Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC MINIMUM RATE QUOTED |
| 2 | L2₹1.6 CrRejected-Finance | ₹1.6 Cr | L2 | Rejected-Finance above rate quoted in the estimate value |
| Sl No | Description | Qty | Unit | Jayaraman Krishnamoorthy L2 | TVL.M.PONNUSAMY L1 |
|---|---|---|---|---|---|
| 1.00 | Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unload | 19,649 | Sqm | 87 ₹17.1 L | 87 ₹17.1 L |
| 2.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 197 | Cum | 5,100 ₹10.0 L | 5,010 ₹9.9 L |
| 3.00 | Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 19,649 | Sqm | 30 ₹5.9 L | 29 ₹5.7 L |
| 4.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 bitumen for premixing per 10sqm and 5.03 kg of shreded municipal plastic waste including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 590 | Cum | 11,320 ₹66.8 L | 11,310 ₹66.7 L |
| 5.00 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 140 | Cum | 5,529 ₹7.7 L | 5,529 ₹7.7 L |
| 6.00 | Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site and cost form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement | 707.41 | Cum | 7,290 ₹51.6 L | 7,283 ₹51.5 L |
| 7.00 | Supply and fixing of Bitumen Pad 12mm thick including cost of material and fixing charges etc complete as directed by departmental engineer(M-0660) | 132 | Sqm | 480 ₹63,360 | 479 ₹63,228 |
Updated dates
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
28 Jan 2026, 3:00 pmClosed
COMMISSIONER
MUNICIPAL OFFICE THUVAKUDI
Restoration of BT and CC Road at Ward No. 4, 5, 10, 12, 13, 14, 15, 16, 19, 20, 21 in Thuvakudi Municipality (TURIP 2025-26)
2026_MAWS_642702_1
1748/2025/E1
Open Tender
Civil Works - Roads
THUVAKUDI MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.9 L
THUVAKUDI MUNICIPALITY
19 Mar 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
14 Jan 2026
Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unload
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 bitumen for premixing per 10sqm and 5.03 kg of shreded municipal plastic waste including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site and cost form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement
Supply and fixing of Bitumen Pad 12mm thick including cost of material and fixing charges etc complete as directed by departmental engineer(M-0660)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BID.pdf
Tender Documents • 0.35 MB
BOQ_770009.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid