Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
28 Sept 2026, 6:00 pmDue today
Executive Engineer, Gir Somnath Irrigation Division, Veraval Ishvar Complex, 3rd Floor, A-Wing, Opp. Reliance Mall, Veraval-Junagadh Road, Veraval-362265
Construction Of Two New Checkdam At Village Nana Samadhiyala Taluka Gir Gadhada & Ambaliyala Taluka Veraval In Gir Somnath District.
343089
Tender Notice No-19 2026-27
Open
Civil - All
Works
Gir Somnath
8 documents required · 8 mandatory
₹3,600
Executive Engineer, Gir Somnath Irrigation Division,Veraval
₹1.3 L
8 Sept 2026
8 Sept 2026
8 Sept 2026
28 Sept 2026
8 Sept 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to
Bidder, Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be
the actual quantities of work ordered and carried out, as measured by the
Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities, where applicable, and otherwise at
such rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is other wise provided under the Contract, include all construction al
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set
out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities,
whether quantities are stated or not. The cost of Items against which
Contractor has failed to enter a rate or price shall be deemed to be covered by
other rates and prices entered in the Bill of Quantities (in case of Item rate
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates
and prices entered for the related items of Work.
7. General direction and descriptions of work and material sare not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each it emin the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for this work. For building works specifications for building are to
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Item Of excavation in Hard rock is to be operated as per tender item and hard
rock received shall be issued to contractor at the SOR rate Rs.224.08 per cum
as per operated quantity. The Royalty if any shall be paid by contractor on such
quantity of hard rock to relevant department the stuff of hard rock irrespective
of void or quarry spalls shall be taken by contractor. The excavated hard rock
fully on UCR to contractor.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
CD-1 CD-2 Total
Description of Item (with brief Rate
Sr. Quantities Quantities Quantities Amount
specification and reference to book of Unit (Without
No. (Nana (Ambaliyala) (Without GST)
specifications) GST)
Dismantling C.C. foundation or flooring 101.000 0.000 101.00 Cum 828.00
sorting & stacking useful and unuseful
material in lead upto 200 mt as directed
Excavation in all sort of strata and 1009.000 66.700 1075.70 Cum 79.00
formations incl. depositing the unusefull
excavated stuffas and where directed incl
2-A sorting and stacking useful materials as
directed up to 200 m. lead and all lifts etc.
complete incl. dewatering.(A) IN
OVERBURDEN INCL. HARD MURRUM.
Excavation in all sort of strata and 1514.00 1267.380 2781.38 Cum 176.00
formations incl. depositing the unusefull
excavated stuffas and where directed incl
2-B sorting and stacking useful materials as
directed up to 200 m. lead and all lifts etc.
complete incl. dewatering.(B) IN SOFT
Providing,cutting,bending,binding and 12.53 13.590 26.12 MT 76574.00
fixing in position as per drawing .TMT BAR
, reinforcement for R.C.C. works and
anchor bars incl cost of black annealed
3 to 18 BWG M.S.. Wire etc.complete with
all lead and lift.
Prov. & Laying in position cement concrete 1385.00 1179.180 2564.18 Cum 3423.00
using cement , sand and crushed metal
coarse aggregate by mass and machine
mix for PCC/RCC including necessary
formworks compaction by vibrator,curing
as directed with all lead & lift etc complete.
(Excluding cost of steel ) FOR .BODY
WALL, APRON, TRAINING WALL, SIDE
WALL, SPLAY WALL, KEY WALL, CUT
4/C) Controlled Concrete grade M-15 and
Providing and fixing in position 100/110 39.68 17.000 56.68 R.M. 358.00
mm dia PVC Pipe weep holes in the
5 retaining walls/sidewall/abt etc
Back filling with appropriate excavated 460.00 0.000 460.00 Cum 84.00
material behind the structures or refilling
the trenches with excavated useful
6 material including watering ramming,
consolidation etc complete with all lead
Providing and laying dry rubble pitching 208.00 86.400 294.40 Sqmt 723.00
with 20 cms gravel/metal and 20 cms
sand layers as base of inverted graded
7 filter and without header stone but
incl.hand packing trimming & dressing of
slopes etc complete.
B) 45 cms thick stone pitching
Providing and laying graded filters of 20.00 8.880 28.88 Cum 530.00
sand,gravel/metal and over size metal (
8 100 to 150 mm) behind the retaining wall
& wing walls as directed as per approved
drawing with all lead and lifts etc complete.
Providing and fixing in position white 1.00 1.000 2.00 No 1350.00
marble plate of size 45x45x1.8 cm incl
9 ingraving the letters as per drawing/as
directed etc complete.
Excavation for deepening of pond/check 7223.00 652.800 7875.80 Cum 68.00
dam including depositing excavated
10 material Lead up to 1 Km. With all lift.etc
complited as per instruction of engineer in
Providing and laying STONE LOANCHING 252.00 0.000 252.00 Cum 765.00
APRON by using 50% stone which having
11 weighing not less than 40 Kg or as
specified incl hand packing and filling the
interstices by spouls etc complete with all
Care & diversion of river/creek incl. 7029253.66 5436842.520 12466096.18 Job 0.01
required dewatering during construction of
Body wall and allied works as prescribed
and directed etc. complete.
Dismantling of RCC work viz. slab, beam, 0.00 260.800 260.80 Cum 1362.00
lintel, barrel, staircase, etc. including
removing the steel from the dismantled
13 portion without damage to reinforcement
sorting and stacking of useful and unuseful
material from the dismantled material as
directed etc comp.
Back filling with selected earth brought 0.00 88.940 88.94 Cum 141.00
from out side borrow area excavated
14 useful material including watering
ramming, consolidation by hand temping
and all lead and lift etc complete.
I/We am/are willing to carry out the work at….......................% above/below percent (Should be written in figures and words) of the estimated
rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Description of Item (with brief
specification and reference to book Quantity Unit Amount
of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… By
(C)Net Tendered Amount (A-B) (in figure) ……………………………… EE
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which
no extra payment shall be made.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analys` is Standard Cement Consumption has been taken as per Govt. G.R.: No. MIS 102010/17/K1, dtd.
30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Gir Somnath Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Two C.D. Ambaliyala And Nana Samadhiyala.pdf
BOQ.pdf
Drawing.pdf
Tender Notice No.19 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .