Loading…
Loading…
Tender Value
₹4.1 L
EMD Value
₹8,260
Closing Date
1 Sept 2026, 4:00 pm5d left
Executive Engineer PHE Division Kargil
Executive Engineer PHE Division Kargil
Laying and fitting of pipe line for remaining of household balanced works at Stakchay Mundik under the up-gradation/retrofitting of WSS Stakchey Mundik (scheme id 8334635) (under JJM).
2026_PWD_19427_3
Fresh Short E-tender- 80 of PHE Division Kargil of 2026-27
Open Tender
Pipes and Pipe related activities
Percentage
10 days
Stakchey Mundik
Refer to NIT
3 documents required · 3 mandatory
₹41
Payable To Executive Engineer PHE Division Kargil
₹8,260
25 Aug 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: | |||||
| 1.01 | All kind of soil 80% | 268.8 | Cum | 350 | ₹94,080 |
| 1.02 | Ordanary rock 10% | 33.6 | Cum | 550 | ₹18,480 |
| 1.03 | Hard Rock (by Chesling) 10% | 33.6 | Cum | 1,800 | ₹60,480 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 20mm nominal size) nallah ncluding all carriage complete.. | 3 | Cum | 7,500 | ₹22,500 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m. | 302.4 | Cum | 220 | ₹66,528 |
| 4Centering and shuttering including strutting, propping etc. and removal form for:- | |||||
| 4.01 | Walls (any thickness) including attached pilasters buttresses, plinth and string course etc. | 20 | Sqm | 550 | ₹11,000 |
| 5Providing/ Laying and fitting of HDPE pipes PN-16 PE-100 complete including cost of pipes and required fittings as per the direciton of site Engineer incharge including all carriage complete. | |||||
| 5.01 | HDPE Pipe 50mm dia | 50 | RM | 180 | ₹9,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_46072.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].