilled and unskilled), tools, tackles, measuring instruments, etc. required
to complete the job as per the instructions of the BPCL Engineer In-charge and
ensuring the GTs are back in operation with the desired level of performance.
This shall include replacement of all spares I parts as recommended.
2. BGGTS has to arrange for Camera for recording Photographs of Shutdown and
Report Compilation. Photos are to be shared with BPCL before leaving Site. For
communication with BPCL Engineer, BGGTS also has to arrange an Intrinsic Phone
with SIM Card and the same is to cleared before Work Commencement. For
Conveyance of TA and Crew, BGGTS has to arrange Separate Vehicles and in no
circumstances BPCL Vehicle will be issued.
Page 17 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
3. All the jobs shall be carried out as per standard engineering practice
and guidelines of the OEM. All Inspections and planned maintenance activities
shall be jointly discussed between BGGTS & BPCL and schedule for the same
shall be drawn up, well in advance, in the beginning of the year. It will be
BGGTS' responsibility to plan for the requisite materials, inspection Kits (or
required components),etc., advice BPCL accordingly and ensure their
availability in time for the Inspections & planned maintenance. BGGTS also has
to ensure physical checking of Spares before Shutdown Commencement.
4. Attending to emergency maintenance I breakdowns, will be limited to
deputing specialized and experienced technicians I engineers, who shall
determine the reasons of failure, suggest rectification methodology, supervise
and assist in the actual rectification work, help BPCL in getting the Unit
back on line and commissioning the system. Necessary Reports on analysis and
findings, along with recommendations (if any) shall also be submitted to BPCL.
5. In case of Emergency Breakdowns, BPCL shall be informing BGGTS over
telephone or in writing and BGGTS shall try to depute their persons to site
within 24 hours of the verbal/written communication. In case of emergencies,
it shall be BPCL's responsibility to organize for entry passes for BGGTS
6. All Inspection and Emergency Breakdowns jobs shall call for three shifts,
round the clock working, including all Sundays & Holidays. Manpower planning
to that effect shall be done accordingly.
7. BGGTS shall ensure the quality of engineers, electricians, instrument
technicians, welders, riggers, fitters, etc. deployed at site. They should
have requisite skills and experience of executing similar jobs. Electrician
should have Valid Electrician Pass in accordance to BPCL Formalities for
taking Construction Power Supply Request and Handlamps Request in BGGTS name.
All welders deployed at site shall have to be approved by BPCL Inspection
Dept. No manpower deployed at site shall be replaced during the progress of
the job, without prior permission from BPCL Engineer In-charge. Details of
work done shall be documented and submitted to BPCL, date wise. BGGTS shall
nominate a dedicated service manager as a single point contact for the jobs
carried out under this Contract, who will coordinate the planning, resource
allocation and execution of the jobs.
8. All tools, tackles, welding sets, generators, measuring instruments
shall be of reputed make and in good serviceable condition, with requisite
certification I calibration records as required by BPCL. Specific certificates
should be available for all lifting tools & tackles. Proper electrodes as
specified in action report I approved by BPCL shall only be used and proper
oven arrangement shall be used for use of E7018 electrodes. Mechanized tools
shall be used for handling the work, as far as possible. M/s BGGTS shall
Page 18 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
ensure that there are minimum rejections I rework. Arrangement for normal DP
test & Fluorescent DP test Kit including consumables will be in the scope of
ENTRY PASSES & SAFETY TRAINING:
BGGTS shall comply with all requirements for obtaining the Entry Pass and
Safety Training, as applicable for all persons deputed to BPCL Refineries.
Manpower planning and deployment at site, to that effect shall be done well in
advance so as to reach Site atleast 3 days in advance of Shutdown
commencement. Availability of labourlicense, ESIC, PF, etc. (as applicable)
for all the people deployed at site, shall be ensured by BGGTS. All persons
deployed at the job site should have valid Passport/ Voter Identity card/
Ration card with them, as proof of their address for issuing gate pass. All
persons have to undergo one safety training as a pre-requisite for issuing
Pass Formalities Procedure to be followed for entry
1. COVID-19 Test to be carried out before Entry as per BPCL Health Centre
2. HSE Training format to be submitted for attending Safety Training
3. P.O Registration to be done along with Entry Pass Request and Request for
commencement of work Form7
4. ESI/PF Exemption Request to be shared along with Insurance Policy Letter
with Validity date. Declaration regarding WC/GPA policy to be also shared
along with respective Names of Persons. BPCL Format is to be maintained and
letter head is not to be made.
5. ESI/PF Exemption Format to be submitted on Contractor Letter Head
6. EPFO Form to be submitted
7. Aadhar card, bank pass book and stamp size photo - Original and 3 copies.
8. ESI-PF section template to be filled and sent to ESI-PF :
[email protected] - Kindly Mention Who All Are Under Insurance
Coverage ( Salary Exemption), Who All Are Under ESI PF and who All Are
Directly Remitted By The Contractor (Direct Remittance) , Separate Excel Bulk
Format File is also required For Each PO.
9. Original Police Clearance Certificate (PCC) document required for all.
10. PCC Undertaking to be provided as per format
11. Tools List to be shared in Soft Copy as per format
12. Labour License (for more than 19 Persons in One P.O): Contractor has to
register in Labour Portal Link and get the ID Acknowledgement through Online
Payment of 90rs/Head. Approach ESI/PF with the printout and Mail, 20rs Bond
Paper, Form2 Acknowledgement and Power of Attorney (For Sub-contract).
13. Laptop Permission to be filled by TA
14. Camera Permission to be filled by TA
15. Intrinsic Mobile Permission to be filled by TA
16. Form III required for INTER STATE LABOUR MIGRANT LICENSE from Kerala
government. Request form attached- Request Form to be given to BPCL for
issuing Certificate which is to be scanned and uploaded in Portal by
Page 19 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
Contractor for applying for INTER STATE LABOUR MIGRANT LICENSE.
All persons shall be provided with helmet, safety shoes, boiler suit, gloves,
safety goggles, safety belt and all other personal protective gear, as
required for the job and insisted by BPCL. Dust Mask, ear plugs, HT gloves,
chemical resistant aprons, etc. shall be used, wherever necessary,
specific to the nature of work. BGGTS shall arrange for the Personnel
Protective Equipment (PPE) for crew, supervisor & Engineer engaged for the
job, and non-compliance of the same will lead to penalty as per company
WORK PERMIT COMPLIANCE: All jobs carried out within the BPCL premises
shall be executed only with requisite I duly authorized Work I Fire Permits.
All safety conditions specified therein shall be strictly adhered to. BGGTS
shall make welding booths, barricading, scaffolding, etc. as instructed by the
BPCL Engineer In-charge. No job shall be carried out without proper
supervision and requisite number of supervisors shall be made available for
each shift. Standby persons shall be provided outside, whenever work is going
on inside a confined space. Only safe to use scaffolding, certified by BPCL,
shall be used. Failure to comply with the safety norms shall attract penalty
as defined by BPCL. Every Shutdown of CI/HGPI/MI is to have a Dedicated Safety
HOUSE KEEPING: When job is being executed within the BPCL premises,
the work site shall be cleared on daily basis and all the debris shall have to
be carted away to the designated location. All equipment shall be properly
arranged and placed before start of work. A separate bin shall be provided for
collecting waste generated like canteen waste, disposed gloves, cotton waste,
etc. All other debris generated from plant shall be collected and stored in
BPCL allocated space. Metal scrap shall be deposited in warehouse and
weighment slip of scrap shall be submitted to BPCL Engineer In-charge. Any
unused material, issued by BPCL, shall be deposited back to warehouse. In case
of a spillage of oil I lubricant, it shall be cleaned immediately. The work
area shall be kept clean at all times. No material shall be unloaded on Road
unless approved by BPCL. Proper approach way shall be made for movement of
cranes, hydra etc.
COMPLIANCE OF MATERIAL GATE PASSES: Any material, tools and tackles
brought inside the Refineries, shall be brought in with requisite entry
challans, duly endorsed by the respective security. Similarly any material
being taken out shall be done with requisite Gate Pass only, meeting the BPCL
entry /exit regulations. Similarly, any material withdrawn I returned to BPCL
Warehouse shall be done only through requisite documentation, duly authorized
The machine shall be restarted after completion of .all the activities on
Page 20 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Item Material Qty Unit Unit Basic Rate
Description Delivery date (in Figures)
the Gas Turbine and its associated equipment which may or may not coincide
with the mechanical completion. However the BGGTS persons has to be available
at site up to the successful restart and trials of the equipment at various
fuels and loads.
All jobs indicated in the scope of work shall be carried out under the
specific line items. However, in case of any other additional jobs arising
for planned or unplanned maintenance of the GTs, the same shall be paid under
the per day rate available in this contract. The per day rate indicated shall
be inclusive of man-day charges, travel, boarding & lodging charges,
considering extended hours of working including Sunday/Holiday working, as
applicable. The scope of work shall include but not limited to the activities
Any other job that is required to be carried out for completion of entire
Inspection but not included I mentioned in the Scope of Work or anywhere else
shall also have to be executed by the contractor.
MOBILIZATION: BGGTS Complete team shall reach the site atleast 3days ahead of
the schedule outage date, to fulfill Entry Pass formalities. The BGGTS
engineer shall have to be at specific GT Site one day prior to shut down of
the unit to collect pre-inspection data. The mechanical completion, after any
type of Inspection related jobs, shall be considered as the successful and
trouble free trial in FSNL and Liquid, Gas Trials. BGGTS team will be
available for BPCL restarting the unit without any cost implications.
Warranty Period :
For Site Services: All Inspection & site services carried out by BGGTS
shall be warranted for workmanship for a period of 6 months from the date of
completion of the site services.
For Refurbished Items: All repaired I refurbished items shall be warranted for
a period of 8000 equivalent operational hours or 18 months from the date of
dispatch or 12 months from the date of installation, whichever is earlier.
Time of Completion of Refurbishment/Repair Jobs of Components : 6 Months from
Receipt at BGGTS Refurbishment Facility
Other Terms and Conditions:
Time of COmpletion : 2 Years from the date of award of PO
* 2 GCC & OTHER TENDER DOCUMENTS
Page 21 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
Grand Total (inclusive of all taxes, duties/charges etc)
Page 22 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
TERMS & CONDITIONS
Important Notice
Sr.No Description
001 Quotation received after due date will not be entertained
002 Your quotation must specify exact amount or percentage discount,
GST, Charges, Transport, Packing & forwarding,
etc. as applicable.
003 In case you are unable to quote, kindly send the quotation with a
regret for our records. Non-receipt of a regret will adversely
affect your vendor rating.
004 No quotation will be accepted without your rubber stamp and
005 Your quotation must be strictly in enclosed envelope
indicating Collective RFQ No., RFQ No. and due date.
006 For all future correspondences please mention the vendor code
Collective RFQ Number & RFQ Number.
LIST OF ENCLOSURES
1. SCOPE OF WORK
2. GCC & OTHER TENDER DOCUMENTS
Page 23 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
To:M/s. BPCL ESTIMATE MUMBAI - 400038 India (300648)
-------Tear off Portion to be pasted on the envelope containing offer------------
Collective RFQ No. :
Our Reference: 12.26011 Due Date : 08.06.2026
RFQ No. : 6001933593 Due Time : 14:00:00
PROCUREMENT & CONTRACT SERVCIES
BPCL - KOCHI REFINERY
POST BAG NO 2, AMBALAMUGAL
Purchase Group : J12-MECHANICAL
Page 24 of 24 Vendor Sign & Stamp For Bharat Petroleum Corporation Ltd.
Central Procurement Organisation (R)
Bharat Petroleum Corporation Limited, Kochi Refinery
ITEMWISE DETAILS OF QUOTE
(For detailed descriptions and items, please refer RFQ/Scope of Works)
TWO YEAR RATE CONTRACT FOR GT MAINTENANCE BY M/S.BGGTS AT BPCL KOCHI REFINERY
Sl. No. ITEM DESCRIPTION QTY UoM RATE (Rs)
10 RC FOR GT MAINTENANCE KR BGGTS YEAR
10.10 89002730 CAP POWER PLANT TECH ADV (MECH) 40 MDY
10.20 89002753 CONT ASST EXTRA HR WORK TA (MECH) OT 160 HR
10.30 89002751 CONT ASST MISC CHARGE-TRAVEL TIME 10 NO
10.40 89002755 CONT ASST MISC TO&FRO TRAVEL 10 NO
10.50 9009404 CONT ASST OEM SERVICE BOARDING EXP 40 DAY
10.60 9028590 CONT ASST CREW (MECH 100 NO
10.70 9028203 CONT ASST-TRAVEL TIM - CREW 100 NO
10.80 9028202 CONT ASST-BOARDING - CREW 100 DAY
10.90 9014143 CONT ASST 8 HR SKILLED 100 DAY
10.100 9009397 CONT ASST EXTRA HR WORK SPLZD SKLLD 400 EA
10.110 89002242 MECH GEN CLNG GT FILTERS 4 LS
10.120 89002731 CAP POW PLNT FR5 GT INSPEC GT BI 1 NO
10.130 89002680 CAP POW PLNT FR6 GT INSPEC GT BORO 2 EA
10.140 89002733 CAP POW PLNT FR5 GT REP/REFURB GT CL 1 SET
10.150 89002713 CAP POW PLNT FR5 GT REP/REFURB GT FN 2 SET
10.160 89002734 CAP POW PLNT FR5 GT INSPEC GT MI 1 NO
10.170 89002732 CAP POW PLNT FR5 GT INSPEC GT CI+BI 1 NO
10.180 89002718 CAP POW PLNT FR6 GT INSPEC GT CI+BI 1 NO
10.190 89002586 CAP POW PLNT FR6 GT INSPEC HGP 3 EA
10.200 89002761 CONT ASST MISC DEMOB/MOB MI 1 NO
20 RC FOR GT MAINTENANCE KR BGGTS YEAR
20.10 89002730 CAP POWER PLANT TECH ADV (MECH) 40 MDY
20.20 89002753 CONT ASST EXTRA HR WORK TA (MECH) OT 160 HR
20.30 89002751 CONT ASST MISC CHARGE-TRAVEL TIME 10 NO
20.40 89002755 CONT ASST MISC TO&FRO TRAVEL 10 NO
20.50 9009404 CONT ASST OEM SERVICE BOARDING EXP 40 DAY
20.60 9028590 CONT ASST CREW (MECH 100 NO
20.70 9028203 CONT ASST-TRAVEL TIM - CREW 100 NO
20.80 9028202 CONT ASST-BOARDING - CREW 100 DAY
20.90 9014143 CONT ASST 8 HR SKILLED 100 DAY
20.100 9009397 CONT ASST EXTRA HR WORK SPLZD SKLLD 400 EA
20.110 89002242 MECH GEN CLNG GT FILTERS 4 LS
20.120 89002731 CAP POW PLNT FR5 GT INSPEC GT BI 1 NO
20.130 89002680 CAP POW PLNT FR6 GT INSPEC GT BORO 2 EA
20.140 89002732 CAP POW PLNT FR5 GT INSPEC GT CI+BI 1 NO
20.150 89002718 CAP POW PLNT FR6 GT INSPEC GT CI+BI 3 NO
20.160 89002586 CAP POW PLNT FR6 GT INSPEC HGP 3 EA
20.170 89002720 CAP POW PLNT FR6 GT INSPEC GT MI 1 NO
20.180 89002761 CONT ASST MISC DEMOB/MOB MI 1 NO
TOTAL QUOTED AMOUNT EXCLUDING GST
TOTAL QUOTED AMOUNT INCLUDING GST
Total Quoted Amount in Words:
Name & Signature with Seal
BPCL VENDER CODE (IF REGISTERED VENDOR)
To be uploaded with price bid only
ACKNOWLEDGEMENT SHEET
having office at (full address) ……………………………………………………………………………………………………
downloaded your Request For Quotation, Collective RFQ No.1000……. dated…………for the job
“………………………………………………………………………………………………………………………” with attached tender documents.
I/We hereby confirm that we have gone through the above tender documents in detail including
technical specifications of all the items covered in the above Request For Quotation and
understood the scope of the job, scope of supply and all the terms and conditions contained in
the Request For Quotation and tender documents.
I/We, also confirm our acceptance (without any deviations) to the scope of work, scope of
supply, Special Conditions of Contract, General Conditions of Contract (GCC), Safety and Security
Regulation, Corrigendum, if any, and all the terms and conditions contained in the Request For
Quotation–Collective RFQ No. 1000……………. and we are hereby returning this copy as an
acknowledgement of receipt and acceptance, duly signed and stamped.
I/We, hereby confirm that I/We have quoted in the Priced Bid attached in the E-Tender Portal
against all the items of the tender.
Format for Undertaking from Bidder
(on Bidders letter head duly stamped & signed)
Declaration on Non-Disclosure Agreement (NDA)
Subject: Declaration for applicable Non-Disclosure Agreement (NDA) on successful
award of contract for related documents of the Tender
Ref : CRFQ No. 1000_______ , E-tender/ GeM bid no.:_________
In order to pursue the business purpose of the project/Job, if in case, it is recognized
between buyer (Engineer in charge) and seller that there is a need to disclose certain
information (if any) and it is then necessary to protect such confidential information from
unauthorized use and further disclosure to any other third party.
We, M/s_____________________________ hereby confirm and take undertaking that all the
information shared with us as the executing vendor/seller for the purpose of business
shall be kept confidential.
In this context, a separate NDA agreement (if any) will be executed between buyer
(Engineer in charge) and seller based on agreed mutual discussion as applicable time to
time on successful award of job to safe guard confidentiality of information.
Authorized Signature
(Seal of the Company) / Date
COMMERCIAL FORMAT
2 Offer No. and Date
3 Company name & Address
4 Invoicing location & Vendor code in BPCL, if any.
5 Name of contact person, Mobile number & E mail
6 If EMD is applicable,
a. Mention amount & mode of EMD Submission
(BG / NEFT / Insurance Surety Bond)
b. Mention the concerned policy/clause of EMD
7 GST in % & SAC No.
8 Confirm acceptance of all clauses and conditions
in the RFQ and tender document attached to this
tender / enquiry.
9 Confirm item-wise det ai l s o f quot ed prices a s
p e r at ta ch e d fo r m a t are uploaded along with
price bid only.
10 If purchase preference required, mention the
name of policy (MSE / PPPMII / Startup / PSU)
11 Confirm the bidder has not made any other bid or
multiple bids as per attached “One bid per bidder
12 Confirm no terms and conditions / wordings /
sentences have been changed or modified by me
in the tender document at the time of submission
Signature ……………………………
Office Seal ………………………………
Deviation & Exception Form
E Tender No. …………………………………..
Name of Job …………………………………
Bidders must adhere to every aspect of the tender document without any deviation or exceptions. The
bidders are required to mention no technical deviations, commercial deviations and exceptions in this form.
In cases where deviations and exceptions are unavoidable, bidders may specify them only in the format
outlined below. BPCL reserves the right to accept or reject the offer based on the deviations and exceptions.
The deviations and exceptions mentioned elsewhere in the offer other than this form shall not be taken
cognizance by the Company. Bidder shall state the reasons for the deviations & exceptions in the “Reason
for deviations” column. All other aspect of the tender, not mentioned in this form, shall be deemed to be
fully complied by the bidder. Only the deviations & exceptions listed herein and accepted by BPCL, shall
constitute the contract requirements for the award of contract to the vendor.
Technical Deviations & Exceptions
Sl No. Page/ Document / Technical Deviation/Exception to Reason for
Annexure No. Annexure Name Requirements Technical Requirements Deviations
No Technical Deviation
Commercial Deviations & Exceptions
Sl No. Page / Document / Commercial Deviation/Exception to Reason for
Annexure No. Annexure Name Requirements Commercial Requirements Deviations
No Commercial Deviation
ANNEXURE - VIII
INSTRUCTIONS TO BIDDERS
Bharat Petroleum Corporation Limited, CPO-Kochi Refinery invites offers from vendors as per Tender
1. EARNEST MONEY DEPOSIT (EMD): Not Applicable.
2. AWARD OF P O / CONTRACT:
After opening of priced bids, the successful bidders for supply will be decided based on the evaluation
In case of one time contract, a 10-digit purchase order starting with 45 series will be issued to the successful
bidders through “SAP” for awarding the contract which will be deemed valid for supply of the service.
In case of rate contracts, a 10-digit contract starting with 46 series and a purchase order starting with
series will be issued to the successful bidders through “SAP” for awarding the contract which will be deemed
valid for supply of the service. The subsequent PO/Call offs and schedule of supplies will be intimated later.
Schedule of call off will be as per BPCL requirement i.e., need basis only.
3. GENERAL POINTS:
a) Bidder shall confirm that the offer is strictly as per tender terms and conditions, deviations if any shall
be clearly indicated in the deviation/exception form only. The deviations indicated elsewhere may
not be considered by BPCL.
b) The commercial terms offered by the bidder shall be firm, clear and specific as the tender will
normally be finalized without seeking any clarification.
c) Bidder shall accept the contract for all items or part thereof (as applicable) without any precondition
on minimum value of contract / call off. Offer with precondition on this is liable to be rejected.
d) Service is required to be delivered as per delivery schedule informed by Kochi Refinery.--
e) Bidder to confirm that during emergencies, service shall be made at a short notice on priority.
f) Bidder to confirm that the service if rejected on account of poor quality shall be replaced free of cost.
g) BPCL reserves the right to accept or reject any tender in part or full, without assigning any reason
whatsoever & also to give purchase preference to public enterprises, as admissible under the existing
policies and guidelines of BPCL.
h) Any effort by bidder or bidder’s agents, consultant or representative, howsoever described, to
influence the owner in any way concerning scrutiny / consideration / evaluation / comparison of the
bid or decision concerning award of contract shall entail rejection of the bid.
i) Offers & all correspondence must be in English language only.
j) Cutting / correction: to the extent possible, the bids shall be submitted with nil corrections. If
unavoidable, bidders may make corrections, but should be duly signed by the bidder’s authorized
k) Rates quoted shall remain firm till the execution of the contract period and no claims for price
escalation shall be entertained. This clause is not applicable for tenders floated with price escalation
4. BID DOCUMENTS:
a) Bid documents consist of all the documents and any additional document submitted by the bidder,
in support of their claim of meeting the requirements in this tender.
b) BPCL’s General Conditions of Contract (GCC) is an essential part of this bid document. The terms &
conditions mentioned therein, to the extent that they are applicable in the context of this
procurement, shall hold good for this tender, in addition to the requirements, terms & conditions
mentioned elsewhere in these tender documents. In case of any conflict between the terms &
conditions in the GCC with that mentioned elsewhere in these tender documents, the latter shall
c) Bidder is expected to read, understand and accept all terms & conditions without any deviation. In
case bidder takes any deviation to any of the terms & conditions in these tender documents, the
same shall be stated clearly with reasons in technical & commercial deviation sheet.
d) BPCL reserves the right to accept or reject any of the deviations. In case any of the deviations taken
by any bidder is not acceptable to BPCL, the same shall be taken up with bidder for withdrawal /
modification of the deviation as deemed fit. In case the bidder declines to withdraw / modify the
deviation as desired by BPCL, BPCL reserves the right to reject the offer at the technical / un-priced
bid evaluation stage itself.
5. INSTRUCTIONS TO VENDORS FOR E-TENDERING
a) The vendors are requested to download the tender from BPCL’s e-tendering website
https://bpcltenders.eproc.in & participate in the tender as per the instructions given above & herein,
on or before the due date & time of the tender. The tender available on the BPCL website can be
downloaded for reading purpose only. For participation in the tender, please fill up the tender
online on the e-tender system available on https://bpcltenders.eproc.in.
b) For registration on the e-tender site https://bpcl.eporc.in, vendors needs to download the User
Instruction Manual from the site & read it. They shall have to select “Enrollment” and complete the
“Supplier Registration Form” by filling in all the information correctly. Kindly remember the login id,
password entered therein. After completing this process, system will generate an e-mail wherein a
system generated “Challenge Phrase” will be mailed to you to complete balance registration process.
c) As a pre-requisite for participation in the tender, vendors are required to obtain a valid Digital
Certificate of Class III and above as per Indian IT Act from the licensed Certifying Authorities operating
under the Root Certifying Authority of India (RCIA), Controller of Certifying Authorities (CCA). The cost
of obtaining the digital certificate shall be borne by the Vendors. In case any Vendors so desires, he
may contact our e-procurement service provider M/s. C1 India Pvt. Ltd. (Contact no. +91 22 66865600)
for obtaining the digital signature certificate. Please note that generally, it takes 5 working days for
obtaining a digital certificate after the submission of all required documents/fees. Non availability of
Digital Certificate shall be considered as the vendors regret.
d) Our e-tendering service provider – C1 India Pvt Ltd. For system related queries, the Vendors may
1. Support desk E Mail ID is [email protected]
2. Mr. Manoj VP, Mob. +91 8907132680, e-mail id: [email protected]
3. Mr. Hebrin George, Mob. +91 8921155218, e-mail id: [email protected]
e) All documents required for the bid shall be uploaded on the appropriate place in the E tender portal.
All documents to be signed & stamped & uploaded.
f) Corrigendum / amendment, if any, shall be notified on the site. In case any corrigendum / amendment
is issued after the submission of the bid, then such Vendors who have submitted their bids, shall be
intimated about the corrigendum/ amendment by a system-generated email. No written
communication will be circulated. It shall be assumed that the information contained therein has been
taken into account by the Vendors. They have the choice of making changes in their bid before the due
g) Vendors are required to submit their bid online on or before the due date and time of closing of the
tender as depicted in this document. Vendors shall have to log on to the website for submitting their
bid. The system time (IST) that will be displayed on e-Procurement web page shall be the time
considered for determining the expiry of due date & time of the tender and no other time shall be
taken into cognizance. Vendors are advised in their own interest to ensure that their bids are submitted
in e-Procurement system well before the closing date and time of bid. If the Vendors intends to change /
revise the bid already entered, he may do so any number of times till the due date & time of submission
deadline. However, no bid can be modified after the deadline for submission of bids. Once the entire
process of submission of online bid is complete, the Vendors are required to take the print as a proof
of submitted bid.
h) Bids/Offers shall not be permitted in e-procurement system after the due date/time of tender. Hence,
no bid can be submitted after the due date & time of submission has elapsed.
i) Please note that the offers submitted against this tender will be evaluated “electronically" and vendors
are requested to comply with the guidelines while submitting the offer. Please note that there shall
not be any reference of the offered price/rates in the “unpriced bid” and any such offers having these
details shall be summarily rejected. Hard copies of the bids shall not be submitted to the office, since
hard copies shall not be considered for evaluation. Manual bids/ offers along with electronic
bids/offers shall not be permitted.
j) In two bid system, once the un-priced bids are opened, vendors can see the list of Vendors who have
participated in the bid by logging on to the portal under their user ID and password. Subsequently, in
case the price bids are opened in E Tendering platform, Vendors can see the rates quoted by all the
participating vendors for tenders having value more than 10 Lakhs.
k) No responsibility will be taken by BPCL and / or the e-procurement service provider for any delay due
to connectivity & availability of website. They shall not have any liability to Vendors for any interruption
or delay in access to the site irrespective of the cause. It is advisable that Vendors who are not well
conversant with e-tendering procedures, start filling up the tenders much before the due date / time
so that there is sufficient time available with him/ her to acquaint with all the steps & seek help if they
so require. Even for those who are conversant with this type of e-tendering, it is suggested to complete
all the activities ahead of time. It should be noted that the individual bid becomes viewable only after
the opening of the bid on/after the due date and time. Please be reassured that your bid will be
viewable only to you and nobody else till the due date/time of the tender opening. The non-availability
of viewing before due date & time is true for e-tendering service provider as well as BPCL officials.
l) BPCL and / or the e-procurement service provider shall not be responsible for any direct or indirect loss
or damages & or consequential damages, arising out of the bidding process including but not limited
to systems problems, inability to use the system, loss of electronic information etc.
ANNEXURE - XIII
Format for Declaration of Holiday Listing orders issued by BPCL or MOPNG debarring us from
carrying on business dealings with BPCL/ MOPNG
(On Company Letter Head, to be signed by the duly authorized person)
TENDER NO. : ………………
Bharat Petroleum Corporation Ltd
Dear Sir/Madam,
I /We declare and confirm that we are currently not serving any Holiday Listing orders issued by BPCL or
MOPNG debarring us from carrying on business dealings with BPCL/ MOPNG or convicted of an offence:
(a) under the Prevention of Corruption Act, 1988: or
(b) the Indian Penal Code or any other law for the time being in force, for causing any loss of life or
property or causing a threat to public health as part of execution of a public procurement contract.
Further, I/ We declare that the Agency is not or has not become bankrupt, OR is not being dissolved OR
has not resolved to be wound up OR no proceedings for winding up or dissolution has been instituted
against the Agency;
(Signature and Stamp of the Bidder)
Policy for Holiday Listing of Vendors in BPCL
1. Introduction:
Works and procurement contracts have become a major activity for corporate in current times. In course
of such contracting Oil sector PSEs deal with various “Agencies” (which shall include
vendors/parties/contractors/suppliers/consultants/Licensors/bidders). These entities are expected to
adopt ethics of highest standards and a very high degree of integrity, safety and quality
consciousness, commitments and sincerity towards the work undertaken and dealing with BPCL in such
matters. However, in few occasions, the terms are found to be infringed and deviations from expected
behavior are observed. It is not in the interest of BPCL to deal with Agencies who commit deception, fraud
or other misconduct including compromising quality and safety in the tendering and execution process.
Also, while participating in the tender and performing the contract, vendors are required to meet certain
basic performance criteria and adherence to the terms and conditions of the tender/contract. In case the
vendor fails to meet the above parameters, it is prudent to put the vendor on holiday list for specific
periods in order to deter the vendors form committing such defaults. Such decisions shall be taken based
on the gravity of the default and after following a laid down process, on case to case basis.
Holiday Listing from business dealings involves civil consequences for the “Agency” concerned. Hence, the
same requires adherence to the Principles of Natural Justice. Therefore, it is incumbent that adequate
opportunity of hearing is provided and the explanation, if tendered, is considered before passing any
order in this regard keeping in view the facts and circumstances of the case. The meaning of “Black listing”,
“Holiday Listing” and “Banning” is considered one and the same and shall hereafter be referred to only as
“Holiday Listing” and the term Holiday Listed Companies is used accordingly in this document.
2.1 The information for Bidders/Instruction to Bidders and even the General Conditions of Contract
(GCC) or General Purchase Conditions (GPC) generally provide that BPCL shall have the rights to remove
from list of approved suppliers / contractors or to ban business dealings if any Agency has been found to
have committed misconduct or fraud or poor performance or anything unethical not expected from a
reputed agency.
2.2 The procedure of Holiday Listing of Agencies from Business Dealings with BPCL has been laid down
in these guidelines.
2.3 These guidelines are applicable across BPCL and shall form part of all the tenders. These guidelines
shall be published as a separate document in BPCL website and the General Conditions of Contract (GCC)
or General Purchase Conditions (GPC) shall have a clause expressly stating that the Guidelines and
Procedures for Holiday Listing as adopted by BPCL and available separately in BPCL website shall be
applicable in the context of all tenders floated and consequently all orders/ contracts /purchase orders
placed by BPCL.
2.4 The Holiday Listing shall be with prospective effect, i.e. for future business dealings.
3. Definitions:
In these Guidelines, unless the context otherwise requires
a) Agency: “Party/Contractor/Supplier/Vendor/Consultant/Bidder/Licensor” in the context of these
guidelines is indicated as 'Agency'.
“Party/Contractor/Supplier/Vendor/Consultant/bidders/Licensor” shall mean and include a public limited
company or a private limited company, one person company, limited liability partnership, a joint venture.
Consortium, HUF, a firm whether registered or not, an individual, co-operative society or an association
or a group of persons engaged in any commerce, trade, industry etc.
b) Allied Agency means: All concerns which come within the sphere of effective influence of the debarred
firms shall be treated as allied firms. In determining this, the following factors may be taken into
i) Whether the management is common
ii) Majority interest in the management is held by the partners or directors of banned / suspended firm
iii) Substantial or majority shares are owned by the banned / suspended firm and by virtue of this it has
a controlling voice
iv) Directly or indirectly controls, or is controlled by or is under common control with another bidder
v) All successor firms will also be considered as allied firms.
c) Appellate Authority: “Appellate Authority” shall mean the concerned functional Director of BPCL or
any other authority nominated by the C&MD. The Appellate authority shall be higher than the
“Competent Authority”.
d) Competent Authority: “Competent Authority” shall mean the authority, who is competent to take final
decision for Banning of business dealings with Agencies, in accordance with these guidelines:
The Competent Authority for a Procurement / User Department which is initiating the Holiday Listing
process should be the Regional head(or) SBU / Entity head as the case may be relevant to the said
Procurement / User Department, but not below the level of Chief General Manager
e) Corporation: “Corporation” means Bharat Petroleum Corporation Ltd. with its Registered Office at
Bharat Bhavan-I, 4&6 Currimbhoy Road, Ballard Estate, Mumbai-400001.
f) Corrupt Practice: “Corrupt Practice” means the offering, giving, receiving or soliciting, directly or
indirectly, anything of value to improperly influence the actions in selection process or in contract
execution. “Corrupt Practice” also includes any omission for misrepresentation that may mislead or
attempt to mislead so that financial or other benefit may be obtained or an obligation avoided.
g) Fraudulent Practice: “Fraudulent Practice” means and include any act or omission committed
by a agency or with his connivance or by his agent by misrepresenting/submitting false documents
and/ or false information or concealment of facts or to deceive in order to influence a selection process
or during execution of contract/ order;
h) Collusive Practice : “Collusive Practice” amongst bidders (prior to or after bid submission)”
means a scheme or arrangement designed to establish bid prices at artificial non-competitive levels and
to deprive the Employer of the benefits of free and open competition.
i) Coercive Practice: “Coercive practice” means impairing or harming or threatening to impair or harm
directly or indirectly, any agency or its property to influence the improperly actions of an agency,
obstruction of any investigation or auditing of a procurement process.
j) Officer-in-Charge: “Officer—in-Charge (OIC)” or “Engineer-in-Charge (EIC)” shall mean the person (s)
designated to act for and on behalf of BPCL for the execution of the work as per requirement of the
concerned department.
k) Malpractice: Malpractice means any corrupt Practice, Fraudulent Practice, Collusive Practice or
Coercive practice as defined herein;
l) Mis-Conduct: “Mis-conduct” means any act or omission by the Agency, making it liable for action for
Holiday Listing as per these guidelines
m) Nodal Department: “Nodal Department” means the Department primarily assigned with the role of
overseeing the Holiday Listing Process to ensure adherence to guidelines, maintaining, updating and
publishing the list of Agencies with whom BPCL has decided to ban business dealings and shall be the
Corporate Finance Department.
n) Vendor De-listment Committee: “Vendor De-listment Committee” relevant to the procurement
department which initiates the holiday listing process would the same as the vendor enlistment
Committee as per DR&A of the concerned SBU/Entity.
4. Holiday Listing:
4.1 Reasons for Holiday Listing: An Agency may be placed in Holiday List for any one or more of the
following circumstances:
4.1.1 If the Agency, in the context of its dealings with the Corporation:
a) Has indulged in malpractices;
b) Has submitted fake, false or forged documents / certificates
c) Has substituted materials in lieu of materials supplied by BPCL or has not returned or has unauthorized
disposed off materials / documents / drawings /tools or plants or equipment’s supplied by BPCL.
d) Has deliberately violated and circumvented the provisions of labour laws/ regulations / rules, safety
norms, environmental norms or other statutory requirements.
e) has deliberately indulged in construction and erection of defective works or supply of defective
f) Has not cleared previous dues to BPCL if applicable.
g) Has committed breach of contract or has abandoned the contract.
h) Poor performance of the Agency in one or several contracts;
i) Has not honored the fax of award /letter of award / Contract / Purchase order after the same is issued
j) Withdraws/ revises the bid upwards after becoming the Ll bidder.
k) Has parted with, leaked or provided confidential/ proprietary information of BPCL to any third party
without the prior consent of BPCL.
4.1.2. The following additional grounds can also be reasons for Holiday listing of an agency:
a) If a communication is received from the Administrative Ministry of the Corporation (i.e. MOP&NG) to
ban Agency from dealing with the Corporation;
b) If the Agency is or has become bankrupt, OR is being dissolved OR has resolved to be wound up OR if
proceedings for winding up or dissolution has been instituted against the Agency;
c) Any other ground, including transgression of Integrity Pact, which, in the opinion of the Corporation,
makes it undesirable to deal with the Agency; In the case of transgression of Integrity Pact, the same
should be substantiated by the verdict of the Independent External Monitor.
4.2.1 Proceedings for Holiday Listing shall be initiated against an Agency when a prima facie case for
Holiday Listing comes up, under any of the above mentioned circumstances; before taking a
decision, a fair opportunity of hearing the party should be given by means of a Show Cause notice. The
show cause notice should indicate clearly and precisely the charges/misconduct which should be based
on facts as can be proved as distinct from mere allegations. Statement containing the imputation of
misconduct or misbehavior may be appended to the show-cause notice and the “Agency” should be
asked to submit within 15 days a written statement in its defense.
4.2.2 The proceedings shall start with a proposal for initiating action against the Agency, to be raised by
the Procurement /User Department which, in the first instance, is to be cleared by the relevant Vendor
De-listment Committee.
4.2.3 The proposal shall state a brief background of the case, the action proposed and all supporting
documents, including a note from the Engineer / Officer In-Charge or the designated in-charge or the
department responsible for execution of a work, in the case the proposal is related to the
performance of a contract. A draft show cause notice is also to be attached to the proposal.
4.2.4 On preliminary examination of the proposal with attached documents, if the vendor de-listment
committee is of the opinion that action is to be initiated against the Agency, the committee will approve
the proposal along with the proposed Show Cause Notice.
4.2.5 Thereupon the Show Cause Notice, as approved, will be issued by the concerned Procurement
/User Department. Before issuing the Show Cause Notice, concerned procurement / User department
should give intimation to the Nodal Department regarding the proposed action against the Agency, along
with a copy of the Show Cause notice for record. The Nodal Department, shall in turn publish this
information in BPCL website for information and reference of all procuring departments across the
4.2.6 On receipt of the explanation from the Agency, the procurement / User Department will put up the
proposal for holiday listing, to the competent authority, through the vendor de-listment committee & the
Nodal Department; This proposal would consist of a background of the case, copy of initiation proposal
approved by vendor de-listment committee, copy of the Show Cause Notice issued and Agency’s reply
received and the procurement / User departments’ comments on the same. The period for which holiday
listing is recommended should also be clearly mentioned in the proposal. All relevant supporting
documents should also be attached; In case no explanation is received from the Agency within the
stipulated time, the case shall be preceded with ex-parte.
4.2.7 The proposal along with the reply from the Agency would be examined by the Vendor de-listment
Committee; thereafter, with the recommendation from the vendor de-listment Committee, the
proposal would be put up through the Nodal Department to the Competent Authority for final decision
on banning or otherwise.
4.2.8 The competent authority, after examining all the materials on record, including the explanation
from the Agency, will give their decision on the proposal. Competent Authority in its decision may:
a) Approve the proposal for Holiday Listing as such, OR
b) Approval the proposal for holiday listing for a period higher than that was recommended, in case the
competent authority is of the opinion that banning for a longer period is required in view of the gravity of
c) Approve the proposal for holiday listing for a period lesser than that was recommended, in case the
competent authority is of the opinion that lesser period would meet the requirement, considering
the gravity of the case, OR
d) Reject the proposal, in case, based on explanation furnished by the Agency, the Competent Authority
is of opinion that the alleged misconduct / malpractice was either not substantiated or has
happened on account of circumstances on which Agency had no control.
4.2.9 The decision of the Competent Authority regarding Holiday Listing of business dealings should be
communicated to the ’Agency’ concerned, by the concerned procurement / User department.
4.2.10 The Holiday Listing process should be completed at the earliest, and in any case within 45 days
from initiation of case by concerned Engineer / Officer — In-Charge /Department responsible for
invitation of bids.
However, if any agency, which is under holiday listing process with BPCL, has participated in a tender by
submitting bid, the department responsible for initiating the holiday listing process shall expedite
completion of the same within 21 days of technical bid opening , based on which the tender can be
proceeded with.
4.2.11 Competent Authority shall decide on the period of holiday listing, on case to case basis, depending
on the gravity of the case and considering the implications for BPCL on account of the Act/Omission on
the part of the Agency, intentions of the Agency as established from the circumstances of the case,
frequency of tendering for work of similar nature etc.
4.2.12 Duration of Holiday Listing- The period of holiday listing will be guided as per the following
a) A Bidder shall be debarred if he is convicted of an offence under the Prevention of Corruption
Act 1988 or the Indian Penal Code or any other law for time being in force, for causing any loss of life or
property or causing a threat to public health as part of execution of a public procurement for a period not
exceeding 3 years.
b) In any other case, a bidder shall be debarred for a period not exceeding 2 years.
c) The Minimum period for which as Agency is Holiday listed should not be less than six months.
Indicative holiday listing period depending upon the nature of offence / default are given below subject
to aforesaid principles:
Sr. No Reasons for holiday listing Period of
holiday listing
1 Indulged in malpractices resulting in financial loss to the Corporation 2 years
2 Submitted fake, false or forged documents / certificates 2 years
3 has substituted materials in lieu of materials supplied by BPCL or has 2 years
not returned or has unauthorisedly disposed off materials documents /
drawings / tools or plants or equipment's supplied by BPCL
Has deliberately violated and circumvented the provisions of labour
4 laws/ regulations / rules, safety norms, environmental norms or other 2 years
statutory requirements
5 has deliberately indulged in construction and erection of defective 2 years
works or supply of defective materials
6 has not cleared BPCLs previous dues if applicable 1 year
7 has committed breach of contract or has abandoned the contract 2 years
8 Poor performance of the Agency in one or several contracts 1 year
9 has not honoured the fax of award / letter of award / Contract 1 year
Purchase order after the same is issued by BPCL
10 Withdraws/ revises the bid upwards after becoming the L1 bidder 1 year
11 has parted with, leaked or provided confidential / proprietary 2 years
information of BPCL to any third party without the prior consent of BPCL
If the Agency Is or has become bankrupt, OR is being dissolved OR has
12 resolved to be wound up OR if proceedings for winding up or dissolution 2 years
has been instituted against the Agency
13 Transgression of Integrity Pact , which, in the opinion of the 2 years
Corporation, makes it undesirable to deal with the Agency;
14 Convicted of an offence under the Prevention of Corruption Act 1988 3 years
or the Indian Penal Code or any other law for time being in force, for
causing any loss of life or property or causing a threat to public health as
part of execution of a public procurement
4.2.13 In cases where Holiday Listing is proposed based on advice from the Administrative Ministry,
.no show cause or formal decision by competent authority will be required. The Nodal Department
will directly intimate the Agency that they have been placed in Holiday Listing by BPCL based on
the Ministry's advice
4.2.14 Provision for Appeal:
a) An agency aggrieved with the decision of the Competent Authority shall have the option of filing an
appeal against the decision of the Competent Authority within a maximum of 15 days from the date of
receipt of intimation of holiday listing.
b) Any appeal filed after expiry of the above period shall not be considered by the Appellate Authority;
c) On receipt of the Appeal from the Agency, the Appellate Authority, if it so desires, may call for
comments from the Competent Authority;
d) After receipt of the comments from the Competent Authority, the Appellate Authority, if it so desires,
may also give an opportunity for personal hearing, to the Appellant Agency;
e) After examining the facts of the case and documents available on record and considering the
submissions of the Appellant Agency, the Appellate Authority may pass appropriate order by which the
Appellate Authority may either:
i) Uphold the decision of Competent authority with or without any variation
/lesser period of Holiday Listing; OF
ii) Annul the order of the Competent Authority.
f) Appellate Authority shall pass its order within a maximum period of 45 days from the date of
receipt of Appeal.
g) Order of the Appellate Authority shall be communicated to the Agency by the Procurement
Department copy of which shall be given to the Competent Authority and also to the Nodal
Department as well.
h) No Appeal is permitted in case an Agency is placed in Holiday List by BPCL, based on Ministry's advice.
4.2.15 Effect of Holiday Listing
a) No enquiry / bid / tender shall be entertained with an Agency (including Allied Agency) as long
as the ’Agency' name appears in the Holiday list.
b) If an 'Agency' is put on the Holiday list during tendering:
i) If an 'Agency' is put on Holiday List after issue of the enquiry / bid /tender but before opening of the
un-priced bid, the un-priced bid of the 'Agency' shall not be opened and BG/EMD, if submitted by the
'Agency' shall be returned . If an 'Agency' is put on Holiday List after un-priced bid opening but before
price bid opening, the price bid of the 'Agency' shall not be opened and BG/EMD submitted by the 'Agency'
shall be returned.
ii) If an 'Agency' is put on Holiday List after opening of price bid but before finalization of the tender, the
offer of the 'Agency' shall be ignored and will not be further evaluated and the BG/EMD if any submitted
by the 'Agency' shall be returned. The 'Agency' will not be considered for issue of order even if the 'Agency'
is the lowest (L1). In such situation next lowest shall be considered as L1;
iii) In case, any debarred firms has submitted the bid, the same will be ignored. In case such firm is lowest
(L-1), next lowest firm shall be considered as L-1. Bid security
Submitted by such debarred firms shall be returned to them.
iv) If contract with the 'Agency' concerned is in operation, (including cases were contract has
already been awarded before decision of holiday listing) normally order for Holiday Listing from
business dealings cannot affect the contract, because contract is a legal document and unless the same is
terminated in terms of the contract, unilateral termination will amount to breach and will have civil
c) In cases where holiday listing proposal has been initiated by some procurement department in the
Corporation, but the process is yet to be completed and order of Competent Authority is awaited, the
tendering process may be taken forward till price bid opening and after price bid opening, decision on the
tender may be kept on hold till such time order of Competent Authority is issued.
5. Declaration by Bidders regarding Holiday Listing status:
Tenders invited for purchase of Goods and Services for both Open Tenders as well as Limited Tenders,
should have the provision that the bidder should submit a declaration to the effect that they are not
currently serving any Holiday Listing orders issued by BPCL or MOPNG debarring them from carrying on
business dealings with the BPCL/MOPNG. Offers not accompanied with a declaration should be
incorporated in rejection criteria. Any wrong declaration in this context shall make the Agency liable for
action under this Holiday Listing procedure.
Bidder should submit a declaration to the effect that he has not been convicted of an offence—
a) Under the Prevention of Corruption Act, 1988: or
b) The Indian Penal Code or any other law for the time being in force, for causing any loss of life or
property or causing a threat to public health as part of execution of a public procurement contract.
6. Revocation of Holiday Listing:
6.1 An order for Holiday Listing once passed fora certain specified period shall be revoked as under:
6.1.1 An order for Holiday Listing passed for a certain specified period shall be deemed to have been
automatically revoked on the expiry of that specified period and it will not be necessary to issue a specific
formal order of revocation., Any reduction in holiday listing period due to revision in the holiday listing
policy shall also be applicable to parties who are on the holiday list as on the date of revision. The
Procurement department shall suitably advise the change in holiday listing period to the respective
holiday listed vendor with a copy to nodal authority.
6.1.2 A Holiday Listing order may, on a review during its currency of operation, be revoked by the
competent authority if it is of the opinion that the disability already suffered is adequate in the
circumstances of the case, and the Agency has taken appropriate action to avoid recurrence.
7. Publishing of holiday listing information in BPCL Web-site:
7.1 Once an order of Holiday Listing of an Agency is passed by a Competent Authority, the said
information shall be published in the BPCL web-site, by the Nodal Department;
7.2 All Procurement Agencies, should before issue of tender in limited tender cases and before opening
of price bids in all cases, verify with this published information that the bidder concerned is not currently
serving any Holiday Listing orders issued by BPCL; suitable declarations to this effect shall be incorporated
in the concerned approval notes/TEC Note.
7.3 All orders of revocation of holiday listing shall, immediately on revocation, be made available to the
Nodal Department, who in turn shall update the information in the web-site accordingly.
7.4 To take cognizance of the holiday listing process in the initiation stage itself, the Nodal Department
should update the information in the BPCL web site, as soon as they get intimation from the
Procurement Group, along with copy of proposed show cause notice.
7.5 If any Communication is received from the Administrative Ministry (i.e. MOP&NG) advising banning
of business dealings with any Agency, the Nodal Department should take immediate action to circulate
the same to all Procurement Departments within the Corporation, update the website and also send
intimation to the concerned Agency.
Undertaking with respect to Compliance of Restrictions for Countries which share
land border with India – as stipulated by Govt. of India.
(On Company Letter Head, to be signed by the duly authorized person)
Bharat Petroleum Corporation Ltd
Dear Sir/Madam,
In line with the guidelines issued for compliance of Restrictions for Countries which share land border
withIndia – as issued by Govt. of India in Feb
I/We have read the clause regarding restrictions on procurements from a bidder of a country which
shares a land border with India and on sub-contracting to contractors from such countries.
a. I/We certify that this bidder is not from such a country or if from such a country has been
registered with the competent authority. I hereby certify that this bidder fulfills all
requirementsin this regard and is eligible to be considered*.
b. I/We certify that this bidder is not from such a country or if from such a country has been
registered with the competent authority and will not sub-contract any work to a contractor
fromsuch countries unless such contractor is registered with the competent authority. I hereby
certify that this bidder fulfills all requirements in this regard and is eligible to be
considered*.(Applicable for works involving possibility of sub-contracting)
c. (i) I/We have read the clause regarding restrictions on procurement from a bidder having
Transfer of Technology (ToT) arrangement. I certify that this bidder does not have any ToT
arrangement requiring registration with the competent authority*. Or
(ii) I/We have read the clause regarding restrictions on procurement from a bidder having
Transfer of Technology (ToT) arrangement. I certify that this bidder has valid registration to
participate in this procurement*.
I/We hereby certify that I/We fulfill all requirements in this regard and am/are eligible to be considered.
[*Where applicable, evidence of a valid registration by the Competent Authority shall be attached]
Name and Signature of the Authorized Signatory
GENERAL CONDITIONS OF CONTRACT (GCC)
BHARAT PETROLEUM CORPORATION LIMITED
I DEFINITION OF TERMS
II GENERAL INFORMATION ABOUT SITE
2.1 LOCATION OF SITE & ACCESSIBILITY
2.2 SCOPE OF WORK
2.3 LAND FOR CONTRACTOR’S FIELD, GODOWN AND
2.4 SAFETY STANDARDS FOR TEMPORARY BUILDINGS
III GENERAL INSTRUCTION FOR THE TENDERER
3 SUBMISSION OF TENDER
5 PURCHASE PREFERENCE
6a EARNEST MONEY
6b CONVERSION OF EMD TO SECURITY DEPOSIT
7a BID VALIDITY
7b LANGUAGE OF BID
8 ADDENDA / CORRIGENDA
9 RIGHT OF OWNER TO ACCEPT OR REJECT TENDER
10a INTEGRITY PACT (IP)
10b HOLIDAY LISTING
10c FOREIGN BIDDERS
11 COLLECTION OF DATA TENDERER’S RESPONSIBILITY & TIME SCHEDULE
12 RETIRED GOVERNMENT OR COMPANY OFFICER
13 SIGNING OF THE CONTRACT
14a FIELD MANAGEMENT
14b CONSULTANCY CONTRACTS
IV INTERPRETATION OF CONTRACT DOCUMENTS
15 INTERPRETATION OF CONTRACT DOCUMENT
16 SPECIAL CONDITIONS OF CONTRACT
17 CONTRACTOR TO OBTAIN HIS OWN INFORMATION
18 PERFORMANCE SECURITY DEPOSIT/RETENTION MONEY
19 TIME OF PERFORMANCE
20 FORCE MAJEURE
21 EXTENSION OF TIME
22 LIQUIDATED DAMAGES FOR DELAY
23 SUM PAYABLE BY WAY OF COMPENSATION TO BE CONSIDERED AS
REASONABLE COMPENSATION
WITHOUT REFERENCE TO ACTUAL LOSS
24 TERMINATION / OFFLOADING
25 FORFEITURE OF SECURITY DEPOSIT
26 ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED
27 CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION IF ACTION NOT
TAKEN UNDER CLAUSE
28 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK
29 CHANGES IN CONSTITUTION
30 IF THE CONTRACTOR DIES
31 EMPLOYEES OF THE OWNER NOT INDIVIDUALLY LIABLE
32 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS
33 CONTRACTOR’S OFFICE AT SITE
34 CONTRACTOR’S SUBORDINATE STAFF AND THEIR CONDUCTS
35 SUB-LETTING OF WORK
36 POWER OF ENTRY
37 CONTRACTOR’S RESPONSIBILITY WITH OTHER AGENCIES
38 OTHER AGENTS AT SITE
40 RIGHTS OF VARIOUS INTERESTS
41 RIGHT OF OWNER TO DETERMINE / TERMINATE CONTRACT
42 TERMINATION FOR CONVENIENCE
43 PATENTS AND ROYALTIES
45 OPERATION OF CONTRACT
V PERFORMANCE OF WORK
46 EXECUTION OF WORKS
47 COORDINATION AND INSPECTION OF WORK
48 WORK IN MONSOON AND DEWATERING
49 WORK ON SUNDAYS AND HOLIDAYS
50 GENERAL CONDITIONS FOR CONSTRUCTION AND ERECTION WORK
51 DRAWINGS TO BE SUPPLIED BY THE OWNER
52 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR
53 SETTING OUT WORKS
54 RESPONSIBILITY FOR LEVEL AND ALIGNMENT
55 MATERIALS TO BE SUPPLIED BY CONTRACTOR
56 MATERIALS SUPPLIED BY OWNER
57 CONDITIONS FOR ISSUE OF MATERIALS
58 MATERIALS PROCURED WITH ASSISTANCE OF OWNER
59 MATERIALS OBTAINED FROM DISMANTLING
60 ARTICLES OF VALUE FOUND
61 DISCREPANCIES BETWEEN INSTRUCTIONS
62 ALTERATIONS IN SPECIFICATIONS AND DESIGNS AND EXTRA WORK
63 VARIATION IN CONTRACT VALUE
64 ACTION WHERE NO SPECIFICATIONS ISSUED
65 ABNORMAL RATES
66 INSPECTION OF WORK
67 ASSISTANCE TO THE ENGINEERS
68 TESTS FOR QUALITY OF WORKS
70 ACTION AND COMPENSATION IN CASE OF BAD WORK
71 SUSPENSION OF WORKS
72 OWNER MAY DO PART OF WORK
73 POSSESSION PRIOR TO COMPLETION
74.1,2 PERIOD OF LIABILITY FROM THE DATE OF COMPLETION OF WORK
74.3 CARE OF WORKS
74.4 EFFECTS PRIOR TO TAKING OVER
VI BILLS / MEASUREMENT / PAYMENT
75 SCHEDULE OF RATES AND PAYMENTS
76 PROCEDURE FOR MEASUREMENT / BILLING OF WORK IN PROGRESS
77 LUMPSUMS IN TENDER
78 RUNNING ACCOUNT PAYMENTS TO BE REGARDED AS ADVANCES
80 PAYMENT OF CONTRACTOR’S BILL
81 CONCLUSION OF CONTRACT
82 MODE OF PAYMENT
82A BILL DISCOUNTING THROUGH TReDS
83 COMPLETION CERTIFICATE
84 FINAL DECISION AND FINAL CERTIFICATE
85 CERTIFICATE FOR PAYMENTS AND EVIDENCE OF COMPLETION
VII TAXES / DUTIES / INSURANCE
86 TAXES & DUTIES
88 DAMAGE TO PROPERTY
VIII LABOUR LAWS AND OTHER REGULATIONS
90 IMPLEMENTATION OF APPRENTICES ACT, 1961
91 CONTRACTOR TO INDEMNIFY THE OWNER
92a HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS
92b MEDICAL FITNESS CERTIFACATION
93 SAFETY REGULATIONS
94 DISPUTE RESOLUTION
95 JURISDICTION
96 ORDER OF PRECEDENCE FOR WORKS/SERVICES CONTRACTS
97 LIMITATION OF LIABILITY
98 POLICE VERIFICATION OF CONTRACT STAFF AND TRANSPORT CREW AT
100 BUILDING AND OTHER CONSTRUCTION WORKERS CESS
IX MEMORANDUM OF AGREEMENT
PROFORMA OF BANK GUARANTEE / INSURANCE SURETY BOND
TAX RESIDENCY CERTIFICATE
BHARAT PETROLEUM CORPORATION LTD ACKNOWLEDGEMENT
GENERAL CONDITIONS OF CONTRACT
DEFINITION OF TERMS
In the contract documents as herein defined where the context so admits, the following words and expressions will have following
1) “The Owner/Company/BPCL” means the Bharat Petroleum Corporation Limited, incorporated in India having its
registered office at 4 & 6, Currimbhoy Road, Ballard Estate, Mumbai - 400 038 or their successors or assigns
2) “The Contractor” means the person or the persons, firm or Company whose tender has been accepted by the Owner
and includes the Contractor’s legal representative, his successor and permitted assigns.
3) The “Managing Director” shall mean the Chairman and Managing Director of the Bharat Petroleum Corporation
Limited or his successor in office designated by the Owner.
4) The “Engineer-in-Charge” shall mean the person designated as such by the Owner and shall Include those who are
expressly authorised by the Owner to act for and on his behalf for operation of this contract.
5) The “Work” shall mean the works to be executed in accordance with the contract or part thereof as the case may be
and shall include extra, additional, altered or substituted works as required for purpose of the contract.
6) The “Permanent Work” means and includes works which will be incorporated in and form a part of the work to be
handed over to the Owner by the Contractor on completion of the contract.
7) The “Construction Equipment” means all appliances, Tools/Tackles and equipment of whatsoever nature for the use
in or for the execution, completion, operation or maintenance of the work unless intended to form part of the
Permanent work.
8) The “Site” means the areas on which the permanent works are to be executed or carried out and any other places
provided by the Owner for purpose of the contract.
9) The “Contract Document” means collectively the Tender Document. Designs. Drawings or Specifications, agreed
variations, if any, and such other document constituting the tender and acceptance thereof.
10) The “Consultant” means the consulting engineers Nominated/appointed by the Owner for this Project / job.
11) The “Sub-Contractor” means any person or firm or Company (other than the Contractor) to whom any part of the
work has been entrusted by the Contractor, with the written consent of the Engineer-in-Charge, and the legal personal
representatives, successors and permitted assigns of such person, firm or company.
12) The “Contract” shall mean the Agreement between the Owner and the Contractor for the execution of the works
including therein all contract documents.
13) The “Specification” shall mean the various technical specifications attached and referred to in the tender documents.
It shall also include the latest editions, including all addenda/corrigenda, of relevant Indian Standard Specification,
specifications of the other country published before entering into Contract.
14) The “Drawings” shall include maps, plans and tracings or prints thereof with any modifications approved in writing
by the Engineer-in-Charge and such other drawings as may, from time to time, furnished or approved in writing by
the Engineer-in-Charge.
15) The “Tender” means the tender submitted by the Contractor for acceptance by the Owner.
16) The “Alteration Order” means an order given in writing by the Engineer-in-Charge to effect additions to or deletion
from and alterations in the works.
17) The “Completion Certificate” shall mean the certificate to be issued by the Engineer-in-Charge to the contractor when
the works have been completed to his satisfaction.
18) The “Final Certificate” in relation to a work means the certificate issued by the Engineer-in-Charge after the period
of liability is over for releasing the retention money/ PBG /Insurance Surety Bond .
19) The “Period of Liability” in relation to a work means the specified period during which the Contractor stands
responsible for rectifying all defects that may appear in the works.
GENERAL INFORMATION ABOUT SITE
2.1 LOCATION OF SITE & ACCESSIBILITY:
The site location is described in the Special Conditions of Contract. The intending tenderer should inspect the site
and make himself familiar with site conditions and available facilities.
Entry into the BPCL areas is restricted depending on location/site. Only pass holders as also vehicles with special
permits are permitted in such restricted areas. Inside the premises access to various work spots is also further
regulated by permits issued for each area. Non-availability of access roads or permits for entry of vehicles/equipment
to any specific area shall in no case be the cause to condone any delay in execution of works or be the cause for any
claims or extra compensations.
2.2 SCOPE OF WORK
The scope of work is defined in the Special Conditions of Contract and specifications. The Contractor shall provide all
necessary materials, equipments / Tools and Tackles / Supervision / labour etc. for the execution and maintenance
of the work till completion unless otherwise mentioned in these tender documents. All materials that go with the
work shall be approved by Engineer-in-Charge prior to procurement and use.
2.3 LAND FOR CONTRACTOR’S FIELD, GODOWN AND WORKSHOP:
The tenderer should visit the site and acquaint himself with site conditions, availability of water, electricity, approach
roads, construction materials as per specifications, shelter for his staff, etc. since these are to be provided/arranged
by the tenderer (unless otherwise specified) at his cost.
The owner will, at his discretion and convenience based on availability for the duration of the execution of the work,
make available, land for construction of contractor’s field office, go-downs, workshop and fabrication yard required
for the execution of the contract. The contractor shall at his own cost construct all these temporary buildings and
provide suitable water supply and sanitary arrangement approved by the Engineer-in-Charge.
On completion of the works undertaken by the Contractor, he shall remove all temporary works/ shed erected by him
and have the site cleaned as directed by Engineer-in-Charge if the contractor shall fail to comply with these
requirements, the Engineer-in-charge may at the expenses of the Contractor remove such surplus and rubbish
material, dispose off the same as he deems fit and get the site cleared as aforesaid; and the contractor shall forthwith
pay the amount of all expenses so incurred and shall have no claim in respect of any such surplus materials disposed
off as aforesaid. But the Owner reserves the right to ask the Contractor any time during the pendency of the contract
to vacate the land by giving seven days notice on security reasons or on material interest otherwise.
2.4 SAFETY STANDARDS FOR TEMPORARYBUILDINGS
All temporary buildings, sheds, workshops, field stations etc. shall be constructed in conformation with the safety and
security regulations of the owner as regards location and type of structure.
GENERAL INSTRUCTION FOR THE TENDERER
3 SUBMISSION OF TENDER:
3.1 The quotation should be submitted only in the manner and the form prescribed in the Request For Quotation
(RFQ)/Tender enquiry.
3.2 Addenda/Corrigenda to this tender document if issued must be signed and submitted along with the tender document.
The tenderer should consider the Addenda/Corrigenda and should price the work based on revised quantities when
amendments for quantities are issued in addenda.
3.3 Tenders should always be placed in double sealed covers, superscribing Tender No Tender for
(name of job), Bharat Petroleum Corporation Limited, due for opening on
The full name, postal address and telegraphic address of the tenderer shall be written on the bottom left hand corner
of the sealed cover. (This will not be applicable in the case of e-tenders) Tenders received in open condition (priced
bid) are liable to be rejected.
3.4 Instructions for two part bidding
i) The bid should be submitted in two parts viz.
a. Techno-commercial bid.
ii) Techno-commercial bid shall have the following information/details
a. Technical deviation if any.
b. Commercial deviation if any like extra taxes, duties etc.
c. Copy of price bid with prices blanked off.
d. Any other relevant information.
iii) Price Bid shall have only prices as per schedule of Rates.
iv) Techno-commercial bid and price bid shall be enclosed in two separate envelopes with the subject job, type of
bid, bidders name super-scribed on top. Both these envelopes shall be sealed in a common envelope and submitted
as specified above and in covering letter. (This will not be applicable in the case of e-tenders)
4.1 The tenders, as submitted shall include all documents/details asked for by BPCL in the RFQ/Tender enquiry.
4.2 All pages to be initialed:
Wherever signed tender documents are submitted, all signatures in the documents shall be dated, as well as all the
pages of the documents shall be initialed at the lower right hand corner and signed wherever required in the tender
papers by the tenderer or by a person holding power of attorney authorizing him to sign on behalf of the tenderer
before submission of tender. Tenders without signatures as stated above are liable to be rejected.
4.3 Rates to be in Figures and Words:
The tenderer should quote the rates in English both in figures as well as in words. Offers received without the rates
in figures and in words are liable for rejection. In case of discrepancy exists between the rate quoted in figures and
in words, the rates quoted in words will prevail.
4.4 Corrections and Erasures:
All corrections and alteration in the entries of tender papers will be signed in full by the tenderer with date. No
erasures or over-writings are permissible.
In case of priced bids containing overwriting/cuttings/erasures in the quoted rates and in case these are not
attested by the signatory of the bid, such priced bids are liable to be rejected without giving any further notice.
4.5 Signature of Tenderer:
The tender shall contain the name, residence and place of business of person or persons making the tender and shall
be signed by the tenderer with his usual signature with company stamp. Partnership firms shall furnish the full names
of all partners in the tender. It should be signed in the partnership name by all the partners or by duly authorized
representative followed by the name and designation of the person signing with company stamp.
Tender by Company or Corporation registered under the relevant companies act, shall be signed by the authorized
representative and a power of attorney in that behalf shall accompany the tender.Transfer of tender documents
issued to one intending tenderer to another is not permissible.
5 PURCHASE PREFERENCE:
Owner reserves its right to allow Public Sector Enterprises (Central/State), purchase preference as admissible/applicable
from time to time under the existing Govt. policy. Purchase preference to a PSE shall be decided based on the price
quoted by PSE as compared to L1 Vendor at the time of evaluation of the price bid.
Owner reserves its right to allow Micro and Small Enterprises (MSEs), MSEs owned by Women Entrepreneurs and
MSEs owned by Scheduled Caste (SC) or the Scheduled tribe (ST) entrepreneurs, purchase preference as
admissible/applicable from time to time under the existing Govt. policy. Purchase preference to a MSE, a MSE owned
by women entrepreneurs and a MSE owned by SC/ST entrepreneurs shall be decided based on the price quoted by
the said MSEs as compared to L1 Vendor at the time of evaluation of the price bid.
6 (a) EARNEST MONEY:
The tenderer must submit/ deposit earnest money, if specified in the RFQ/Tender enquiry, failing which the tender is
liable to be rejected. Earnest Money Deposit shall be submitted in the form of crossed Demand Draft in favour of “Bharat
Petroleum Corporation Ltd.” / Electronic Funds Transfer to BPCL Bank Account / Bank Guarantee executed by any
Scheduled Bank approved by Reserve Bank of India (as per Proforma provided in Annexure) / Insurance Surety Bond (as
per Proforma provided in Annexure). Earnest Money Deposit (EMD) shall be valid for a period of 6 (Six) months from the
due date of opening of Techno-commercial Bids and shall be submitted from any Indian Scheduled Commercial Bank /
Indian Branch of Foreign Bank. EMD submitted by foreign vendors shall be in USD / EURO only.
In case of limited tender, Earnest Money deposit (EMD) is not applicable for registered contractors of BPCL.
NOTE : Exemption of Bidding Document fee and EMD will be applicable for Micro and Small Enterprises (MSEs) registered
with District Industries Centres (DIC) or Khadi and Village Industries Commission or Khadi and Village Industries Board
or Coir Board or National Small Industries Corporation (NSIC) or Directorate of Handicraft and Handloom or MSEs having
Udyog Aadhaar Memorandum or any other body specified by Ministry of Micro, Small and Medium Enterprises. Such
bidder shall submit Self attested copy of the certificate, valid upto validity of the offer, indicating that their registration
includes the items/works under tender. The registration certificate should remain valid during the period of the contract
that may be entered into such successful bidder. Such tenderers should ensure validity of the Registration Certificate for
NOTE: No interest shall be paid by the Owner on the earnest money deposit by the tenderer. The earnest money of the
unsuccessful tenderer will be refunded after the completion of BQC evaluation / Technical Evaluation / Priced Bid
Evaluation as applicable.
(b) CONVERSION OF EMD TO SECURITY DEPOSIT:
The earnest money deposit (EMD) of the contractor whose tender may be accepted, if paid in forms other than Bank
Guarantee / Insurance Surety Bond, can be converted to security deposit for due performance of the contract if the
contractor so desires. The “performance security deposit/retention money” vide clause 18 shall also be applicable limiting
to a maximum of 10% of the contract value.
7 (a) BID VALIDITY:
Tender submitted by tenderers shall remain valid for acceptance for a period of four months from the date of opening
of the tender (Technical Bid in the case of two bid). The tenderer shall not be entitled during the said period of four
months, without the consent in writing of the Owner, to revoke, or cancel his tender or vary the tender given or any
term thereof. In case of tenderer revoking or canceling his tender, varying any terms in regard thereof without the
consent of Owner in writing, appropriate penal action will be taken by BPCL as deemed fit including putting the
tenderer/contractor on ‘Holiday listing’/’Delisting’ barring the tenderer/contractor from participating in future tenders
for an appropriate period from the date of revocation/cancellation/varying the terms. Further in the case of contractors
who are not registered with BPCL, the earnest money deposited by him will be forfeited. Once the quotation is
accepted the rates quoted shall be firm till the entire work is completed.
(b) LANGUAGE OF BID:
The Bid, all correspondence and documents relating to the bid, between Bidder and BPCL, shall be written in English
language only. Any supporting document furnished by Bidder may be written in other language provided that this
literature is accompanied by an authenticated English translation in which case, for purpose of interpretation of the Bid,
the English translation shall govern.
8 ADDENDA / CORRIGENDA:
Addenda/ Corrigenda to the tender documents may be issued prior to the date of opening of the tenders to clarify
documents or to effect modification in the design or tender terms. All addenda/corrigenda issued shall become part
of tender Document.
9 RIGHT OF OWNER TO ACCEPT OR REJECT TENDER:
9.1 The right to accept the tender will rest with the Owner. The Owner, however, does not bind itself to accept the lowest
tender, and reserves to itself the authority to reject any or all the tenders received without assigning any reason
9.2 The whole work may be split up between two or more contractors or accepted in part and not entirely if considered
9.3 Tenders in which any of the particulars and prescribed informations are missing or are incomplete in any respect
and/or the prescribed conditions are not fulfilled are liable to be rejected.
9.4 Canvassing in connection with tenders is strictly prohibited and tenders submitted by the tenderer who resort to
canvassing will be liable to rejection.
9.5 Tender containing uncalled remarks or any additional conditions are liable to be rejected.
10 (a) INTEGRITY PACT (IP):
Vendors are requested to sign & return our pre-signed IP document, if applicable. This document is essential &
binding. Vendor's failure to return the IP document duly signed along with Bid Document may result in the bid not
being considered for further evaluation.
(b) HOLIDAY LISTING:
The vendors / contractors are expected to adopt the ethics of highest standards and a very high degree of integrity,
safety and quality consciousness, commitment and sincerity towards the work undertaken and dealing with BPCL in
such matters. Also, while participating in the tender and performing the contracts, Contractors are required to meet
certain performance criteria and adherence to the terms and conditions of the tender / contract. BPCL shall have the
right to remove from the list of approved suppliers / contractors or to ban business dealings, if any agency has been
found to have committed misconduct or fraud or poor performance or anything unethical not expected
from a reputed agency. The guidelines and procedures for Holiday Listing as adopted by BPCL and available separately
in BPCL website shall be applicable in the context of all tenders floated and consequently, all Orders / Contracts /
Purchase Orders placed, by BPCL. It can be accessed using the following link:
https://www.bharatpetroleum.in/pdf/Holiday-Listing-Policy-2024.pdf
(c) FOREIGN BIDDERS:
It is mandatory for the foreign bidder to furnish the documents for the compliance to requirement of PAN No. , Tax
Residency Certificate and Form No.10F (applicable for foreign bidder in case of services in India is required as per scope
of bidding document) as per Income Tax Act in case his receipts are subject to tax deduction at source in India:
PAN as per the Indian Income Tax requirements shall be submitted, failing which the Supplier/Contractor/Consultant
shall be responsible for any additional tax deduction at source as per the provisions of the Indian Income Tax Act/Rules
and the same shall be deducted from the payment made to supplier/contractor/consultant.
(ii) Tax Residency Certificate (TRC)
TRC containing prescribed particulars as per the Annexure from the Government of foreign country in order to claim
the benefits of DTAA as per the Indian Income Tax requirements shall be submitted, failing which the relief under DTAA
will not be available and consequently the actual rate of withholding tax will be applicable and deducted from the
payment made to supplier/contractor/consultant (i.e., non-resident taxpayer). The TRC shall be duly verified by the
Government of the country of which the assessee claims to be a resident for the purposes of tax.
In additional to TRC, in order to claim the benefits of DTAA, bidder shall also submit additional information in form no.
10F as per Annexure. Form 10F has to be signed & verified by the assessee himself.
The above shall be furnished before release of any payment or within one month of the release of Order, whichever is
earlier. In case of failure to submit the above information, any additional tax liability on Owner, will be deducted from
the payment due to the contractor.
11 COLLECTION OF DATA TENDERER’S RESPONSIBILITY & TIME SCHEDULE:
The tenderer shall visit the site and acquaint himself fully of the site and no claims whatsoever will be entertained on
the plea of ignorance or difficulties involved in execution of work or carriage of materials.
The time period allowed for carrying out the job shall be as shown in tender document. Request for revision for time
schedule after tenders are opened will not be received for consideration.
12 RETIRED GOVERNMENTS OR COMPANYOFFICER:
No Engineer of Gazetted rank or other Gazetted Officer, employed in Engineering or Administrative duties in an
Engineering Department of the States/Central Government or of the Owner is allowed to work as a Contractor for a
period of two years after his retirement from Government service or from the employment of the Owner without the
previous permission of the Owner. The contract, if awarded, is liable to be cancelled if either the contractor or any of
his employees is found at any time to be such a person, who had not obtained the permission of the State/ Central
Government, or of the Owner as aforesaid before submission of tender, or engagement in the Contractor’s service as
the case may be.
13 SIGNING OF THE CONTRACT:
The successful tenderer shall be required to execute an agreement in the proforma attached with tender enquiry
within a period of one month of the receipt by him of the notification of acceptance of tender. The payment will not
be processed till the time the agreement is executed.
14 (a) FIELD MANAGEMENT:
The field management will be the responsibility of the Engineer-in-Charge, who will be nominated by the Owner. The
Engineer-in-Charge may also authorize his representatives to perform his duties and functions.
Coordination of Work - The Engineer-in-Charge shall coordinate the work of various agencies engaged at site to
ensure minimum disruption of work carried out by different agencies. It shall be the responsibility of the contractor
to plan and execute strictly in accordance with the site instructions to avoid hindrance to the works being executed
by other agencies.
14 (b) CONSULTANCY CONTRACTS:
This General Conditions of Contract (GCC) will be binding for Consultancy jobs only to the extent of its applicability
to the context of consultancy jobs.
INTERPRETATION OF CONTRACT DOCUMENTS
15 INTERPRETATION OF CONTRACT DOCUMENT:
15.1 Except if and to the extent otherwise provided by the Contract, the provisions of the General Conditions of Contract
and special conditions shall prevail over those of any other documents forming part of the contract. Several documents
forming the contract are to be taken as mutually explanatory. Should there be any discrepancy, inconsistency, error
or omission in the contract or any of the matter may be referred to Engineer-in-Charge, who shall give his decisions
and issue to the Contractor instructions directing in what manner the work is to be carried out. The decision of the
Engineer-in-Charge shall be final and conclusive and the contractor shall carry out work in accordance with this
15.2 Works shown upon the drawing but not mentioned in the specifications or described in the specification without being
shown on the drawings shall nevertheless be held to be included in the same manner as if they had been specifically
shown upon the drawings and described in the specifications.
15.3 Headings and marginal notes to the clauses of these General Conditions of Contract or to specifications or to any
other tender document are solely for the purpose of giving a concise indication and not a summary of the content
thereof, and they shall never be deemed to be part thereof or be used in the interpretation or construction thereof
of the Contract.
16.4 Singular and Plural:
In these contract documents unless otherwise stated specifically, the singular shall include the plural and vice-versa
wherever the context so requires. Words indicating persons shall include relevant incorporated companies/ registered
as associations/ body of individual/ firm or partnership.
16 SPECIAL CONDITIONS OF CONTRACT:
16.1 Special Conditions of contract shall be read in conjunction with the General Conditions of Contracts, specification of
work, Drawings and any other documents forming part of this contract wherever the context so requires.
16.2 Notwithstanding the sub-division of the documents into these separate sections and volumes every part of each shall
be deemed to be supplementary to and complementary of every other part and shall be read with and into the
contract so far as it may be practicable to do so.
16.3 Where any portion of the General Conditions of Contract is repugnant to or at variance with any provisions of the
Special Conditions of Contract then, unless a different intention appears the provisions of the Special Conditions of
Contract shall be deemed to over-ride the provision of the General Conditions of Contract and shall to the extent of
such repugnance or variations, prevail.
16.4 Wherever it is mentioned in the specifications that the Contractor shall perform certain work or provide certain
facilities, it is understood that the contractor shall do so at his own cost.
16.5 The materials, designs and workmanship shall satisfy the relevant Indian Standards, the Job specifications contained
herein and codes referred to. Where the job specifications stipulate requirements in addition to those contained in
the standard codes and specifications, these additional requirements shall also be satisfied.
17 CONTRACTOR TO OBTAIN HIS OWN INFORMATION:
The contractor in fixing rate shall for all purposes whatsoever be deemed to have him self independently obtained all
necessary information for the purpose of preparing his tender. The contractor shall be deemed to have examined the
Contract Documents, to have generally obtained his own information in all matters whatsoever that might affect the
carrying out the works at the scheduled rates and to have satisfied himself to the sufficiency to his tender. Any error
description of quantity or omission there from shall not vitiate the contract or release the Contractor from executing
the work comprised in the contract according to drawing and specifications at the scheduled rates. He is deemed to
have known the scope, nature and magnitude of the works and the requirements of materials and labour involved etc.
and as to what all works he has to complete in accordance with the contract documents whatever be the defects,
omissions or errors that may be found in the Contract Documents. The Contractor shall be deemed to have visited
surrounding to have satisfied himself to the nature of all existing structures, if any, and also as to the nature and the
conditions of the Railways, roads, bridges and culverts means of transport and communications, whether by land,
water or air, and as to possible interruptions thereto and the access to and regress from the site, to have made
enquiries, examined and satisfied himself as to the sites for obtaining sand, stones, bricks and other materials, the
sites for disposal of surplus materials the available accommodation as to whatever required, depots and such other
building as may be necessary for executing and completing the works, to have made local independent enquiries as to
the sub-soil water and variations thereof, storms, prevailing winds, climate conditions and all other similar matters
affecting these works. He is deemed to have acquainted himself as to his liability for payment of Government taxes,
customs duty and other charges.
Any neglect or failure on the part of the Contractor in obtaining necessary and reliable information upon the foregoing
or any other matters affecting the contract shall not relieve him from any risk or liabilities or the entire responsibility
from completion of the works at the scheduled rates and time in strict accordance with the contract documents.
No verbal agreement or inference from conversation with any officer or employee of the owner either before or after
the execution of the contract agreement shall in any way affect or modify any of the terms or obligations herein
18 PERFORMANCE SECURITY DEPOSIT/RETENTION MONEY:
18.1 To ensure performance of the contract and due discharge of the contractual obligations, the successful contractor
will have to provide security deposit of 10% of the basic value of contract unless otherwise specified in the Special
Conditions of Contract. Amount received/retained towards this clause will be considered as security deposit.
This Security deposit may be furnished in the form of an Account payee Demand Draft payable to BPCL or Bank
Guarantee / Insurance Surety Bond in the prescribed format. The contractor shall have the option to adjust any Earnest
Money Deposit- (EMD) if paid by demand draft towards security deposit if he so desires or otherwise if submitted by
way of bank guarantee / Insurance Surety Bond the validity of the same to be extended suitably as advised by BPCL.
In the case of security deposit submitted in the form of Bank guarantee / Insurance Surety Bond, the Bank Guarantee
/ Insurance Surety Bond shall be valid and remain in force till the contractual completion period (expiry of the defect
liability period- refer clause-74, if applicable) and with a claim period of six months thereafter. The Bank Guarantee /
Insurance Surety Bond shall be in the form prescribed.
In case the successful contractor is not furnishing the performance security deposit as referred above on award of
the job, the same shall be deducted from each running account bills at the rate of 10% of bill value till overall security
deposit of 10% as mentioned above is collected.
The security deposit will be retained till the successful completion of the work and thereafter till the expiry of the
defect liability period (refer clause-74), if applicable. This retention money / Bank guarantee / Insurance Surety Bond
held shall be released after the expiry of the defect liability period provided that any defects appearing during that
period are corrected by the contractor and subject to Clause 18.2 below.
In the case of value/rate/quantity contracts, the security deposit shall be based on individual release orders issued. In
case of LSTK (Lump Sum Turnkey Contracts) / EPC: PBG / Insurance Surety Bond @ 10% within 15 days of notification
of award. In case of Annual Rate Contracts (ARCs): Submission of PBG / Insurance Surety Bond @ 10% of Total Contract
Value (TCV) or submission of initial security deposit @ 2.5% of TCV within 15 days of notification of award. In cases
where only 2.5% of TCV has been submitted, 7.5% of individual release order shall be subsequently deducted from RA
Vendors/contractors shall be asked to submit the SD within 15 days from the date of notification of award and in the
event of delay in submission of SD, the contract can be terminated. However, if termination of contract is not in the
interest of the work/ BPCL, an additional time up to 30 days can be allowed for submission of SD depending on merits
of each case, beyond which the contract may be terminated with subsequent actions following termination as per
tender/procedure.
18.2 If the contractor/ sub-contractor or their employees shall break, deface or destroy any property belonging to the
Owner or other agency during the execution of the contract, the same shall be made good by the Contractor at his
own expenses and in default thereof, the Engineer-in-Charge may cause the same to be made good by other agencies
and recover expenses from the contractor (for which the certificate of the Engineer-in-Charge shall be final). These
expenses can be recovered from the security deposit/retention money if recovery from other sources is not possible.
18.3 All compensation or other sums of money payable by the contractor to the Owner under terms of this contract may
be deducted from his security deposit/retention money or from any sums which may be or may become due to the
contractor by the Owner on any account whatsoever and in the event of his security deposit/retention money being
reduced by reasons of any such deductions. The contractor shall within ten days thereafter make good any sum or
sums, which may have been deducted from his security Deposit/retention money. No interest shall be payable by the
Owner from sum deposited as security deposit/retention money.
18.4 The security deposit shall be held by the Owner, as security for the due performance of the Contractor’s obligations
under the contract, provided that nothing herein stated shall make it incumbent upon the Owner to utilize the security
deposit/retention money in preference to any other remedy which the Owner may have, nor shall be construed as
confining the claims of the Owner against the contractor to the quantum of the Security Deposit/retention money.
18.5 The Bank guarantee if submitted shall be from any Indian scheduled bank or an international bank of repute having
a branch in India or a corresponding banking relationship with an Indian scheduled bank. The security
deposit/retention money shall be in Indian Rupee in the case of domestic bidders and in US Dollars/EUROS in the
case of foreign bidders. In case of Insurance Surety Bond, the same shall be from the Insurance company as approved
by Insurance Regulatory and Development Authority of India (IRDAI).
18.6 Process for submitting Bank Guarantee / PBG under SFMS (Structured Financial Messaging System) mode as follows:
Vendors shall insist their Bank for issuance of SFMS Bank Guarantee for faster payments. Vendors shall provide BPCL's
Bank Account No. & IFSC Code (Details given below) to their Bank as beneficiary at the time of application for Bank
Guarantee in favor of BPCL. Issuing Bank shall issue the Bank Guarantee & send SFMS message to BPCL's Bank confirming
the authenticity of Bank Guarantee who in turn shall send the confirmation to BPCL.
Vendor should ensure the following for issue of E- bank guarantee:
a. The issuing bank is on SFMS platform
b. SFMS Message type used is 760 COV and SFMS Delivery report/ Message copy is sent along with original BG
c. For BG amendment, message type 767COV is to be used.
d. SFMS contains following details:
i. Beneficiary's bank name: ICICI Bank
ii. IFSC Code: ICIC0000393
iii BPCL'S Customer 1D: 8PCL583493800
e. BG Issuing Bank should send the BG Issuance advice through SFMS to BPCL's designated Banker: ICICI Bank, Backbay
Branch, Mumbai (IFSC: 1CIC0000393).
f. BG Issuance advice should mention applicable Unique Identifier Code (U1C) in row/ field number 7037 of SFMS Delivery
a. BPCL Location : Kharghar , Navi Mumbai
b. Head office : Ballard Estate
c. UIC : BPCL583493800
g. The Original BG should be submitted along with print out of SFMS Delivery report from the BG Issuing Bank Branch.
h. SFMS BG will help in faster verification of BGs and prompt release of payments to Vendors.
19 TIME OF PERFORMANCE:
19.1 The work covered by this contract shall be commenced as detailed in the purchase order or as per the instructions of
the Engineer in charge and be completed in stages on or before the dates as mentioned in the time schedule of
completion of work. The contractor should bear in mind that time is the essence of this agreement unless such time
be extended pursuant to the provision of clause No. 21. Request for revision of Completion time after tenders are
opened will not receive consideration.
19.2 Time Schedule of Completion: The general time schedule of completion is given in the tender document. Contractor
should prepare a detailed monthly and weekly execution programme, jointly with the Engineer-in-Charge within two
weeks of receipt of Letter of Intent or acceptance of tender. The work shall be executed strictly as per the time
schedule given in this document. The period of completion given includes the time required for testing, rectifications,
if any, retesting and completion in all respects to the entire satisfaction of the Engineer-in-Charge.
20 FORCE MAJEURE
Circumstances leading to force majeure
(a) Act of terrorism;
(b) Riot, war, invasion, act of foreign enemies, hostilities (whether war be declared or not), civil war, rebellion, revolution,
insurrection of military or usurped power;
(c) Ionising radiation or contamination, radio activity from any nuclear fuel or from any nuclear waste from the
combustion of nuclear fuel, radioactive toxic explosive or other hazardous properties of any explosive assembly or nuclear
(d) epidemics, earthquakes, flood, fire, hurricanes, typhoons or other physical natural disaster, but excluding weather
conditions regardless of severity; and
(e) freight embargoes, strikes at national or state-wide level or industrial disputes at a national or state-wide level in any
country where Works are performed, and which affect an essential portion of the Works but excluding any industrial
dispute which is specific to the performance of the Works or the Contract.
For the avoidance of doubt, inclement weather, third party breach, delay in supply of materials (other than due to a
nationwide transporters’ strike) or commercial hardship shall not constitute a Force Majeure event.
• Notification of Force Majeure
Contractor shall notify within [10(ten)] days of becoming aware of or the date it ought to have become aware of the
occurrence of an event of Force Majeure giving full particulars of the event of Force Majeure and the reasons for the
event of Force Majeure preventing the Affected Party from, or delaying the Affected Party in performing its obligations
under the Contract.
• Right of either party to terminate
If an event of Force Majeure occurs and its effect continues for a period of 180 (one hundred eighty days) or more in a
continuous period of 365 (three hundred sixty five) days after notice has been given under this clause, either Party may
terminate the Contract by issuing a written notice of 30 (thirty) days to the other Party.
• Payment in case of termination due to Force Majeure
The Contract Price attributable to the Works performed as at the date of the commencement of the relevant event of
The Contractor has no entitlement and Owner has no liability for:
a) Any costs, losses, expenses, damages or the payment of any part of the Contract Price during an event of Force
b) Any delay costs in any way incurred by the Contractor due to an event of Force
Majeure. Time extension for such cases will be worked out appropriately.
21 EXTENSION OF TIME:
If the contractor shall desire an extension of the time for completion of the work on the grounds of his having been
unavoidably hindered in its execution or on any other grounds, he shall apply in writing to the Engineer-in-Charge
within two weeks of the date of hindrance on account of which he desires such extension as aforesaid, and the
Engineer-in-Charge shall if in his opinion (which shall be final), reasonable grounds have been shown thereof,
authorize such extension of time as may in his opinion be necessary or proper.
In the event of extension of Time of the contract, if granted, the contractor shall be required to suitably extend the
period of Bank Guarantee / Insurance Surety Bond if submitted, towards security Deposit/retention money suitably.
22. LIQUIDATED DAMAGES FOR DELAY:
22.1 Time is the essence of the contract. In case the contractor fails to complete the whole work within the stipulated
period, he shall be liable to pay liquidated damages of 0.5% of the basic value of contract per week and or part
thereof of the delay subject to a maximum of 5% of the value of the contract. The parties agree that this is a genuine
pre- estimate of the loss/damage which will be suffered by the owner on account of delay on the part of the contractor
and the said amount will be payable on demand without there being any proof of the actual loss or damages having
been caused by such delay/breach. The owner shall be at liberty to adjust or deduct the said amount of liquidated
damages from any amount due to the contractor including Security Deposit. In case where the concluded contract
value is different from the original contract value due to the change orders/variation in executed quantities/extension
of time, etc., the concluded contract value should be considered for recovery of Liquidated Damages for late
delivery/delayed completion.
22.2 The owner shall be at liberty to deduct or retain from any amount payable to the contractor periodically, the
proportionate or full amount of liquidated damages as the case may be for the delay periodically caused by the
23 SUM PAYABLE BY WAY OF COMPENSATION TO BE CONSIDERED AS REASONABLE COMPENSATION
WITHOUT REFERENCETO ACTUAL LOSS:
All sums payable by way of compensation under any of the conditions shall be considered as reasonable compensation
without reference to the actual loss or damage, which shall have been sustained by the Owner.
24 TERMINATION/OFFLOADING:
24.1 The contractor fully understands that timely completion of the work as per the schedule is of paramount necessity as
otherwise it would lead to adversely affecting the schedules of other works/project with resultant financial and other
losses to the Company/owner. In view of this, the contractor unconditionally agrees and binds himself to be liable for
all the consequences for non-completion of the work within the stipulated time.
24.2 In case a situation is brought about by the contractor warranting termination/off-loading of the whole or any part of
the work for any reason whatsoever, the Company/owner shall have the liberty and right to entrust/engage/award
the work so terminated/off loaded at the risk and cost of the contractor to any other agency/contractor by adopting
any mode of inviting tenders, i.e. open/limited/single party/negotiation basis etc. in order to ensure completion of
the work as per the schedule or at the quickest possible time.
25. FORFEITURE OF SECURITYDEPOSIT:
Whenever any claim against the Contractor for the payment of a sum of money arises out of or under the contract,
the Owner shall be entitled to recover such sum by appropriating in part or whole, security deposit of the contractor,
forming whole or part of such security being insufficient or if no security has been taken from the Contractor then
the balance or the total sum recoverable, as the case may be, shall be deducted from any sum then due or which at
any time thereafter may become due to the Contractor. The contractor shall pay to the owner on demand any balance
26 ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which, under any clause or clauses of this contract, the contractor shall have forfeited the whole of his
security deposit (whether paid in one sum or deducted by installment) or have committed a breach of any of the
terms contained in this contract, the owner shall have power to adopt any of the following courses as he may deem
best suited to his interest:
a) To rescind the contract (of which rescission notice in writing to the contractor under the hand of the owner
shall be conclusive evidence) in which case the security deposit of the contractor shall stand forfeited and
be absolutely at the disposal of the Owner.
b) To employ labour paid by the owner and to supply materials to carry out the work any part of the work,
debiting contractor with the labour cost of tools and plants and equipment charges, the cost of the materials
for which a certificate of the Engineer-in-Charge shall be final and conclusive against the Contractor and
10% of costs as above to cover all departmental charges and crediting him with the value of the work done
in all respects in the manner and at the same rates as if it had been carried out by the Contractor under
the term of his contract. The certificate of Engineer-in-Charge as to the value of the work done shall be
final and conclusive against the contractor.
c) To measure up the work of the contractor and to take such part thereof as shall be unexecuted out of his
hand to give it to another contractor to complete in which case any expenses which may be incurred in
excess of the sum which would have been paid to the original contractor, if the whole work had been
executed by him (of the amount of which excess, the certificate in writing of the Engineer-in-Charge shall
be final and conclusive) shall be borne and paid by the original contractor and may be deducted from any
money due to him by the Owner under the contract or otherwise or from his security deposit or from the
proceeds of sale thereof, of a sufficient part thereof.
In the event of any of the above course being adopted by the Owner, the contractor shall have no claim to
compensation for any loss sustained by him by reason of his having purchased or procured any materials
or entered into any agreements or made any advances on account of or with a view to the execution of
the work of the performance of the contract. In case the Contractor shall not be entitled to recover or be
paid any sum for any work actually performed under this contract unless the Engineer-in- Charge will certify
in writing the performance of such work and the value payable in respect thereof and he shall only be
entitled to be paid the value so certified.
27 CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION IF ACTION NOT TAKEN UNDER CLAUSE
In any case in which any of the powers conferred upon the owner by clause 26 thereof shall have become exercisable
and the same had not been exercised, the non exercise thereof shall not constitute a waiver of any of the conditions
hereof and such powers shall notwithstanding be exercised in the event of any further case of default by the contractor
for which any clause of hereof he is declared liable to pay compensation amounting to the whole of his security
deposit and the liability of the contractor for past and future compensation shall remain unaffected. In the event of
the Owner putting in force the power under sub-clause (a), (b) or (c) vested in him under the proceeding clause he
may, if he so desires takes possession of all or any tools and plants materials and stores in or upon the works or the
site thereof belonging to the contractor or procured by him and intended to be used for the execution of the work or
any part thereof paying or allowing for the same in account at the contract rates or in case of these not being
applicable at current market rates to be certified by the Engineer-in-Charge whose certificate thereof shall be final
otherwise the Engineer-in-Charge may give notice in writing to the contractor or his clerk of the works, supervisor or
other authorized agent, requiring him to remove such tools, plant, materials or stores from the premises (within a
time to be specified in such notice) and in the event of the contractor failing to comply with any such requisition, the
Engineer-in-Charge may remove them at the contractors expense or sell them by auction or private sale on account
of the contractor and at his risk in, all respects without any further notice as to the date, time or place of sale and
the certificate of the Engineer-in-Charge as to the expense of any such removal and the amount of proceeds and any
expenses of any such sale shall be final and conclusive against the contractor.
28 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK:
If at any time from the commencement of the work the owner shall for any reasons whatsoever, not require the
whole or part thereof as specified in the tender to be carried out, the Engineer-in-Charge shall give notice in writing
of the fact to the contractor, who shall have no claim to any payment or compensation whatsoever on account of any
profit or advantage which he might have derived from the execution of the work in full, but which he did not derive
in consequence of the full amount of the work not having been carried out, neither shall he have any claim for
compensation by reason of any alterations having been made in the original specifications, drawings, designs and
instructions which shall involve any curtailment of the work as originally contemplated.
29 CHANGES IN CONSTITUTION:
Where the contractor is a partnership firm, the prior approval, in writing, of the Owner shall be obtained before any
change is made in the constitution of the firm, where the contractor is an individual or a Hindu undivided family
business concern, such approval as aforesaid shall likewise be obtained before sub-contractor enters into any
agreement with other parties, where under the reconstituted firm would have the right to carryout the work hereby
undertaken by the contractor. In either case if prior approval as aforesaid is not obtained, the contract shall be
deemed to have been allotted in contravention of clauses 35 hereof and the same action may be taken and, the same
consequence shall ensure as provided in the said clause.
30 IF THE CONTRACTOR DIES
Without prejudice to any of the rights or remedies under his contract, if the contractor dies, the Owner shall have
the option of terminating the contract without compensation to the contractor.
31 EMPLOYEES OF THE OWNER NOT INDIVIDUALLY LIABLE:
No director or official or employee of the Owner shall in any way be personally bound or liable for the acts or
obligations of the Owner under the contract or answerable for any default or omission in the observance or
performance of any of the acts, matters or things which are herein contained.
32 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS:
The contractor shall not be entitled to any increase on the item rates of the contract or any other right or claim
whatsoever by reason of representation, explanation or statement or alleged representation, promise or guarantees
given or alleged to have been given to him by any person.
33 CONTRACTOR’S OFFICE AT SITE:
The contractor shall provide and maintain an office at the site, if space provided by the owner, for the accommodation
of his agent and staff and such office shall be open at all reasonable hours to receive instruction, notices, or other
communications.
34 CONTRACTOR’S SUBORDINATE STAFF AND THEIR CONDUCTS:
34.1 The contractor, on or after award of the work shall name and depute a qualified personnel having sufficient
experience in carrying out work of similar nature to whom the equipments materials, if any, shall be issued
and instructions for works given. The contractor shall also provide to the satisfaction of the Engineer-in-
Charge sufficient and qualified staff to supervise the execution of the-works, competent sub-agents,
supervisor and leading hands including those specially qualified by previous experience to supervise the
type of works comprised in the contract in such manner as will ensure work of the best quality, expeditious
working. Whenever in the opinion of the Engineer-in-Charge, additional properly qualified supervision staff
is considered necessary, they shall be employed by the contractor without additional charges on account
thereof. The Contractor shall ensure to the satisfaction of the Engineer-in- Charge that sub-contractors, if
any shall provide competent and efficient supervision over the work entrusted to them.
34.2 If and whenever any of the Contractor’s or sub-contractor’s agents, sub-agents, assistants supervisor or
other employees shall in the opinion of Engineer-in-Charge be guilty of any misconduct or be incompetent
or insufficiently qualified or negligent in the performance of their duties or that in the opinion of the owner
or Engineer-in-Charge, it is undesirable for administrative or any other reason for such person or persons
to be employed in the works, the contractor, if so directed by the Engineer-in- Charge, shall at once remove
such person or persons from employment thereon. Any person or persons so removed from the works shall
not again be employed in connection with the works without the written permission of the Engineer-in-
Charge. Any person so removed from the works shall be immediately replaced at the expense of the
contractor by a qualified and competent substitute. Should the contractor be requested to repatriate any
person removed from the works he shall do so and shall bear all costs in connection herewith.
34.3 The contractor shall be responsible for the proper behaviour of all the staff, supervisor, workmen and others
and shall exercise a proper degree of control over them and in particular, and without prejudice to the said
generality, the contractor shall be bound to prohibit and prevent any employees from trespassing or acting
in any way detrimental or prejudicial to the interest of the community or of the properties or occupiers of
land and properties in the neighborhood and in the event of such employee so trespassing, the contractor
shall be responsible therefore and relieve the Owner of all consequent claims or actions for damages or
injury or any other grounds whatsoever. The decision of the Engineer-in-Charge upon any matter arising
under this clause shall be final. Contractor shall ensure that none of their employees are ever engaged in
any anti-national activities.
34.4 All contractor’s personnel entering upon the Owner’s premises shall be properly identified by badges issued
by owner which must be worn all times on Owner’s premises.
35 SUB-LETTING OF WORK:
Sub letting of contracts shall not be generally permitted. However owner may permit sub letting of work on specific
cases subject to the following:-
i) No part of the contract nor any share of interest there shall in any manner or degree be transferred assigned
sublet by the contractor directly or indirectly to any firm or corporation whosoever except as provided for in the
succeeding sub-clause, without the consent in writing of the Owner.
ii) Sub Contractors for Temporary Works Etc.:- The Owner may give written consent to sub-contract for execution
of any part of the works at the site, being entered into by the contractor provided each individual sub-contract
is submitted to the Engineer-in-Charge before being entered into and is approved by him.
iii) List of Sub-Contractors to be supplied: - At the commencement of every month the contractor shall furnish to
the Engineer-in-Charge list of all sub-contractors or firms engaged by the contractor and working at the site
during the previous month with particulars of the general nature of the sub-contract or works.
iv) Contractor’s Liability Not Limited By Sub-Contractors:- Notwithstanding any sub-letting with such approval as
aforesaid and notwithstanding that the Engineer-in-Charge shall have received copies of any sub-contracts, the
contractor shall be and shall remain solely responsible for the quality and proper and expeditious execution of
the works and the performance of all the conditions of the contract in all respects as if such sub-letting or sub-
contracting had not taken place and as if such work had been done directly by the Contractor.
v) Owner may Terminate Sub-Contracts:- If any sub-contractor engaged upon the works at the site executes any
work which in the opinion of the Engineer-in-Charge is not in accordance with the Contract documents, the
owner may by written notice to the contractor request him to terminate such sub-contract and the contractor
upon the receipt of such notice shall terminate such sub contract and the latter shall forthwith leave the works,
failing which the owner shall have right to remove such sub-contractors from the Site.
vi) No Remedy For Action Taken Under This Clause:- No action taken by the owner under the clause shall relieve
the contractor of any of his liabilities under the contract or give rise to any right to compensation, extension of
time or otherwise failing which, the owner shall have right to remove such sub-contractors from the Site.
36 POWER OF ENTRY:
If the contractor shall not commence the work in the manner previously described in the contract document or if he
shall, at any time in the opinion of the Engineer-in-Charge.
i. Fail to carryout the works in conformity with the contract documents, or
ii. Fail to carryout the works in accordance with the time schedule, or
iii. Substantially suspend work or the works for a period of Fourteen days without authority from the
Engineer-in-Charge, or
iv. Fail to carryout and execute the works to the satisfactions of the Engineer-in-Charge, or
v. Fail to supply sufficient or suitable constructional equipments, temporary works, labour materials or things,
vi. Commit or suffer or permit any other breach of any of the provisions of the contract on his part to be
performed or observed or persist in any of the above mentioned breaches of the contract for the fourteen
days, after notice in writing shall have been given to the Contractor by the Engineer-in-Charge requiring
such breach to be remedied, or
vii. Abandon the works, or
viii. During the continuance of the contract, become bankrupt, make any arrangement or composition with his
creditors, or permit any execution to be levied or go into liquidation whether compulsory or voluntary not
being merely a voluntary liquidation for the purpose of amalgamation or reconstruction.
Then in any such case, the Owner shall have the power to enter upon the works and take possession thereof and of
the materials, temporary works, constructional equipment, and stock thereon, and to revoke the contractor’s license
to use the same, and to complete the works, by his agents, other contractor or workmen, or to re-let the same upon
any terms and to such other person firm or corporation as the Owner in his absolute discretion may think proper to
employ and for the purpose aforesaid to use or authorize the use of any materials, temporary works constructional
equipment, and stock as aforesaid without making payment or allowances to the contractor for the said materials
other than such as may be certified in writing by the Engineer-in-Charge to be reasonable, and without making any
payment or allowance to the contractor for the use of the temporary said works, constructional equipments and stock
or being liable for any loss of damage thereto, and if the Owner shall by reason of his taking possession of the works
or of the works being completed by other contractors (due account being taken of any such extra work or works
which may be omitted) then the amount of such excess as certified by the Engineer-in- Charge shall be deducted
from any money which may be due for work done by the contractor under the contract and not paid for. Any deficiency
shall forthwith be made good and paid to the Owner by the contractor and the Owner shall have power to sell in such
manner and for such price as he may think fit all or any of the constructional equipment, materials etc. belonging to
and to recoup and retain the said deficiency or any part thereof out of the proceeds of the sale.
37 CONTRACTORS RESPONSIBILITY WITH OTHER AGENCIES:
Without repugnance to any other condition, it shall be the responsibility of the contractor executing the work of civil
construction, to work in close co-operation and co-ordinate the works with other contractors or their authorized
representatives and the contractor will put up a joint scheme, showing the arrangements, with other contractors /
agencies for carrying his portion of work to the Engineer-in-Charge, and get the approval. The contractor before
finally submitting the schemes to the Engineer-in-Charge shall have the written agreement of the other agencies. The
Engineer-in-Charge before communicating his approval of the scheme, with any required modifications shall get the
final agreement of all the agencies, which shall be binding. No claim shall be entertained on account of the above.
The contractor shall conform in all respects with the provisions of any statutory regulations, ordinances or by laws of
any local or duly constituted authorities or public bodies which may be applicable from time to time to the works or
any temporary works. The contractor shall keep the Owner Indemnified against all penalties and liabilities of every
kind arising out of non-adherence to such statutes ordinances, laws, rules, regulations, etc.
38 OTHER AGENTS AT SITE:
The contractor shall have to execute the work in such place and condition where other agencies might also be
engaged for other works such as site grading, filling and leveling, electrical and mechanical engineering works etc.
No claim shall be entertained to works being executed in the above circumstances.
Any notice hereunder may be served on the contractor or his duly authorized representative at the job site or may
be served by registered mail direct to the address furnished by the Contractor. Proof of issue of any such notice could
be conclusive of the contractor having been duly informed of all contents therein.
40 RIGHTS OF VARIOUS INTERESTS:
i) The Owner reserves the right to distribute the work between more than one contractor. The contractor shall co-
operate and afford other contractors reasonable opportunity for access to the works for the carriage and storage of
materials and execution of their works.
ii) Whenever the work being done by any department of the Owner or by other contractors employed by the Owner
is contingent upon work covered by the contract, the respective rights of the various interests involved shall be
determined by the Engineer-in-Charge to secure the completion of the various portions of the work in general
41 RIGHT OF OWNER TO DETERMINE / TERMINATE CONTRACT
i) Owner shall, at any time be entitled to determine and terminate the contract, if in the opinion of the Owner the
cessation of the work becomes necessary owing to paucity of funds or for any other cause whatsoever, in which case,
the cost of approved materials at the site at current market rates as verified and approved by Engineer-in- Charge
and of the value of the work done to date by the contractor shall be paid for in full at the rates specified in the
contract. A notice in writing from the Owner to the contractor of such determination and termination and the reason
thereof, shall be the conclusive proof of the fact that the contract has been so determined and terminated by the
ii) Should the contract be determined under sub-clause (i) of this clause and the contractor claims payments to
compensate expenditure incurred by him in the expectation of completing the whole of the work, the Owner shall
consider and admit such claim as are deemed fair and reasonable and are supported by vouchers to the satisfaction
of the Engineer-in-Charge. The Owner’s decision on the necessity and propriety of any such expenditure shall be final
and conclusive and binding on the contractor.
42 TERMINATION FOR CONVENIENCE :
BPCL shall, in addition to any other right enabling it to terminate the contract, have the right to terminate the contract
at any time by giving prior written notice of at least 14 days to the contractor. Such termination shall be without prejudice
to the rights of the parties that have accrued on or before the date of termination of the contract.
If the contract is terminated under this provision, the contractor is entitled to be compensated as under:-
a. the contract price attributable to the works performed as at the date of termination
b. the reasonable costs incurred by the contractor for termination of subcontractors or the repatriation of the
contractors’ and subcontractors’ employees
the aggregate of all previous payments allocated to the works.
Any sums due to BPCL from the contractor accruing prior to the date of termination will be deducted from the amount
to be paid to the contractor under the contract.
If, as a result of any such deductions, there is a negative amount payable to the contractor, then the contractor must
pay an amount equal to such negative sum to BPCL within 15 days of BPCL intimating the contractor.
43 PATENTS AND ROYALTIES:
43.1 The contractor, if licensed under any patent covering equipment, machinery, materials or compositions of matter to
be used or supplied or methods and process to be practiced or employed in the performance of this contract, agrees
to pay all royalties and licence fees which may be due with respect thereto. If any equipment, machinery, materials
or composition matters, to be used or supplied or methods and process to be practised or employed in the
performance of this contract, is covered by a patent under which contractor is not licensed then the contractor before
supplying or using the equipment, machinery, materials, compositions method or processes shall obtain such licences,
and pay such royalties and licence fees as may be necessary for performance of the contract. In the event, the
contractor fails to pay any such royalties or obtain any such licence, any suit for infringement of such patents which
is brought against the contractor or the Owner as a result of such failure will be defended by the contractor at his
own expenses and the contractor will pay any damages and costs awarded in such suit. The contractor shall promptly
notify the owner if the contractor has acquired knowledge of any patent under which a suit for infringement could be
reasonably brought because of the use by the Owner of any equipment, machinery, materials, and process methods
to be supplied hereunder. The contractor agrees to and does hereby grant to Owner, together with the right to extend
the same to any of the subsidiaries of the Owner as irrevocable, royalty- free licence to use in any country, any
invention made by the contractor or his employee in or as a result of the performance of the work under the contract.
The Owner shall indemnify and save harmless the contractor from any loss on account of claims on contractor for the
contributory infringement of patent rights arising out and based upon the claim that the use by the Owner of the
process included in the design prepared by the Owner and used in the operation of the plant infringes on any patent
right with respect to any sub-contract entered into by contractor pursuant to the provisions of sub-contractor
an undertaking to provide the Owner with the same patent protection that contractor is required to provide under
the provisions of this clause.
43.2 All drawings, blue prints, tracings, reproducible, models, plans, specification and copies thereof, furnished by the
Owner as well as drawings, tracings, reproducible, plans specifications, design, calculations etc. prepared by the
contractor for the purpose of execution of works covered in or connected with this contract shall be the property of
Owner and shall not be used for any other work but are to be delivered to the Owner at the completion of the contract.
43.3 Where so desired by Engineer-in-Charge, the contractor agrees to respect the secrecy of any document, drawings
etc. issued to him for the execution of this contract, and restrict access to such documents, drawing etc. to the
minimum and further, the contractor agrees to execute an individual SECRECY agreement from each or any person
employed by contractor having access to such documents, drawings and to any other agency or individual, without
the written approval by Engineer-in-Charge.
44.1 If, at any time, there should be evidence or any lien or claim for which the Owner might have become liable and
which is chargeable to the contractor, the Owner shall have the right to retain out of any payment then due or
thereafter to become due an amount sufficient to completely indemnify the owner against such lien or claim and if
such lien or claim be valid the Owner may pay and discharge the same and deduct the amount so paid from any
money which may be or may become due and payable to the Contractor. If any lien or claim remain unsettled after
all payments are made, the contractor shall refund or pay to the Owner all moneys that the latter may be compelled
to pay in discharging such lien or claim including all costs and reasonable expenses.
44.2 Contractor will not disclose details of the work to any person or persons except those engaged in its performance,
and only to the extent required for the particular portion of the work being done.
Contractor will not give any items concerning details of the work to the press or a news disseminating agency without
prior written approval from Engineer-in-Charge. Contractor shall not take any pictures on site without written approval
of Engineer-in-Charge
45 OPERATION OF CONTRACT:
45.1 Law Governing:
Regardless of the place of contracting, place of performance or otherwise, this Agreement, and all amendments,
modifications, alterations, or supplements, thereto shall be governed by the laws of India and respective state laws
for the nature, validity and interpretation thereof.
45.2 Non-Waiver of Default:
Any failure by the Owner or Contractor at any time, or from time to time, to enforce or require the strict keeping and
performance of any of the terms or conditions of this agreement, or to exercise a right hereunder, shall not constitute
a waiver of such terms, conditions or rights, and shall not affect or impair same, or the right of the Owner or the
Contractor, as the case may be at any time to avail itself of same.
PERFORMANCE OF WORK
46 EXECUTION OF WORKS:
46.1 All the works shall be executed in strict conformity with the provisions of the contract documents and with such
explanatory detailed drawings, specifications, and instructions as may be furnished from time to time to the contractor
by the Engineer-in-Charge whether mentioned in the contract or not. The contractor shall be responsible for ensuring
that works throughout are executed in the most substantial, proper and workman like manner with the quality of
material and workmanship in strict accordance with the specifications following all safety requirements of BPCL and
as stipulated in work permits as per the directions and to the entire satisfaction of the Engineer-in- Charge.
46.2 Wherever it is mentioned in the specifications that the Contractor shall perform certain work or provide certain
facilities/materials, it is understood that the contractor shall do, so at his cost unless otherwise specified.
46.3 The materials, design and workmanship shall satisfy the relevant Indian Standards, the Job specification contained
herein and codes referred to. Where the job specification stipulate requirements in addition to those contained in the
standards codes and specifications, these additional requirements shall also be satisfied.
47 COORDINATION AND INSPECTION OFWORK:
The coordination and inspection of the day-to-day work under the contract shall be the responsibility of the Engineer-
in-Charge. The written instructions regarding any particular job will be normally be passed by the Engineer-in-Charge
or his authorized representative. A work order book / logbook will be maintained by the Contractor for each job in
which the aforesaid written instructions will be entered. These will be signed by the contractor or his authorized
representative by way of acknowledgment within 12 hours. The non maintaining of the order book or non signing by
the contractor shall not preclude the contractor from complying with the instructions.
48 WORK IN MONSOON ANDDEWATERING:
48.1 The completion of the work may entail working in the monsoon also. The contractor must maintain a minimum labour
force as may be required for the job and plan and execute the construction and erection according to the prescribed
schedule. No extra rate will be considered for such work in monsoon.
48.2 During monsoon and other period, it shall be the responsibility of the contractor to keep the construction work site
free from water at his own cost.
49 WORK ON SUNDAYS ANDHOLIDAYS:
For carrying out work on Sundays and Holidays if needed, the contractor will approach the Engineer-in-Charge or his
representative at least two days in advance and obtain permission in writing. No special compensation on this account
will be payable.
50 GENERAL CONDITIONS FOR CONSTRUCTION AND ERECTION WORK:
50.1 Place of Work:
The work has to be executed at specified premises as per the tender. Contractor should apprise himself of all the
conditions prevailing in such location and the restrictions placed on movement of personnel and equipment, types of
equipment and tools permitted, working methods allowed etc. in the light of security and safety regulations operative
The safety regulations to be complied with, by the contractor will also be provided along with the tender. No idle time
wages or compensation for temporary stoppage of work or restrictions would be paid, and the rate quoted for the
various items of work should cover the cost of all such contingencies and eventualities. Substantial structures and
utilities exist both above ground and underground, adjacent to the work site. (The construction activity gets restrained
by the existence of such structures and utilities). Special care is necessary in transportation, storage, working on
equipments and other construction activities to protect the existing features and prevent damage to any facility.
Necessary protective structures barricades etc. have to be erected at various places as directed by Engineer-in-
Charge. No extra payment of such protective works will be made unless specially provided in the tender.
50.2 The working time or the time of work is 48 hours per week normally. Overtime work is permitted in cases of need
and the Owner will not compensate the same. Shift working at 2 or 3 shifts per day may become necessary and the
contractor should take this aspect into consideration for formulating his rates for quotation. No extra claims will be
entertained by the Owner on this account.
50.3 The contractor must arrange for the placement of workers in such a way that the delayed completing of the work or
any part thereof for any reasons whatsoever will not affect their proper employment. The Owner will not entertain
any claim for idle time payment whatsoever.
50.4 The contractor shall submit to the Owner reports at regular intervals regarding the state and progress of work. The
details and proforma of the report will mutually be agreed after the award of contract.
51 DRAWINGS TO BE SUPPLIED BY THE OWNER:
51.1 Where drawings are attached with tender, these shall be for the general guidance of the contractor to enable him to
visualize the type of work contemplated and scope of work involved. The contractor will be deemed to have studied
the drawings and formed an idea about the work involved.
51.2 Detailed working drawings on the basis of which actual execution of the work is to proceed will be furnished from
time to time during the progress of the work. The contractor shall be deemed to have gone through the drawings
supplied to him thoroughly and carefully and in conjunction with all other connected drawings and bring to the notice
of the Engineer-in-Charge, discrepancies, if any, therein before actually carrying out the work.
51.3 Copies of all detailed working drawings relating to the works shall be kept at the contractor’s office of the site and
shall be made available to the Engineer-in-Charge at any time during the contract. The drawings and other documents
issued by the Owner shall be returned to the Owner on completion of the works. Reference is also invited to clause
43.2 and 43.3 above regarding drawings and other documents.
52 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR:
52.1 Where drawings/data are to be furnished by the contractor, they shall be as enumerated in the special conditions of
contract, and shall be furnished within the specified time.
52.2 Where approval of drawings before manufacture / construction / fabrication has been specified, it shall be contractor’s
responsibility to have these drawings prepared as per the directions of Engineer-in-Charge and got approved before
proceeding with manufacture construction / fabrication, as the case may be. Any changes that may have become
necessary in these drawings during the execution of the work shall have to be carried out by the contractor to the
satisfaction of Engineer-in-Charge at no extra cost. All final drawings shall bear the certification stamps duly signed
by both the contractor and the Engineer-in-Charge.
52.3 A period of 3 weeks from the date of receipt shall be required normally for approval of drawings by the Engineer-in-
53 SETTING OUT WORKS:
53.1 The Engineer-in-Charge shall furnish the contractor with only the four corners of the work site and a level bench mark
and the contractor shall set out the works and shall provide efficient staff for the purpose and shall be solely
responsible for the accuracy of such setting out.
53.2 The contractor shall provide, fix and be responsible for the maintenance of all stacks, templates, level marks, profiles
and other similar things and shall take all necessary precaution to prevent their removal or disturbance and shall be
responsible for the consequence of such removal or disturbance should the same take place and for their efficient
and timely reinstatement. The contractor shall also be responsible for the maintenance of all existing survey marks,
boundary marks, distance marks and centre line marks, either existing or supplied and fixed by the contractor. The,
work shall be set out to the satisfaction of the Engineer-in-Charge. The approval thereof or joining in setting out the
work shall not relieve the contractor of any of his responsibilities.
53.3 Before beginning the works, the contractor shall at his own cost, provide all necessary reference and level posts,
pegs, bamboos, flags, ranging rods, strings and other materials for proper layout of the work in accordance with the
scheme, for bearing marks acceptable to the Engineer-in-Charge. The centre, longitudinal or face lines and cross lines
shall be marked by means of small masonry pillars. Each pillar shall have distinct marks at the centre to enable
theodolite to be set over it. No work shall be started until all these points are checked and approved by the Engineer-
in-Charge in writing but such approval shall not relieve the contractor of any of his responsibilities. The contractor
shall also provide all labour, material and other facilities, as necessary, for the proper checking of layout and inspection
of the points during construction.
53.4 Pillars bearing geodetic marks located at the site of work under construction should be protected and fenced by the
53.5 On completion of works, the contractor must submit the geodetic documents according to which the work was carried
54 RESPONSIBILITY FOR LEVEL ANDALIGNMENT:
The contractor shall be entirely and exclusively responsible for the horizontal and vertical alignment, the levels and
correctness of every part of the work and shall rectify effectually any errors or imperfections therein. Such
rectifications shall be carried out by the contractor, at his own cost, when instructions are issued to that effect by the
Engineer-in-Charge.
55 MATERIALS TO BE SUPPLIED BY CONTRACTOR:
55.1 The contractor shall procure and provide the whole of the materials required for construction including tools, tackles,
construction plant and equipment for the completion and maintenance of the works except the materials which will
be issued by Owner and shall make his own arrangement for procuring such materials and for the transport thereof.
The materials procured by the contractor shall be BPCL approved/specified quality.
55.2 All materials procured should meet the specifications given in the tender document. The Engineer-in-Charge may, at
his discretion, ask for samples and test certificates for any batch of any material procured. Before procuring, the
contractor should get the approval of Engineer-in-Charge for any material to be used for the works.
55.3 Manufacturer’s certificate shall be submitted for all materials supplied by the contractor. If, however, in the opinion
of the Engineer-in-Charge any tests are required to be conducted on the materials supplied by the contractor, these
will be arranged by the contractor promptly at his own cost.
56 MATERIALS SUPPLIED BY OWNER:
56.1 If the specifications of the work provides for the use of any materials of special description to be supplied from the
Owner’s stores, price for such material to be charged therefore as herein after mentioned being so far as practicable
for the convenience of the contractor but not so as in any way to control the meaning or effect of the contract. The
contractor shall be bound to purchase and shall be supplied such materials as are from time to time required to be
used by him for the purpose of the contract only. The sums due from the contractor for the value of the actual
materials supplied by the Owner will be recovered from the running account bill on the basis of the actual consumption
of materials in the work covered and for which the running account bill has been prepared. After the completion of
the works, however, the contractor has to account for the full quantity of materials supplied to him as per relevant
clauses in this document.
56.2 The value of the materials as may be supplied to the contractor by the Owner will be debited to the contractor’s
account at the rates shown in the schedule of chargeable materials and if they are not entered in the schedule, they
will be debited at cost price, which for the purpose of the contract shall include the cost of carriage and all other
expenses whatsoever such as normal storage supervision charges which shall have been incurred in obtaining the
same at the Owner’s stores. All materials so supplied to the contractor shall remain the absolute property of the
Owner and shall not be removed on any account from the site of the work, and shall be at all times open for
inspection to the Engineer-in-Charge. Any such materials remaining unused at the time of completion or termination
of the contract shall be returned to the Owner’s stores or at a place as directed by the Engineer-in- Charge in
perfectly good condition, at contractor’s cost.
57 CONDITIONS FOR ISSUE OF MATERIALS:
i) Materials specified to be issued by the Owner will be supplied to the contractor by the Owner from his
stores/location. It shall be the responsibility of the contractor to take delivery of the materials and arrange for its
loading, transport and unloading at the site of work at his own cost. The materials shall be issued between the
working hours and as per the rules of the Owner framed from time to time.
ii) The contractor shall bear all incidental charges for the storage and safe custody of materials at site after these
have been issued to him.
iii) Materials specified to be issued by the Owner shall be issued in standard sizes as obtained from the manufacturer.
iv) The contractor shall construct suitable godown at the site of work for storing the materials safe against damage
by rain, dampness, fire, theft etc. He shall also employ necessary watch and ward establishment for the purpose.
v) It shall be duty of the contractor to inspect the material supplied to him at the time of taking delivery and satisfy
himself that they are in good condition. After the materials have been delivered by the Owner, it shall be the
responsibility of the contractor to keep them in good condition and if the materials are damaged or lost, at any
time, they shall be repaired and/ or replaced by him at his own cost, according to the directions of the Engineer-
vi) The Owner shall not be liable for delay in supply or non-supply of any materials which the Owner has undertaken
to supply where such failure or delay is due to natural calamities, act of enemies, transport and procurement
difficulties and any circumstances beyond the control of the Owner. In no case, the contractor shall be entitled
to claim any compensation or loss suffered by him on this account.
vii) It shall be the responsibility of the contractor to arrange in time all materials required for the works other than
those to be supplied by the Owner. If, however, in the opinion of the Engineer-in-Charge the execution of the
work is likely to be delayed due to the contractor’s inability to make arrangements for supply of materials which
normally he has to arrange for, the Engineer-in-Charge shall have the right, at his own discretion, to Issue such
materials If available with the Owner or procure the materials from the market or elsewhere and the contractor
will be bound to take such materials at the rates decided by the Engineer-in-Charge. This, however, does not in
any way absolve the contractor from responsibility of making arrangements for the supply of such materials in
part or in full, should such a situation occur, nor shall this, constitute a reason for the delay in the execution of
viii) None of the materials supplied to the contractor will be utilized by the contractor for manufacturing item, which
can be obtained from standard manufacturer in finished form.
ix) The contractor shall, if desired by the Engineer-in-Charge, be required to execute an indemnity bond for safe
custody and accounting of all materials issued by the Owner.
x) The contractor shall furnish to the Engineer-in-Charge sufficiently in advance a statement showing his
requirements of the quantities of the materials to be supplied by the Owner and the time when the same will be
required by him for the works, so as to enable the Engineer-in-Charge to make necessary arrangement for
procurement and supply of the material.
xi) A daily account of the materials issued by the Owner shall be maintained by the contractor indicating the daily
receipt, consumption and balance in hand. This account shall be maintained in a manner prescribed by the
Engineer-in-Charge along with all connected papers viz. requisition, issues etc. and shall be always available for
inspection in the contractor’s office at site.
xii) The contractor should see that only the required quantities of materials are got issued. The contractor shall not
be entitled to cartage and incidental charges for returning the surplus materials, if any, to the stores/location
where from they were issued or to the place as directed by the Engineer-in-Charge.
xiii) Materials/ Equipment supplied by Owner shall not be utilized for any other purpose(s) than issued for.
58 MATERIALS PROCURED WITH ASSISTANCE OF OWNER:
Notwithstanding anything contained to the contrary in any or all the clause of this document where any materials for
the execution of the contract are procured with the assistance of Owner either by issue from Owner’s stock or
purchase made under orders or permits or licences issued by Government, the contractor shall hold the said materials
as trustee for the Owner and use such materials economically and solely for the purpose of the contract and not
dispose them off without the permission of the owner and return, if required by the Engineer-in-Charge, all surplus
or unserviceable materials that may be left with him after the completion of the contract or at its termination for any
reason, whatsoever on his being paid or credited such prices as the Engineer in-Charge shall determine having due
regard to the condition of the materials. The price allowed to the contractor however, shall not exceed the amount
charged to him excluding the storage charges if any. The decision of the Engineer-in- Charge shall be final and
conclusive in such matters. In the event of breach of the aforesaid condition, the contractor shall in terms of the
licenses or permits, and/or for criminal breach of trust, be liable to compensate the Owner a double rate or high rate,
in the event of those materials at that time having higher rate or not being available in the market, then any other
rate to be determined by the Engineer-in-Charge and his decision shall be final and conclusive.
59 MATERIALS OBTAINED FROM DISMANTLING:
If the contractor in the course of execution of the work is called upon to dismantle any part for reasons other than
those stipulated in clauses 66 & 70 hereunder, the materials obtained in the work of dismantling etc. will be considered
as the Owner’s property and will be disposed off to the best advantage of the Owner.
60 ARTICLES OF VALUE FOUND:
All gold, silver and other materials, of any description and all precious stones, coins, treasure relies, antiquities and
other similar things which shall be found in, under or upon the site, shall be property of the Owner and the contractor
shall duly preserve the same to the satisfaction of the Engineer-in-Charge and shall from time to time deliver the
same to such person or person indicated by the Owner.
61 DISCREPANCIES BETWEEN INSTRUCTIONS:
Should any discrepancy occur between the various instructions furnished to the contractor, his agents or staff or any
doubt, arise as to the meaning of any such instructions or should there be any misunderstanding between the
contractor’s staff and the Engineer-in-Charge’s staff, the contractor shall refer the matter immediately in writing to
the Engineer-in-Charge whose decision thereon shall be final and conclusive and no claim for losses alleged to have
been caused by such discrepancies between instructions, or doubts, or misunderstanding shall in any event be
62 ALTERATIONS IN SPECIFICATIONS AND DESIGNS AND EXTRA WORK:
A) The Engineer-in-Charge shall have power to make any alterations in, omissions from, additions to of substitutions
for, the schedule of rates, the original specifications, drawings, designs and instructions that may appear to him
to be necessary or advisable during the progress of the work and the contractor shall be bound to carry out such
altered / extra / new items of work in accordance with any instructions which may be given to him in writing signed
by the Engineer-in-Charge and such alterations, omissions, additions or substitutions shall not invalidate the
contract and any altered additional or substituted work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on the same conditions in all respect on
which he agree to do the main work. The time for completion of work may be extended for the part of the particular
job at the discretions of the Engineer-in-Charge, for only such alteration, additions or substitutions of the work, as
he may consider as just and reasonable. The rates for such additional, altered or substituted work under this clause
shall be worked out in accordance with the following provisions:
a) If the rates for the additional, altered or substituted work are specified in the contract for the work, the
contractor is bound to carry out the additional, altered or substituted work at the same rates as are specified in
b) If the rates for the additional, altered or substituted work are not specifically provided in the contract for the
work, the rates will be derived from the rates for similar class of works as specified in the contract for the work.
The opinion of the Engineer-in-Charge as to whether the rates can be reasonably so derived from items in the
contracts will be final and binding on the contractor.
c) If the rates for the altered, additional or substituted work cannot be determined in the manner specified in sub-
clause (a) and (b) above, then the contractor shall inform the Engineer-in-Charge of the rate which is his
intention to charge for such class of work supported by analysis of the rate or rates claimed, and the Engineer-
in-Charge shall determine the rates on the basis of the prevailing market rates of materials, labour cost at
schedule of labour plus 10% to cover contractor’s supervision, overheads and profit and pay the contractor
accordingly. The opinion of the Engineer-in-Charge as to the current market rates of materials and the quantum
of labour involved per unit of measurement will be final and binding on the contractor.
d) Provisions, contained in sub-clause (a) to (c) above shall not, however, apply:
Where the value of alterations / additions / deletions or substitutions exceeds beyond plus or minus 25% of the
estimated contract value (i.e. quoted item rates of contractor shall hold good for variations etc. within plus or
minus 25% of estimated contract value)
B) In the event and as a result of such alternatives / additions / substitutions / deletion, the scope of contract work
exceed the value stipulated in the contract by more than the limits given in clause (d) above, the Contractor shall
claim revision of the rates supported by the proper analysis in respect of such items for quantities in excess of the
above limits, notwithstanding the fact that the rates for such items exist in the tender for the main work or can be
derived in accordance with the provision of sub-clause (b) of Clause 62 A, and the Engineer-in-Charge may revise
their rates having regard to the prevailing market rates, and the contractor shall be paid in accordance with the
rates so fixed. But, under no circumstances the contractor shall suspend / stop / slowdown the work on the plea
of non-settlement of rates of items falling under this clause.
63 VARIATION IN CONTRACT VALUE :
Compensation for Reduction in Contract value due to change in quantity:
➢ Upto & inclusive of (-) 25% of Total Contract Value (TCV): No cost compensation.
➢ Beyond (-) 25% of TCV: Cost compensation @ 10% of reduction in the contract value from (-) 25% of TCV (i.e. 75% of
Discount to be obtained for Increase in contract value due to change in quantity:
➢ Upto & inclusive of (+) 50% of TCV: No discount.
Beyond (+) 50% of TCV: Reduction @ 10% of increase in the contract value beyond (+) 50% of TCV.
64 ACTION WHERE NO SPECIFICATIONS ISSUED:
In case of any class of work for which there is no such specification given by the Owner in the tender documents,
such work shall be carried out in accordance with Indian Standard Specifications and if the Indian Standard
Specifications do not cover the same the work should be carried out as per standard Engineering Practice subject to
the approval of the Engineer-in-Charge.
65 ABNORMAL RATES:
The contractor is expected to quote rate for each item after analysis of cost involved for the completion of item/work,
considering all specifications and conditions of contract. This will avoid loss of profit or gain, in case of curtailment or
change of specification for any item. In case it is noticed that the rates for any item, quoted by the tenderer are
unusually high or unusually low, it will be sufficient cause for the rejection of the tender unless the Owner is convinced
about the reasonableness of the rates on scrutiny of the analysis for such rate to be furnished by the tenderer on
66 INSPECTION OF WORK:
66.1 The Engineer-in-Charge will have full power and authority to inspect the works at any time wherever in progress
either on the Site or at the contractor’s premises / workshop where situated premises /workshops of any person,
firm or corporation where work in connect with the contract may be in hand or where materials are being or are to
be supplied, and the contractor shall afford or procure for the Engineer-in-Charge every facility and assistance to
carry out such Inspection. The contractor shall at all time during the usual working hours and at all other time for
which reasonable notice of the intention of the Engineer in-Charge or his representative to visit the works have been
given to the contractor, either himself be present to receive order and instructions or post a responsible agent duly
accredited in writing for the purpose. Orders given to the contractor’s agent shall be considered to have the same
force as if they had been given to the contractor himself. The contractor shall give not less than seven days, notice
in writing to the Engineer-in-Charge before covering up or placing any work beyond reach of inspection and
measurement any work in order that the same may be inspected and measured. In the event of breach of above
the same shall be uncovered at contractor’s expense carrying out such measurement or inspection.
66.2 No materials shall be dispatched by the contractor before obtaining the approval of Engineer-in-Charge in writing.
The contractor is to provide at all times during the progress of the work and the maintenance period, proper means
of access with ladders, gangways, etc. and the necessary attendance to move and adopt as directed for inspection
or measurement of the works by the Engine in-Charge.
67 ASSISTANCE TO THE ENGINEERS:
The contractor shall make available to the Engineer-in-Charge, free of cost necessary instruments and assistance in
checking of setting out of works and taking measurement of work.
68 TESTS FOR QUALITY OF WORKS:
68.1 All workmanship shall be of the respective kinds described in the contract documents and in accordance with the
instructions of the Engineer-in-Charge and shall be subjected from time to time to such test at contractor’s cost as
the Engineer-in-Charge may direct at place of manufacture or fabrication or on the site or at all or any such places.
The contractor shall provide assistance, instruments, labour and materials as are normally required for examining,
measuring and testing any workmanship as may be selected and required the Engineer-in-Charge.
68.2 All the tests necessary in connection with the execution of the work as decided by Engineer-in-Charge shall be carried
out at the field testing laboratory of the Owner by paying the charges as decided by the Owner from time to time.
In case of non-availability of test facility with the Owner, the required test shall be carried out at the cost of contractor
at government or any other testing laboratory as directed by Engineer-in-Charge.
68.3 If any tests are required to be carried out in connection with the work or materials workmanship not supplied by the
contractor, such tests shall be carried out by the contractor as per the instructions of Engineer-in-Charge and cost
of such tests shall be reimbursed by the Owner.
The contractor shall furnish to the Engineer-in-Charge for approval when requested or if required by the specifications,
adequate samples of all materials and finishes to be used in the work. Such samples shall be submitted before the
work is commenced and in ample time to permit tests and examinations thereof. All materials furnished and finishing
applied in actual work shall be fully identical to the approval samples.
70 ACTION AND COMPENSATION IN CASE OF BAD WORK:
If it shall appear to the Engineer-in-Charge that any work has been executed with unsound, imperfect or unskilled
workmanship or with materials of any inferior description, or that any materials or articles provided by the contractor
for the execution of the work are unsound or of a quality inferior to that contracted for, or otherwise not in accordance
with the contract, the contractor shall on demand in writing from the Engineer-in-Charge or his authorised
representative, specifying the work, materials or articles complained of, notwithstanding that the same have been
inadvertently passed, certified and paid for forthwith shall rectify or remove and reconstruct the works specified and
provide other proper and suitable materials or articles at his own charge and cost, and in the event of failure to do
so within a period to be specified by the Engineer-in-Charge in his demand aforesaid, the contractor shall be liable to
pay compensation at the rate of one percentage of the estimated cost of the whole work, for every week limited toa
maximum of 10 per cent of the estimated cost of the whole work, while his failure to do so shall continue and in the
case of any such failure the Engineer-in-Charge may on expiry of notice period rectify or remove and re-execute the
work or remove and replace with others, the materials or articles complained of as the case may be at the risk and
expenses of the contractors in all respects. The decision of the Engineer-in-Charge as to any question arising under
this clause shall be final and conclusive.
71 SUSPENSION OF WORKS:
The contractor shall, if ordered in writing by the Engineer-in-Charge or his representative, temporarily suspend the
works or any part thereof for such period and such time as so ordered and shall not, after receiving such written
order, proceed with the work therein ordered to be suspended, until he shall have received a written order to proceed
therewith. The contractor shall not be entitled to claim/ compensation for any loss or damage sustained by him by
reason of temporary suspension of the works aforesaid. An extension of time for completion, corresponding with the
delay caused by any such suspension of the works as aforesaid will be granted to the contractor, should he apply for
the same, provided that suspension was not consequent to any default or failure on the part of the contractor.
72 OWNER MAY DO PART OF WORK:
Upon failure of the contractor to comply with any instructions given in accordance with the provisions of the contract,
the owner has the alternative right, instead of assuming charge for entire work to place additional labour force, tools,
equipments and materials on such parts of the work, as the owner may designate or also engage another contractor
to carry out the work. In such cases, the owner shall deduct from the amount which otherwise might become due to
the contractor, the cost of such work and materials with ten percent added to cover all departmental charges and
should the total amount thereof exceed the amount due to the contractor, the contractor shall pay the difference to
73 POSSESSION PRIOR TO COMPLETION:
The Engineer-in-Charge shall have the right to take possession of or use any completed or partially completed work
or part of the work. Such possessions or use shall not be deemed to be an acceptance of any work completed in
accordance with the contract agreement. If such prior possession or use by the Engineer-in-Charge delays the
progress of work, suitable adjustment in the time of completion will made and contract agreement shall be deemed
to be modified accordingly.
74 PERIOD OF LIABILITY FROM THE DATE OF COMPLETION OF WORK:
74.1 The contractor shall guarantee the installation/site work for a period of 12 (twelve) Months from the date of completion
of work, unless otherwise specified. Any damage that may lie undiscovered at the time of issue of completion
certificate, connected in any way with the equipment or materials supplied by him or in the workmanship shall be
rectified or replaced by the contractor at his own expense as deemed necessary by the Engineer-in-Charge or in
default, the Engineer-in-Charge may cause the same made good by other workmen and deduct expenses (for which
the certificate of Engineer-in-Charge shall be final) from any sums that may be then or at any time thereafter, become
due to the contractor or from his security deposit. In case the defect arises within the abovementioned Defect Liability
Period (DLP) and the same is repaired/replaced, the DLP for the repaired/replaced job/item will be extended suitably
so as to cover the original DLP. However, in no case, such extension will exceed 24 months from date of start of initial
74.2 If the contractor feels that any variation in work or in quality of materials or proportions would be beneficial or
necessary to fulfill the guarantee called for, he shall bring this to the notice of the Engineer-in-Charge in writing. The
work will not be considered as complete and taken over by the Owner until all the temporary works etc., constructed
by the contractor is removed and work site cleaned to the satisfaction of Engineer-in-Charge.
74.3 Care of Works:
From the commencement to completion of works, the contractor shall take full responsibility for the care of all works
including all temporary works, and in case any damage, loss or injury happens to the works or to any part thereof or
to any temporary work, from any cause whatsoever, he shall at own cost repair and make good the same, so that at
completion, the work shall be in good order and in conformity in every respect with the requirements of the contract
and the Engineer-in-Charge’s instructions.
74.4 Effects prior to taking over:
If at any time, before the work is taken over, the Engineer-in-Charge shall
a) Decide that any work done or materials used by the contractor or any sub-contractor is defective or not in
accordance with the contract or that the works or any portion thereof are defective or do not fulfill the
requirements of contract (all such matters being herein after called ‘Defects’ in this clause) and
b) As soon as reasonably practicable, notice given to the contractor in writing of the said decisions specifying
particulars of the defects alleged to exist or to have occurred, then the contractor shall at his own expenses and
with all speed make good the defects so specified.
In the case contractor shall fail to do so, the Owner may take, at the cost of the contractor, such steps as may in all
circumstances, be reasonable to make good such defects. The expenditure, so incurred by the Owner shall be
recovered from the amount due to the contractor. The decision of the Engineer-in-Charge with regard to the amount
be recovered from the contractor will be final and binding on the contractor. As soon as the works have been
completed in accordance with the contract (except in minor respects that do not affect their use for the purpose for
which they are intended and except for maintenance thereof provided in clause 74.1) and have passed the tests on
completion, the Engineer-in-Charge shall issue a certificate (hereinafter called completion certificate) in which he
shall certify the date on which the work have been so completed and have passed the said tests and the Owner shall
be deemed to have taken over the works on the date so certified. If the works have been divided into various groups
in the contract, the Owner shall be entitled to take over any group or groups before the other or others and thereupon
the Engineer-in-Charge shall issue a completion certificate which will however, be for such group or groups as taken
74.5 Defects after taking over:
In order that the contractor could obtain a completion certificate, he shall make good with all possible speed, any
defect arising from the defective materials supplied by the Contractor or workmanship or any act of omission of the
contract that may have been noticed or developed after the works or group of the works has been taken over. The
period allowed for carrying out such work will be normally one month. If any defect be not remedied within a
reasonable time, the Owner may proceed to do the work at the contractor’s risk and expense and deduct from the
final bill such amount as may be decided by the Owner. If by reason of any default on the part of the contractor a
completion certificate has not been issued in respect of every portion of the work within one month after the date
fixed by the contract for the completion of the works, the Owner shall be at his liberty to use the works or any portion
thereof in respect of which a completion certificate has been issued provided that the works or the portion thereof
so used as aforesaid shall be afforded reasonable opportunity for completing these works for the issue of completion
74.6 The Security Deposit/retention money deducted / furnished as per clause 18 of GCC shall be retained for the period
of liability as given in clause 74.1 above. This Retention amount / Bank Guarantee / Insurance Surety Bond furnished
against Security Deposit / retention money shall be released only on expiry of the period of liability and also based
on the certification of the Engineer-in-charge that no defect/damage has been reported / observed during the stipulated
period of liability for the contract.
74.7 Performance of contractor shall be evaluated on each job by Engineer-in-Charge and recorded. Review of performance
will be carried out at appropriate intervals by BPCL.
BILLS / MEASUREMENT / PAYMENT
75 SCHEDULE OF RATES AND PAYMENTS:
i) Contractor’s Remuneration
The price to be paid by the Owner to contractor for the whole of the work to be done and the performance of all the
obligations undertaken by the contractor under the contract documents shall be ascertained by the application of the
respective item rates (the inclusive nature of which is more particularly defined by way of application but not of
limitation, with the succeeding sub-clause of this clause) and payment to be made accordingly for the work actually
executed and approved by the Engineer-in-Charge. The sum so ascertained shall (excepting only as and to the extent
expressly provided herein) constitute the sole and inclusive remuneration of the contractor under the contract and
no further payment whatsoever shall be or become due or payable to the contractor under the contract.
ii) Schedule of rates to be inclusive:
The prices/rates quoted by the contractor shall remain firm till the issue of final completion certificate and shall not
be subject to escalation. Schedule of rates shall be deemed to include and cover all costs, expense and liabilities of
every description and all risk of every kind to be taken in executing, completing and handing over the work to the
Owner by the Contractor. The Contractor shall be deemed to have known the nature, scope, magnitude and the
extent of the works and materials required, though the contract document may not fully and precisely furnish them.
He shall make such provision in the item rates as he may consider necessary to cover the cost of such items of work
and materials as may be reasonable and necessary to complete the works. The opinion of the Engineer-in- Charge
as to the items of work which are necessary and reasonable for completion of work shall be final and binding on the
contractor, although the same may not be shown on or described specially in contract documents.
Generality of this present provision shall not be deemed to cut down or limit in any way because in certain cases it
may and in other cases it may not be expressly stated that the contractor shall do or perform a work or supply articles
or perform services at his own cost or without addition of payment or without extra charges or words to the same
effect or that it may be stated or not stated that the same are included in and covered by the schedule of rates.
iii) Schedule of Rates to Cover Constructional Equipments, Materials, Labour etc.
Without in any way limiting the provisions of the preceding sub-clause the schedule of rates shall be deemed to
include and cover the cost of all constructional equipment, temporary work (except as provided for herein), pumps,
materials, labour, the insurance, fuel, stores and appliances to be supplied by the contractor and other matters in
connection with each item in the schedule of rates and the execution of the works or any portion thereof, finished,
complete in every respect and maintained as shown or described in the contract documents or may be ordered in
writing during the continuance of this contract.
iv) Schedule of Rates to cover Royalties, Rents and Claims:
The Schedule of Rates shall be deemed to include and cover the cost of all royalties and fees for the articles and
processes, protected by letters, or otherwise incorporated in or used in connection with the works, also all royalties,
rents and other payments in connection with obtaining materials of whatsoever kind for the works and shall include
an indemnity to the Owner which the contractor hereby gives against all actions, proceedings, claims damages, costs
and expenses arising from the incorporation in or use on the works of a such articles, processes or materials, Octroi
or other municipal or local Board charges levied on materials, equipment or machineries to be brought to site for use
on work shall be borne by the contractor.
v) Schedule of Rates to Cover Taxes and Duties:
No claim or exemption or reduction of customs duties, GST, quarry or any port dues, transport charges, stamp duties
or Central or States Government or Local Body or Municipal Taxes or duties, taxes or charges (from or of any other
body), whatsoever, will be granted or obtained, all of which expenses shall be deemed to be included in and covered
by the Schedule of Rates. Contractor shall also obtain and pay for all permits, or other privileges necessary to complete
vi) Schedule of Rates to cover Risk of Delay:
The schedule of Rates shall be deemed to include and cover the risk of all possibilities of delay and interference with
the contractors conduct of work which occur from any cause including orders of owner in the exercises of his powers
and on account of extension of time granted due to various reasons and for all other possible or probable cause of
vii) Schedule of Rates cannot be altered:
For work under unit rate basis, no alteration will be allowed in the schedule of Rates by reason of work or any part
of them being modified, altered, extended, diminished or omitted. The schedule of Rates are fully Inclusive rates
which have been fixed by the contractor and agreed to the Owner and cannot be altered.
For lumpsum contract, the payment will be made according to the work actually carried out for which purpose an
item wise or workwise, Schedule of rates shall be furnished, suitable for evaluating the value of work done and
preparing running account bills.
76 PROCEDURE FOR MEASUREMENT / BILLING OF WORK IN PROGRESS:
i) Measurements:
All measurements shall be in metric system. All the works in progress will be jointly measured by the representative
of the Engineer-in-Charge and the Contractor’s authorise agent progressively. Such measurement will be got recorded
in the measurement book by the Engineer-in-Charge or his authorised representative and signed in token of accepted
by the contractor or his authorised representative.
For the purpose of taking joint measurement the contractor’s representative shall be bound to be present whenever
required by the Engineer-in-Charge. If, however, he absents for any reason whatsoever the measurement will be
taken by the Engineer-in-Charge or his representative and this will be deemed to be correct and binding on the
The contractor will submit a bill to the Engineer-in-Charge of the work giving abstract and detailed measurements
for the various items executed during a month, before the expiry of the 1st week of the succeeding month. The
Engineer-in-Charge shall take or cause to be taken the requisite measurements for the purpose of having the same
verified and the claim, as far as admissible, adjusted, if possible, before the expiry of 10 days from presentation of
iii) Dispute in Mode of Measurements:
In case of any dispute as to the mode of measurement not covered by the contract to be adopted for any item of
work, mode of measurement as per latest Indian Standard Specifications shall be followed.
77 LUMPSUMS IN TENDER:
For the items in tender where it includes lumpsum in respect of parts of work, the contractor shall be entitled to
payment in respect of the items at the same rates as are payable under this contract for such items, or if part of the
work in question is not In the opinion of the Engineer-in-Charge capable of measurement of determination, the owner
may at his discretion pay the lumpsum amount entered In the tender or a percentage thereof and the certificate In
writing of the Engineer-in-Charge shall be final and conclusive against the contractor with regards to any sum or sums
payable to him under the provisions of the clause.
78 RUNNING ACCOUNT PAYMENTS TO BE REGARDED AS ADVANCES:
All running account payments shall be regarded as payment by way of advance against the final payment only and
not as payments for work actually done and completed and shall not preclude the requiring of bad, unsound and
imperfect, or unskilled work to be removed and taken away and reconstructed or re-erected or be considered as an
admission of the due performance of the contract, or any part thereof in this respect, or of the accruing of any claim
by the contractor, nor shall it conclude, determine or affect in any way the powers of the Owner under these conditions
or any of them as to the final settlement and the adjustments of the accounts or otherwise, or in any other way vary
or affect the contract.
The final bill shall be submitted by the contractor within one month of the date of physical completion of the work,
and settled immediately but not later than 60 days otherwise the Engineer-in charge’s certificate of the measurement
and of total amount payable for the work accordingly shall be final and binding on all parties. The final bill shall be
presented by the contractor along with ‘No claim certificate’ in a format acceptable to the owner or such other
documents as directed by the owner.
Should the contractor consider that he is entitled to any extra payment for extra job carried out whatsoever in respect
of the works, he shall forthwith give notice in writing to the Engineer-in-Charge that he claims extra payment for the
extra work. Such notice shall be given to the Engineer-in-Charge within one week from the ordering of any extra work
or happening of any event, upon which the contractor bases such claims, and such notice shall contain full particulars
of the nature of such claim with full details and amount claimed. Failure on part of the contractor to put forward any
claim with the necessary particulars as above within the time above specified shall be an absolute waiver thereof. No
omission by the owner to reject any such claim and no delay in dealing therewith shall be waiver by the owner of any
rights in respect thereof.
80 PAYMENT OF CONTRACTOR’S BILL:
Generally no payment shall be made for works estimated to cost less than Rs. 50,000/- till the whole of the work shall
have been completed. But in case of works estimate to cost more than Rs. 50,000/- the contractor on submitting the
bill thereof be entitled to receive a monthly payment proportion to the part thereof approved and passed by the
Engineer-in-Charge, whose certificate of such approval and passing of the sum so payable shall be final and conclusive
against the contractor. This payment will be made after making necessary deductions as stipulated elsewhere in the
contract document for materials, security deposit or any moneys due to the Owner etc.
75% payment of the Running Account bill (RA bill) shall be released within 15 calendar days of receipt of RA bill duly
certified by Engineer-in-charge (EIC) and the balance payment shall be released within 30 days of receipt of RA bill
by EIC after detailed scrutiny.
81 CONCLUSION OF CONTRACT:
In a situation where the L1 bidder is not lowest for some specific line items and the L1/L2 parity is likely to be
affected during the execution of the contract, due to variation in quantities of individual line items in contract based on
site conditions, then the final payment could be restricted to ensure that the overall total payment of the executed
work does not exceed the overall amount that would have been payable to the then L1 as per the latter’s quoted rates.
82 MODE OF PAYMENT:
Payment will be made to the contractor normally through NEFT mode.
82A Bill discounting through TreDs
The eligible MSME bidders can avail discounting Facility as follows:
Trade Receivables Discounting System (TReDS) is an institutional mechanism set up in order to facilitate discounting
of trade receivables of MSMEs from corporate buyers through invoice discounting by multiple financiers. Bharat
Petroleum Corporation Limited (BPCL) is registered with TReDS platform of the aggregators M/s. Receivables
Exchange of India Ltd (RXIL), M/s Invoice mart, M/s. M1 xchange, M/s C2treds and M/s DTX. The eligible MSME
bidders can avail the discounting facility by registering either in one or multiple TReDS platform of the aggregators.
It enables the sellers (MSMEs) to discount their invoices through the aggregators to the financiers at competitive
rates thus unlocking their working capital swiftly.
83 COMPLETION CERTIFICATE:
83.1 Application for Completion Certificate:
When the contractor fulfills his obligation under clause 74.4, he shall be eligible to apply for completion certificate.
The contractor may apply for separate completion certificate respect of each such portion of the work by submitting
the completion documents along with such application for completion certificate.
The Engineer-in-Charge shall normally issue to the contractor the completion certificate within one month after
receiving an application therefore from the contractor after verifying from the completion documents and satisfying
himself that the work has been completed in accordance with and as set out in the construction and erection drawings
and the contract documents.
The contractor, after obtaining the completion certificate is eligible to present the final bill for the work executed by
him under the terms of contract.
83.2 Completion Certificate:
The contractor shall be furnished with a certificate by the Engineer-in-Charge of such completion, but no certificate
shall be given nor shall the work be deemed to have been executed until all scaffolding surplus materials and rubbish
is cleared off the site completely or until the work shall have been measured by the Engineer-in-Charge whose
measurement shall be binding and conclusive. The work will not be considered complete and taken over by the
Owner, until all the temporary works, labour and staff colonies etc. constructed are removed and the work site
cleaned of all debris etc., as described in clause in 83.3 below and to the satisfaction of the Engineer-in-Charge.
If the contractor shall fail to comply with the requirements of this clause on or before the date fixed for the completion
of the work, the Engineer-in-Charge may at the expenses of the contractor remove such scaffolding, surplus materials
and rubbish and dispose off the same as he thinks fit and clean off such dirt as aforesaid, and the contractor shall
forthwith pay the amount of all expenses so incurred and shall have no claim in respect of any such scaffolding or
surplus materials as aforesaid except for any sum actually realised by the sale thereof.
83.3 Clearing the site:
Cart away all debris generated from the work and dispose it off without giving rise to any complaints from local,
municipal or government authorities. Metal scraps or any other scrap including wooden packing materials shall be
disposed as instructed by the Engineer-in-Charge or as follows:
a) All unused scrap steel bar/ structural steel sections/pipe materials etc., (Free issue by owner) shall be the
property of the owner and the same shall be returned by the contractor category-wise at their own cost
to Owner’s store. The weighment slip issued by the Warehouse (in original) is required to be attached
along with the final bill/ material reconciliation statement. In case, the material is supplied by the
contractor, as per their scope of work, the scrap material generated out of the same should be taken out
at their own cost before the settlement of the final bill.
b) Insulation material (either issued by owner to the contractor or supplied by contractor) shall be kept in the
area allocated by owner. During the insulation activities, the contractor should keep the work area clean
on day-to-day basis. On completion of insulation job, all debris/packing should be taken out to the
designated location or as directed by the Engineer in charge for disposal at their own cost before the
settlement of the final bill.
83.4 The financial implication of above, if any, should be taken care of in the quoted rates; and no separate claim shall be
entertained on this account. The final bill of the contractor shall be linked with the area cleaning in all respects, including
removal of shuttering material, disposal of debris/scrap etc. to the entire satisfaction of Engineer-in- Charge.
84 FINAL DECISION AND FINAL CERTIFICATE:
Upon Expiry of the period of liability and subject to the Engineer-in-Charge being satisfied that the works have been
duly maintained by the contractor during monsoon or such period as herein before provided in clause 74 and that the
contractor has in all respect duly made up any subsidence and performed all his obligations under the contract, the
Engineer-in-Charge shall (without prejudice to the rights of the Owner to retain the provisions of relevant clause
hereof) give a certificate herein referred to as the final certificate to that effect. The contractor shall not be considered
to have fulfilled the whole of his obligations under the contract until Final Certificate have been given by the Engineer-
in-Charge notwithstanding any previous entry upon the work and taking possession, working or using of the same or
any part thereof by the owner.
85 CERTIFICATE FOR PAYMENTS AND EVIDENCE OF COMPLETION:
Except the final certificate, no other certificate or payments against a certificate or on general account shall be taken
to be an admission by the Owner of the due performance of the contract or any part thereof or occupancy or validity
of any claim by the contractor.
TAXES/DUTIES/INSURANCE
86. TAXES AND DUTIES:
The contractor agrees to and does hereby accept full and exclusive liability for the payment of any and all taxes, duties,
etc. now in force or hereafter Imposed, increased or modified, from time to time in respect of work and materials and
all contributions and taxes for unemployment compensation, insurance and old age pensions or annuities now or
hereafter imposed by any Central or State Government authorities which are imposed with respect to or covered by the
wages, salaries, or other compensations paid to the persons employed by the contractor and the contractor shall be
responsible for the compliance with all obligations and restrictions imposed by the Labour Law or any other law affecting
employer - employee relationship and the contractor further agrees to comply and secure the compliance by all sub-
contractors, with all applicable Central, State, Municipal and local laws and regulations and requirements of any Central,
State or Local Government agency or authority. Contractor further agrees to defend, indemnify and hold harmless from
any liability or penalty which may be Imposed by the Central, State of Local Authority by reason of any violation by
contractor or sub-contractor of such laws, regulations or requirements and also from all claims, suits or proceeding that
may be brought against the Owner arising under, growing out of, or by reason of the work provided for by this contract
by third parties, or by Central or State Government authority or any administrative sub-division thereof.
86.1 The vendor shall take steps viz. mention relevant GSTIN of BPCL in GST invoices and returns, uploading invoice in GSTR
1, payment of the tax liability on the said invoices and filing of Returns etc. and comply with all the requirements of
applicable laws including GST laws for the time being in force to enable the OWNER to avail tax credit/s including input
Deferment of GST Amounts shall be done for those vendors who have got instances of open mismatches due to non-
compliance. Open mismatches refer to cases whereby OWNER could not claim the GST Input Tax Credit in the month
of payment of invoice due to non-compliance/ delayed compliance by the VENDOR. Accordingly, Over and above any
payment term mentioned in the tender including that mentioned in the GPC/GCC, payment to VENDOR by OWNER for the
basic amount (i.e. amount excluding GST) shall be made as mentioned in GPC/GCC or as mentioned anywhere else in
the tender as applicable. However, GST amount of the Invoices shall be paid only after the amount gets reflected in
the return (GSTR-1 Return of outward supplies/GSTR-3B) submitted by the vendor on GSTIN portal (GSTR 2B of OWNER)
to the satisfaction of OWNER. Till such time GST amount with correct details is reflected in GSTIN portal to satisfaction of
OWNER, amount shall be withheld by OWNER.
Over and above, VENDOR is also required to issue e-invoice if the same is applicable to the OWNER. In absence of GST e-
invoice, any loss of Input Tax Credit to the OWNER shall be indemnified by the VENDOR.
Deferment of GST amounts to the vendors are subject to compliance of any applicable Act.
86.2 In case of vendors for whom deferment of GST amounts were not done, any loss or non-availability of input tax credit by
the OWNER due to non- compliance of applicable tax law including but not limited to GST laws in force or otherwise, on the
part of VENDOR, an amount equivalent to any tax liability accruing to the OWNER and/or to the extent of any loss accrued
to the OWNER due to the non-availability of input tax credit or any liability accrued to the OWNER shall either stand cancelled
or deducted from the payment due to the VENDOR or shall be reimbursed by the VENDOR as the case may be till such default
is either rectified or made good by the VENDOR and the OWNER is satisfied that it is in a position to claim valid input tax
credit within the timelines as per applicable laws.
86.3 Any cost, liability, dues, penalty, fees, interest as the case may be which accrues to the OWNER at any point of time on
account of non-compliance of applicable tax laws or rules or regulations thereof or otherwise due to default on the part of
VENDOR shall be borne by the VENDOR. An amount equivalent to such cost, liability, dues, penalty, fees, and interest as the
case may be shall be reimbursed by the VENDOR within 30 days. Any GST as may be applicable on such recovery of
amount shall also be borne by VENDOR and same shall be collected by the OWNER.
Contractor shall at his own expenses carry and maintain insurance with reputable insurance companies to the
satisfaction of the Owner as follows:
i) Employees State Insurance Act:
The Contractor agrees to and does hereby accept full and exclusive liability for the compliance with all obligations
imposed by the Employees State Insurance Act, 1948, and the contractor further agrees to defend, indemnify and
hold Owner harmless from any liability or penalty which may be imposed by the Central, State or Local Authority by
reason of any asserted violation by contractor or sub-contractor, of the Employee State Act, 1948 and also from all
claims suits or proceedings that may be brought against the Owner arising under, growing out of or by reason of the
work provided for by this contract whether brought by employees of the contractor, by third parties or by Central or State
Government authority or any political sub-division thereof.
The contractor agrees to filing, with the Employees State Insurance Corporation, the Declaration Forms and all
forms which may be required in respect of the contractor’s or sub-contractor’s employees whose aggregate
remuneration as fixed by the concerned authorities and who are employed in the work provided for or those covered
by ESI Act under any amendment to the Act from time to time. The contractor shall deduct and secure the agreement
of the sub-contractor to deduct the employee’s contribution as per the first schedule of the Employee State
Insurance Act from wages and affix the Employee’s contribution Cards at Wages payment intervals. The contractor
shall remit and secure the agreement of the sub-contractor to remit to the authorized bank, Employee’s State
Insurance Corporation Account, the Employee’s contribution as required by the Act. The contractor agrees to
maintain all Cards and records as required under the Actin respect of employees and the payments and the
contractor shall secure the agreement of the subcontractor to maintain such records. Any expenses incurred for the
contribution, making contribution or maintaining records shall be to the contractor’s or sub-contractor’s account.
The Owner shall retain such sum as may necessary, from the total contract value until contractor shall furnish
satisfactory proof that all contributions as required by the Employees State Insurance Act, 1948, have been paid.
ii) Workman’s Compensation and Employee’s Liability Insurance:
Insurance shall be effected for all the Contractor’s employees engaged in the performs of this contract, if any of the
work is sublet, the contractor shall require the sub-contractor to provide workman’s compensation and employer’s
liability Insurance for the latter’s employees if such employees are not covered under the contractors insurance.
iii) Any other Insurance Required Under Law or Regulations or by Owner:
Owner shall cover Project Material and Equipments under and over all Marine-cum-Erection Insurance Policy.
Contractor shall carry and maintain any and all other insurance which be required under any law or regulation from
time to time. He shall also carry and main any other insurance which may be required by the Owner.
iv) Automobile Liability Insurance:
Contractor shall take out an Automobile Liability Insurance to cover all risks to Owner for each of his vehicles plying on
works of this contract and these insurance shall be valid for the total contract period. No extra payments will be made
for this insurance. Owner shall not be liable for any damage or loss not made good by the insurance company, should
such damage or toss result from unauthorised use of the vehicle.
88. DAMAGE TO PROPERTY:
i) Contractor shall be responsible for making good, to the satisfaction of the Owner any loss of and any damage to all
structures and properties belonging to the Owner or being executed or procured or being procured by the Owner
or of other agencies within the premise all the work of the Owner, if such loss or damage is due to fault and/or the
negligence willful acts or omission of contractor, his employees, agents,representative or \ sub-contractor.
ii) The contractor shall indemnify and keep the Owner harmless of all claims for damage to property other than Owner’s
property arising under or by reason of this agreement if such claims results from the fault and/or negligence or willful
acts or omission of contractor, his employees, agents, representatives or sub-contractors.
LABOUR LAWS AND OTHER REGULATIONS
89 LABOUR LAWS:
i) No labour below the age of eighteen years shall be employed on the work.
ii) The contractor shall not pay less than what is provided under the Minimum Wages Act for the applicable
trade or category of workman to the worker engaged by him on the work and also ensure that any sub-
contractors engaged by him also pay not below the applicable minimum wages under the Act and hold the
company, indemnified in respect of any claims that may arise in respect or non-compliance with this
iii) The contractor shall observe all the formalities required under the provisions of the contract labour
(Regulation and abolition) Act 1970 and the rules made thereunder and as may be amended from time to
time. He shall pay the required deposit under the Act Appropriate to the number of workmen to be employed
by him or through sub-contractor and get him self registered under the Act. He shall produce the certificate
of registration granted by the Govt. authority under the Act to the company before commencement of work.
The company recognises only the contractor and not his sub-contractors under the provisions of the Act.
The contractor will have to submit daily a list of his employees, who will be entering the Company’s premises
for the work awarded. He will also keep his wage register available at all times as close to the work site as
possible and produce the same for inspection whenever required by designated Company officials. If the
company so desires, a deposit may be taken from the Contractor to be refunded only after the Company is
satisfied that all the workmen employed by the contractor have been fully paid for the period of work in
Company’s premises at least at rates equal to or better than wages provided for under the Minimum Wages
iv) The Contractor will comply with the provisions of the employee’s Provident Fund Act and the Family Pension
Fund Act as may be applicable and as amended from time to time. Contractor shall obtain their own
provident fund account number. Offer of the contractor who does not have provident fund account will be
liable for rejection.
v) The Contractor will comply with the provisions of the Payment of Gratuity Act 1972 as may be applicable
and as amended from time to time.
90 IMPLEMENTATION OF APPRENTICES ACT 1961:
The Contractor shall comply with provisions of the Apprentices Act 1961 and the Rules/orders issued thereunder from
time to time. If he fails to do so, his failure will be breach of the contract and the Engineer-in-Charge may, at his
discretion, cancel the contract. The contractor shall also be liable for any pecuniary liability arising on account of any
violation by him of the provision of the act.
91 CONTRACTOR TO INDEMNIFY THE OWNER:
i) The contractor shall indemnity the owner and every member, officer and employee of the Owner, also the
Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs, and expenses
whatsoever arising out of or in connection with the matters referred to in clause 86 and all actions/
proceedings, claims, demands, costs and expenses which may be made against the Owner for or in respect
of or arising out of any failure by the contractor in the performance of his obligations under the contract
documents. The Owner shall not be liable for or in respect of any demand or compensation payable by law
in respect of or in consequence of any accident or injury to any workmen or other person in the employment
of the contractor or his sub-contractor and contractor shall indemnify and keep indemnified the Owner
against all such damages and compensations and against all claims, damage, proceedings, costs, charges
and expenses whatsoever, thereof or in relation thereto.
ii) Payment of Claims and Damages:
Should the Owner have to pay any money in respect of such claims or demands as aforesaid the amount
so paid and the costs incurred by the Owner shall be charged to and paid the Contractor and the contractor
shall not be at liberty to dispute or question the rig of the Owner to make such payments notwithstanding
the same may have been made without his consent or authority or in law or otherwise to the country.
In every case to which by virtue of the provisions of Section 12, sub-section (I) of workmen’s compensation
Act 1923 or other applicable provisions of workmen’s Compensation Act any other Act, the Owner is obliged
to pay compensation to a workmen employed by contractor in execution of the works, the Owner will
recover from the contractor the amount of compensation so paid and without prejudice to the rights of
Owner under Section 12 sub-section (2) of the said Act. Owner shall be at liberty to recover such amount
or any part thereof by deducting it from the security deposit or from any sum due to the contractor whether
under the contract or otherwise. The Owner shall not be bound to contest any clime made under Section
12, sub-section (I) of the said Act except on the written request of contractor and upon his giving to the
Owner full security for all costs for which the Owner might become liable on consequence of contesting
iii) Employment Liability:
a) The contractor shall be solely and exclusively responsible for engaging or employing persons for
the execution of work. All employees engaged by the contractor shall be on his/ their payroll and
paid by him/ them. All disputes or differences between the contractor and his/ their employees
shall be settled by him/ them. Owner has absolutely no liability whatsoever concerning the
employees of the contractor. The contractor shall indemnify owner against all loss or damage or
liability arising out of or in the course of his/ their employees. The contractor shall make regular
and full payment of wages without giving any complaint by any employee of the contractor or
his sub-contractor regarding non-payment of wages/ salaries or other dues. Owner reserves the
right to make such payments directly, to such employee or sub-contractor of the contractor and
recover the amount in full from the bills of Contractor, and the contractor shall not claim any
compensation or reimbursement thereof. The Contractor shall comply with the Minimum Wages
Act applicable to the area with regard to payment of wages of his employees and also of
employees of his sub-contractor.
b) The Contractor shall advise in writing to all of his employees and the employees of his sub-
contractor as follows:
It is fully understood that your appointment and/ or deployment is only in connection with the
owner and it does not give you any right of claim for employment by owner.
92 (a) HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS:
In respect of all labour directly employed in the works for performance of the contractor’s par this agreement, the
contractor shall comply with or cause to be complied with all the rules and regulations of the local sanitary and other
authorities or as framed by the Owner from time to time for the protection of health and sanitary arrangements for
(b) MEDICAL FITNESS CERTIFICATION :
Contractor shall follow guidelines for medical fitness certification of workers employed for working at height more
than 30 metres using temporary structures.
93 SAFETY REGULATIONS:
i) In respect of all labour, directly or indirectly employed In the work for the performance of contractor’s part
of this agreement, the contractor shall at his own expenses arrange for all safety provisions as per safety
codes of C.P.W.D. Indian Standard Institution, the Electricity Act, The Mines Act and any such other acts
ii) The Contractor shall ensure that he, his sub-contractor and his, or their personnel or representatives shall
comply with all Fire / Safety regulations issued from time to time by the Company or otherwise howsoever
and should any injury resulting in death or not or loss / or damage due to Fire to any property or a portion
thereof, occurred as a result of failure to comply with such regulations, the contractor shall be held
responsible for the consequences thereof and shall keep the company harmless and indemnified.
94 DISPUTE RESOLUTION:
i) In the event of a dispute arising out of or in connection with this contract, including any question regarding
its existence, validity or termination, the parties shall first seek settlement of that dispute by mediation in
accordance with BPCL Mediation Scheme, 2025. The venue of mediation proceedings shall be at
_____________(Region/HQ from where the tender has been floated). BPCL Mediation Scheme 2025 can
be accessed at https://www.bharatpetroleum.in/images/files/bpcl-mediation-scheme-2025.pdf
ii) If the dispute is not settled by mediation in terms of BPCL Mediation Scheme, 2025, then the dispute shall
be referred for adjudication through a court of competent jurisdiction in India.
iii) The governing law of the contract shall be the substantive laws of India.
iv) Neither party shall be entitled for any pre-filing interest, i.e., from the date of cause of action till the date
of filing of civil suit. Parties agree that any claim for any such interest shall not be considered and shall be
void. The Civil Court/Commercial Court shall have no right to grant any pre-filing interest to either of the
v) In the event of any dispute or difference relating to the interpretation and application of the provisions of
commercial contract(s) between Central Public Sector Enterprises (CPSEs)/Port Trusts inter se and also
between CPSEs and Government Departments/Organisations (excluding disputes relating to Income Tax,
Customs & Excise Departments*), such dispute or difference shall be taken up by either party for its
resolution through AMRCD as mentioned in DPE OM no. 05/0003/2019-FTS-10937 dated 14th December,
2022 and the decision of AMRCD on the said dispute will be binding on both the parties.
(* The exclusion would also include disputes concerning GST, State level Sales Tax / VAT etc; though not
mentioned explicitly).
95 JURISDICTION:
The contractor shall be governed by the Laws in force in INDIA. The contractor hereby submits to the jurisdiction of
the Courts situated at Mumbai/(Ernakulam-in the case of Kochi Refinery), for the purpose of actions and proceedings
arising out of the contract and the courts at Mumbai/(Ernakulam-in the case of Kochi Refinery), only will have
jurisdiction to hear and decide such actions and proceedings.
96 ORDER OF PRECEDENCE FOR WORKS / SERVICES CONTRACTS:
1. Contract Agreement (in GCC)
2. Detailed letter of Acceptance along with its enclosures
3. Letter of Award / Fax of Acceptance
4. Job Specifications (specific to particular job only)
6. Special Conditions of Contract (SCC)
7. Technical Specifications
8. Instructions to Bidders
9. General Conditions of Contract (GCC)
10. Other Documents
Additionally, any variation or amendment / change order issued after signing of formal contract shall take precedence
over respective clauses of the formal contract and its Annexures.
97 LIMITATION OF LIABILITY
The aggregate total liability of the Contractor to Owner under the Contract shall not exceed the total Contract Price,
except that this Clause shall not limit the liability of the Contractor for following:
(a) In the event of breach of any Applicable Law;
(b) In the event of fraud, willful misconduct or illegal or unlawful acts, or gross negligence of the Contractor or any
person acting on behalf of the Contractor; or
(c) In the event of acts or omissions of the Contractor which are contrary to the most elementary rules of diligence
which a conscientious Contractor would have followed in similar circumstances; or
(d) In the event of any claim or loss or damage arising out of infringement of Intellectual Property; or
(e) For any damage to any third party, including death or injury of any third party caused by the Contractor or any
person or firm acting on behalf of the Contractor in executing the Works. Neither Party shall be liable to the other Party
for any kind of indirect or consequential loss or damage like, loss of use, loss of profit, loss of production or business
interruption which is connected with any claim arising under the Contract.
98 POLICE VERIFICATION OF CONTRACT STAFF AND TRANSPORT CREW AT LOCATION:
The Contract staff should submit the following documents for enabling them to enter the location:
i) Police verification certificate issued by the police (PVC)
ii) Photocopy of Aadhaar Card (Original to be cross checked)
iii) Assurance certificate from the Vendor / Contractor /transporter
The contractor shall not at any time do, cause or permit any nuisance on site or do anything which shall cause
unnecessary disturbance or inconvenience to Corporation, tenants or occupiers of other properties near the site and to
the general public.
100 BUILDING AND OTHER CONSTRUCTION WORKERS CESS:
i) Bidders to note that under Building and other Construction Workers Welfare Act (Re&CS) Act 1996, Cess is applicable
to contracts executed outside Factory Area (e.g. construction of new industrial installation, office & residential
buildings etc.) as per the provisions applicable under ‘The Building and Other Construction Workers Welfare Cess
ii) The contractor must be registered with the concerned authorities under the Building and other Construction Workers‟
(RE&CS) Act, 1996 or in case of non-registration; the contractor should obtain registration within one month of the
award of contract.
iii)The contractor shall be responsible to comply with all provisions of the Building and Other Construction
Workers‟ (RE&CS) Act, 1996, the Building and other Construction Workers‟ Welfare Cess Act, 1996, the Building
and other Construction Workers‟ (RE&CS) Rules, 1998 and the Building and other Construction Workers Welfare
iv) Cess, as per the prevailing rate (presently 1%), shall be deducted at source from bills of the contactors by the
Engineer-in-Charge and remitted to the “Secretary, Building and other Construction Workers Welfare Board” of the
concerned State.
v) The contactor shall be responsible to submit final assessment return of the Cess amount to the assessing officer
after adjusting the Cess deducted at source.
MEMORANDUM OF AGREEMENT
An agreement made this day of 20 between BHARAT PETROLEUM
CORPORATION LIMITED a Company Incorporated in India and having its registered office at Ballard Estate,
Mumbai, (herein after referred to as ‘the Company’ which expression shall include its heirs, legal representatives,
successors and permitted assignees) of the one part, and
(herein after referred to as “The Contractor” which expression shall include its heirs, legal representatives,
successors and permitted assignees) of the other part, whereby it is agreed:-
1. The Contractor shall carry out and complete the work as mentioned in the Purchase order/Contract No. dated
, (hereinafter referred to as “the work”) for the Company at its specified site to its complete satisfaction in
accordance with the specifications, schedule of rates and plans attached as per Purchase order/Contract and with
the instructions given from time to time, by the Company’s authorized engineer under whose supervision the
work shall be-executed. The parties hereto agree that this agreement shall be effective from the date of the
aforesaid Purchase Order/Contract.
2. Inspection of site: The Contractor has been given an opportunity before or at the time of the entrusting of the
work to him of making an inspection of the site to set at rest any doubt he may have had about the difficulties
attending his offer, and any difficulties which may be met with by him in the course of the execution of the work
shall neither relieve him from fulfilling the terms of this Agreement, nor entitled him to claim extra payment or
an extension of the period stipulated for the completion of the work, except where it will be agreed by the
Company’s authorized Engineer that such difficulties could not have been foreseen.
3. Supply of Labour and Materials: The Contractor shall furnish all labour, materials, equipment or tools necessary
for the construction of the work, except such materials, equipment or tools as will be supplied by the Company
and are detailed in Purchase order/Contract. The contractor will assume full responsibility for the protection and
safety of the work during its construction. The details and dimensions shown on the said plans referred to in the
Purchase order/Contract shall be strictly adhered to by the contractor and no alterations shall be made therein
unless previous sanction thereto has been given in writing by the Company.
(a) The Contractor shall prepare detailed and shop drawings and any other data required.
(b) All materials supplied by the Contractor shall be of the best quality. The Contractor shall at his own cost
arrange for and/or carry out any test of materials, which the Company’s authorized Engineer may
(c) The Contractor shall at the request of the Company’s authorized Engineer immediately dismiss from the
work any person employed thereon who, in the opinion of the Company’s authorized Engineer, is
unsuitable or incompetent or who, has been guilty of misconduct, and such person shall not again be
employed or allowed on the works without the permission of the Company, in writing.
4. E. & O. E. No advantage is to be taken either by the Company or the Contractor of any clerical error or mistake,
which may occur in the specification, schedule of rates, plans, tender or any other papers supplied to or by the
contractor in connection with the work.
5. Damage on account of Incomplete work: The Contractor shall commence the work and shall complete the work
as mentioned in Purchase order/Contract failing which the Contractor shall pay or allow to the Company to recover
as liquidated damages, at the rate of minimum 0.5% per week of delay or part there of up to a maximum of 5% of
the total contract value, if Liquidated damages clause is made applicable in the contract. Such damages may be
deducted by the Company from any amount due to the contractor; otherwise they shall be recoverable by lawful
6. a) Determination of the Agreement: The company shall, at any time, be entitled to determine and terminate the
contract, if in the opinion of the company, the cessation of the work becomes necessary owing to paucity of funds
or for any other cause whatsoever. On such determination / termination, the cost of approved materials,
brought by the contractor and lying at the site, at current market rates as verified and approved by company’s
engineer and of the value of the work done to date by the contractor shall be paid for in full at the rate specified
in the contract. A notice in writing from the company to the contractor of such determination and termination
and reasons therefore shall be the conclusive proof of the fact that the contract has been so determined and
terminated by the company.
Should the contract be determined as above and the contractor claims payment to compensate expenditure
incurred by him in the expectation of completing the work, the company shall consider and admit such claim as
are deemed fair and reasonable and are supported by the vouchers to satisfaction of the engineer-in-charge. The
company’s decision on the necessity and propriety of such expenditure shall be final and conclusive and binding
on the contractor.
The contractor shall not be entitled to get any possible loss of profit that he could have earned had the contract
been not determined / terminated under the above clauses of this article.
b) Termination/Offloading: The contractor fully understands that timely completion of the work as per the
schedule is of paramount necessity as otherwise it would lead to adversely affecting the schedules of other
works/project with resultant financial and other losses to the Company. In view of this, the contractor
unconditionally agrees and binds himself to be liable for all the consequences for non-completion of the work
within the stipulated time.
In case a situation is brought about by the contractor warranting termination/off-loading of the whole or any part
of the work for any reason whatsoever, the Company shall have the liberty and right to entrust/engage/award
the work so terminated off loaded at the risk and cost of the contractor to any other agency/contractor by adopting
any mode of inviting tenders, i.e. open/limited/single party/negotiation basis etc. in order to ensure completion
of the work as per the schedule or at the quickest possible time.
7. Defective Work / Materials: If the work done by the Contractor or any part there of shall be found defective in
workmanship or by reason of bad or inferior materials used, then in such case he shall at his own risk and cost
without delay, demolish all such defective work and rebuild or replace the same in a satisfactory manner. The
Company may, if necessary, at the cost and risk of the Contractor, temporarily stop all other activities by the
Contractor in connection with the work until such time as the defective work has been rebuilt or replaced at the
Contractor’s cost. In case of default on the part of the contractor to remove defectives work and rebuild or replace
the same without delay and in a manner satisfactory to the Company, the Company shall be entitled to employ
another Contractor or its own workman to carry out the removal and rebuilding or replacing at the risk and cost
of the contractor.
8. Substitution of Contractor : If the Company finds it necessary to employ a person or persons for the purposes
provided in clauses 6 (b) and 7 above, then the Company may deduct and retain from out of the sums due to
the contractor all such amounts as they may require to pay or to reimburse themselves there from in respect of
the costs and expenses which they have incurred in completing the work and or in removing defective work and
rebuilding or replacing the same in a manner satisfactory to the Company and if such amounts be more than the
sums due or thereafter becoming due to the Contractor, than the balance, shall be a debt recoverable from the
Contractor by the Company. The Contractor shall not in any manner do or cause to be done any act, matter or
things whatsoever to prevent the person or persons so employed by the Company from removing defective work
and re-building or replacing the same in a manner satisfactory to the Company and/or from, completing the work
in the manner aforesaid.
9. Removal of Material: On the Determination of the Agreement as referred to in Clause 6, the Contractor shall at
his own risk and cost remove from site within Seven days all his materials, equipment and tools. It is agreed that
in case of such determination the company shall be entitled to purchase from the Contractor such materials as
will be approved by the Authorized Engineer of the Company at the prices then current. If the Contractor does not
remove the other materials, equipment and tools which he has been asked to remove within the time prescribed
as aforesaid, the Company may remove and sell the same holding the proceeds less the cost of storage, removal
and sale to the credit of the Contractor. Should Company incur any loss in respect of the sale, it shall be entitled
to recover same from the Contractor.
10. Inspection of work: Inspection will be made periodically during the progress of the work by the authorized
Engineer of the Company and all work performed must be of acceptable quality of which the said Engineer-in-
Charge will be the sole judge.
11. Supervision: The Contractor shall during the whole time the work is in progress, employ one or more competent
and technical English speaking Supervisors acceptable to the Company’s authorized Engineer, one of whom at
least shall be in constant attendance at the site while persons are at work there. Any directions, explanations,
instructions, or notices in connection with the work given by the Company’s authorized Engineer to these
Supervisors shall be deemed to have been given to the Contractor.
12. Payment: The Company, in consideration of the contractor carrying out and completing the said work at the
Company’s said site, to the satisfaction of the Company, shall pay the contractor as per the said schedule of
Rates, subject to deductions, retentions and abatements, if any to be made therefrom in accordance with the
provisions of this Agreement. During the progress of the work and provided the work is progressing according to
the time-table laid down to the contractor, the contractor shall be entitled once a month to receive advance
payment on the above mentioned sum proportionate to such part of the work as shall have been executed during
the preceding month but only after such part of the work as has been executed has been inspected and approved
by the Company’s authorized Engineer. From such interim payments each time 10% will be withheld as Security
deposit and this 10% will be paid to the Contractor after the defect liability period, provided that any defects
appearing during that period are corrected by him. OR
100% payment will be made on the basis of actual executed quantities after satisfactory completion and due
certification by BPCL Engineer-in-charge. In lieu of 10% Retention money towards Security deposit, contractor
shall submit bank guarantee / Insurance Surety Bond of equivalent amount of retention money (10% of contract
value) before submission of 1st Running Account (RA) bill valid for defects liability period specified. Further, the
Bank Guarantee / Insurance Surety Bond shall have a claim period of six months beyond the date of expiry, and
the same shall be mentioned clearly in the Bank Guarantee / Insurance Surety Bond.
13. Defects after Completion: Any defects which may appear within the defect liability period specified shall, upon the
directions in writing of the Company and within such reasonable time as shall be specified therein be amended and
made good by the Contractor, at his own cost unless the Company shall decide that the Contractor will be paid
for such amending and making good, and in case of default on the Contractor’s part, the Company may amend
and make good or have amended and made good such defects and all damages, losses and expenses consequent
thereon, incidental to those shall be borne by the Contractor and such damages, losses and expenses shall be
recoverable from him by the Company or may be deducted by the Company from any moneys due to or thereafter
becoming due to the Contractor. Alternatively, the Company may, in lieu of such amending and making good by
the Contractor elect to deduct from any moneys due or thereafter becoming due to the Contractor a sum to be
determined by the Company sufficient to cover the cost of amending and making good such defects, and in the
event of the amount withheld in accordance with Clause 12 being insufficient, recover the balance from the
Contractor together with any expenses the Company may have incurred in connection with such recovery. Should
any defective work have been done or bad inferior materials supplied by any Sub-Contractor employed on the
work, has been approved by the Company as provided in Clause 15, the Contractor shall be liable to amend and
make good in the same manner as if such work or materials had been done or supplied by the Contractor. The
Contractor shall remain liable under this Clause notwithstanding the signing by the Company’s authorized Engineer
of any certificate or the passing of any account.
14. Alterations: The Company reserves the right at any time to alter any quantities of any item indicated in the
Purchase order/Contract, in which case the total amount payable to the Contractor shall be less or higher,
proportionate with the reduction or increase in quantity of such item, allowance for which will be made at the
Contractor’s agreed rates.
15. Subletting Agreement: The Contractor shall not sublet or assign the work or any part thereof to another party
without the written consent of the company and no such subletting or assignment shall relieve the contractor from
the full and entire responsibility of his obligation under this Agreement.
16. Cancellation: The Company shall at any and all times during the period stipulated for the work, has the right
forthwith to cancel this agreement by giving written notice thereof to the Contractor and in such case the
Contractor shall be paid for such part of the work as has been executed by him up to the date of cancellation, on
the basis of schedule of rates as per Purchase order/Contract and shall be reimbursed by the Company for the
cost and expenses incurred by him but which would now be wasted as a direct consequence of the cancellation
of the Agreement.
17. Workmen’s Compensation Liability: The Contractor shall hold the Company harmless and indemnified from and
against all claims, costs and charges for which the Company shall be liable under the Workmen’s Compensation
Act, 1923 and any amendments thereof and the expenses to which it shall be put thereunder, both in respect of
personal injuries (within the meaning of the said Act) to the employees and servants of the Contractor or Sub-
Contractors, (if any), arising out of, or occasioned during the currency of this agreement through the acts or
omissions, whether due to negligence or not of the Contractor, Sub-Contractor and/or Company and/or their
respective servants and employees and also in respect of the personal injuries (within the meaning of the said
Act) to the servants and employees of the Company arising out of, or occasioned through the acts and omissions
whether due to negligence or not of the Contractor, Sub-Contractor and or their servants and employees in
carrying out any of the provisions of this Agreement. This indemnity shall be in addition to and not in lieu of any
indemnity to which the Company shall be entitled in law. The Contractor shall at his own expense effect and
maintain, until the completion of the work, with an approved office a Policy of Insurance in the joint names of
the Company and the Contractor, against such risks and deposit such Policy or policies with the Company from
time to time during the currency of this Agreement. The Contractor shall be responsible for anything not included
in the Insurance Policies above referred to and also for all other damage to person or property arising out of or
incidental to the negligent or defective carrying out of this agreement and shall keep the Company harmless and
indemnified. He shall also indemnify the Company in respect of any costs, charges or expenses arising out of any
claim or proceedings and also in respect of any award of compensation or damages arising therefrom. The
Company shall be entitled to deduct the amount of any damages compensation costs, charges and expenses
arising or accruing from or in respect of any such claim or damages from any sum or sums due or thereafter
becoming due to the Contractor.
18. Safety Regulation: The Contractor shall ensure that he/his Sub-Contractor and his, or their personnel or
representatives shall comply with all safety regulations issued from time to time by the Company or otherwise
howsoever and should any injury resulting in death or not or damage to any property occur as result of failure to
comply with such regulations the Contractor shall be held responsible for the consequences thereof, shall keep
the Company harmless and indemnified.
19. Dispute Resolution:
19.1 In the event of a dispute arising out of or in connection with this contract, including any question regarding
its existence, validity or termination, the parties shall first seek settlement of that dispute by mediation in
accordance with BPCL Mediation Scheme, 2025. The venue of mediation proceedings shall be at
_____________(Region/HQ from where the tender has been floated). BPCL Mediation Scheme 2025 can be
accessed at https://www.bharatpetroleum.in/images/files/bpcl-mediation-scheme-2025.pdf
19.2 If the dispute is not settled by mediation in terms of BPCL Mediation Scheme, 2025, then the dispute shall
be referred for adjudication through a court of competent jurisdiction in India.
19.3 The governing law of the contract shall be the substantive laws of India.
19.4 Neither party shall be entitled for any pre-filing interest, i.e., from the date of cause of action till the date of
filing of civil suit. Parties agree that any claim for any such interest shall not be considered and shall be void. The
Civil Court/Commercial Court shall have no right to grant any pre-filing interest to either of the parties.
19.5 In the event of any dispute or difference relating to the interpretation and application of the provisions of
commercial contract(s) between Central Public Sector Enterprises (CPSEs)/Port Trusts inter se and also between
CPSEs and Government Departments/Organisations (excluding disputes relating to Income Tax, Customs & Excise
Departments*), such dispute or difference shall be taken up by either party for its resolution through AMRCD as
mentioned in DPE OM no. 05/0003/2019-FTS-10937 dated 14th December, 2022 and the decision of AMRCD on
the said dispute will be binding on both the parties.
(* The exclusion would also include disputes concerning GST, State level Sales Tax / VAT etc; though not
mentioned explicitly).”
20. Jurisdiction:
The contractor shall be governed by the Laws in force in INDIA. The contractor hereby submits to the jurisdiction
of the Courts situated at Mumbai/(Ernakulam-in the case of Kochi Refinery), for the purpose of actions and
proceedings arising out of the contract and the courts at Mumbai/(Ernakulam-in the case of Kochi Refinery), only
will have jurisdiction to hear and decide such actions and proceedings.
21. Minimum Wages:
The Contractor, his executors and administrators (and in the case of a Limited Company, its successors and
assigns) shall hold the Company harmless and indemnified from and against all claims, costs and charges, for
which the Company shall be liable under the Minimum Wages Act, 1948, the Contract Labour (Regulation and
Abolition) Act, 1970 and any amendments or modifications thereof, and all expenses it shall be put thereunder
through the acts or omissions whether willful or not on the part of the Contractor. This indemnity shall be in
addition to and not in lieu of, any indemnity to which the Company shall be entitled in law.
22. Employees State Insurance: This Contractor hereby admits that he is fully aware of his responsibilities under the
Employees State Insurance Act, 1948, as an immediate employer of the employees engaged by him for the
execution of this contract which he agrees to discharge. The Contractor acknowledge the statutory right of the
company (as a Principle Employer) to recover the amount of the contributions, paid by it in the first instance in
respect of the employees employed by or through him (the Contractor), as well as the employee’s contribution,
if any, either by deduction from any amount payable to him by the Company under any contract or as debt
payable by him to the Company.
In witness where of the said contracting parties have set their hands.
For Bharat Petroleum Corporation Ltd. For Bharat Petroleum Corporation Ltd.
Contractor’s witness - Signature Contractor’s Signature
Name & Address:- Name & Address:-
PROFORMA OF BANK GUARANTEE
(On non-judicial paper of appropriate value)
FOR EARNEST MONEY / SECURITY DEPOSIT TOWARDS PERFORMANCE
Bharat Petroleum Corporation Ltd.
M/s. have taken tender for the work CRFQ No/PO
for Bharat Petroleum Corporation Ltd.
The tender Conditions of Contract provide that the Contractor shall pay a sum of Rs.
(Rupees ) as earnest money/security deposit in the form therein mentioned. The form
of payment of earnest money/security deposit includes guarantee executed by Scheduled Bank, undertaking full responsibility to indemnify
Bharat Petroleum Corporation Ltd. in case of default.
The said have approached us and at their request and in consideration of the premises
we having our office at have agreed to
give such guarantee as hereinafter mentioned.
1. We hereby undertake and agree with you that
if default shall be made by M/s. in performing any of the terms and
conditions of the tender or in payment of any money payable to Bharat Petroleum Corporation Ltd. We shall on demand pay to
you in such matter as to you may direct the said amount of Rupees only or such portion
thereof not exceeding the said sum as you may from time to time require.
2. You will have the full liberty without reference to us and without effecting this guarantee postpones for any time or from time to
time the exercise of any of the powers and rights conferred on you under the contract with the said and to
enforce or to for bear from endorsing any power of rights or by reason of time being given to the said which under law relating
to the sureties would but for provision have the effect of releasing us.
3. Your right to recover the said sum of Rs. (Rupees ) from us
in manner aforesaid will not be affected or suspended by reason of the fact that any dispute or disputes have been raised by the
said M/s. and/or that any dispute or disputes are pending before any officer,
tribunal or court.
4. The guarantee herein contained shall not be determined or affected by the liquidation or winding up, dissolution or change of
constitution or insolvency of the said but shall in all respects and for all purposes be
binding operative units payment of all money due to you in respect of such liabilities is paid.
5. Our liability under this guarantee is restricted to Rupees Our guarantees shall remain
in force until unless a suit or action to enforce a claim
under Guarantee is filed against us within six months from
(which is date of expiry of guarantee) all our rights under the said guarantee shall be
forfeited and shall be relieved and discharged from all liabilities thereunder.
6. We have power to issue this guarantee in your favour under Memorandum and Articles of Association and the undersigned has
full power to do under the Power of Attorney dated granted to him by the Bank.
Yours faithfully
Bank by its Constituted Attorney Signature of a person duly authorized to sign on behalf of the
Proforma of Insurance Surety Bond towards Bid Security (EMD) / Performance Security
[To be stamped in accordance with Stamp Act of India]
Insurance Surety Bond No. Date
[Bharat Petroleum Corporation Limited]
In accordance with Invitation for Bids under your Tender No. & date…………………, M/s...............................[Bidder’s Name] .................................
having its Registered / Head Office at ............................................................. (hereinafter called the 'Bidder') wish to participate / have been
awarded [as the case may be] in the said tender for ............................. [Procurement description / Tender Title].
As an irrevocable Insurance Surety Bond against Bid Security (EMD) / Performance Security [as the case may be] for an amount of
................................................ [EMD / Performance Security amount] and remain in full force for a period of ………… (days) i.e. up to [Validity
Date] from the Bid Due Date and with an additional claim period of ……………(days) i.e. up to [Claim Period Validity Date] required to be submitted
by the Bidder as a condition precedent for participation in the said bid / award of contract [as the case may be] which amount is liable to be forfeited
on the happening of any contingencies as mentioned under the Bidding Documents / Contract / LoA.
We, the ......................... [Name of the Insurer] registered under IRDAI having our Head Office at ...................................[Address of the Insurer]
guarantee and undertake to pay immediately on demand by Bharat Petroleum Corporation Limited (hereinafter called the 'Beneficiary') the amount
of .................................. [EMD / Performance Security amount] without any reservation, protest, demand and recourse. Any such demand made
by the Beneficiary shall be conclusive and binding on us irrespective of any dispute or difference raised by the Bidder and / or any right / remedy
available to the bidder in terms thereof.
This Insurance Surety Bond shall be unconditional as well as irrevocable and shall remain valid up to ................ [Claim date]. If any further extension
of this Insurance Surety Bond is required, the same shall be extended to such required period on receiving instructions from M/s
............................................ [Bidder's Name] on whose behalf this Insurance Surety Bond is issued.
The Insurer declares that it has power to issue this Surety Bond and discharge the obligations contemplated herein, the undersigned is duly authorised
and has full power to execute this Surety Bond for and on behalf of the Insurer.
The Surety Bond shall not be affected by any change in the constitution or winding up of the Bidder or the Insurer or any absorption, merger or
amalgamation of the Bidder or the Insurer with any other person.
In witness where of the Insurer, through its authorised officer, has set its hand and stamp on
(Designation with Insurer Stamp)
Contact Details & Address of Surety Insurer for verification:
Name (Official): …………………
Branch Address:……………
Telephone No.:…………
Mobile No:………….
E-mail:………………..
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
25416.pdf
pdf • 5.03 MB
BUDGETDOC_25416.pdf
pdf • 5.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .