Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | RAJESH KUMAR S L1 |
|---|---|---|---|---|
| 1.00works | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 497.25 | cum | 254.8 ₹1,26,699.3 Lowest |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 435 | cum | 314.97 ₹1,37,011.95 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 21.79 | sqm | 381.91 ₹8,321.82 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.68 | cum | 9,134.37 ₹51,883.22 Lowest |
| 1.00 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 16.03 | kg | 138.87 ₹2,225.67 Lowest |
| 1.01 | OD41144/2025-2026:Removing water hyacinth and other vegetation and floating bodies from waterway cutting, collecting, conveying and disposing at places pointed out by the Departmental officer at site with all leads and lift and other incidental charges such as hire charges for country boats and other necessary equipments required for the work etc complete as per the direction of Departmental officers at site. | 6,950 | sqm | 13.91 ₹96,674.5 Lowest |
| 1.01 | 60.64.2:Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | 120 | metre | 134.46 ₹16,135.2 Lowest |
| 1.01 | OD44201/2025-2026:Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire
charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for
one post of 6m long 15 numbers per day 6X15=9 | 100 | metre | 186.89 ₹18,689 Lowest |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 27.06 | cum | 355.76 ₹9,626.87 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,174
Closing Date
10 Jun 2026, 5:00 pmClosed
Assistant Executive Engineer Minor Irrigation subd
MI Subdivision Kollam
GENERAL-NON-PLAN-Urgent backfilling and side Protection works to breached portion of Chelithodu to improve irrigation facilities to Kaipuzha Puncha and Allied works in Thevalakkara panchayath
2026_Irrig_838842_3
IRR/IA/TR/175/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
150 days
Thevalakkara
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
Yes
₹21,174
Yes
20 Aug 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1works | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
| 1.003 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1 | sqm | - | - |
| 1.004 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.005 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kg | - | - |
| 1.006 | OD41144/2025-2026:Removing water hyacinth and other vegetation and floating bodies from waterway cutting, collecting, conveying and disposing at places pointed out by the Departmental officer at site with all leads and lift and other incidental charges such as hire charges for country boats and other necessary equipments required for the work etc complete as per the direction of Departmental officers at site. | - | sqm | - | - |
| 1.007 | 60.64.2:Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | - | metre | - | - |
| 1.008 | OD44201/2025-2026:Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire
charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for
one post of 6m long 15 numbers per day 6X15=9 | - | metre | - | - |
| 1.009 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1443072.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.36 MB
BOQ_1443072.xls
BOQ • 0.31 MB
viewnit.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .