Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
8 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
120 days
Expenditure
Capital (WMS)
BMF/BGB
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N OR 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Definition of Similar Nature of Work:- Firms should have executed machining of bogie frame of LHB coaches or should be approved supplier of LHB bogies to zonal railways/production units.
26 conditions · 7 needing a document upload
Tenderer should go through the tender document attached with this tender thoroughly and upload all the document as asked. For convenience of the tenderer a check list has been enclosed in the tender document. All the documents should be duly signed with date and stamped by the tenderer.
The bidder has to submit Annual Contractual Turnover Data for the Previous ¾ Years (Contractual Payment Only) along with audited balance sheet as per Annexure-VI-B.
Furnish the Audited balance sheet duly certified by the Chartered Accountant for last three years
All the bidders/tenders should ensure that they are GST complaint and their quoted tax structure/rates are as per GST No Law. (Please upload certificate of GSTIN registration)
Bidder needs to submit firm's bank details ( Click here to download Format)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
LHB Bogie Frame Machining using 5-Axis Machine at firm's end as per scope of work
BMF-03-10-Machining-300
BMF-03-10-Machining-300
Open
Works - General
12 Months
24 Paraganas South, West Bengal
₹0
₹3.9 L
8 Jul 2026
16 Jun 2026
24 Jun 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,97,05,500 | ||
| — | — | — | 1,97,05,500 | ||
| LHB Bogie Frame Machining using 5-Axis Machine at firm's end as per scope of work inclusive GST @ 18%. | — | 300.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annex-IIundertaking.pdf
ATTACHMENT
AnnexVVA.pdf
ATTACHMENT
FormVIB.pdf
ATTACHMENT
Annex-8NEFT.pdf
ATTACHMENT
Annexure-1to8.pdf
ATTACHMENT
Correction Slip 1
ATTACHMENT
Correction slip 2
ATTACHMENT
Correction slip 3
ATTACHMENT
Advancecorrectionslip-5.pdf
ATTACHMENT
QUALIFIEDENGINEER.pdf
ATTACHMENT
sow.pdf
ATTACHMENT
TD300.pdf
ATTACHMENT
GCCworks.pdf
ATTACHMENT
Correctionslipno.1GCC-2022.pdf
ATTACHMENT
CorrectionSlipno.2-GCC2022.pdf
ATTACHMENT
CorrectionSlipNo_3GCC-2022.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .