Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | ₹4.9 L | L1 | Accepted-Finance 1st Lowest bidder |
| 2 | L2₹5.5 L+₹53,370.65 (10.8%)Accepted-Finance | ₹5.5 L+₹53,370.65 (10.8%) | L2 | Accepted-Finance 2nd Lowest bidder |
| 3 | L3₹5.7 L+₹70,527.69 (14.3%)Accepted-Finance | ₹5.7 L+₹70,527.69 (14.3%) | L3 | Accepted-Finance 3rd lowest bidder |
| Sl No | Description | Qty | Unit | VISHNUDAS V L1 | G.RAMACHANDRAN L2 | Robin Mathew L3 |
|---|---|---|---|---|---|---|
| 1.00Clearing Jungle & silt removal | ||||||
| 1.00 | OD55569/2025-2026:Clearing the light jungle and grass from the canal bed and bund for water distribution. Including removal of rubbish up to a distance of 50m outside the periphery of the are cleared. | 20,530 | sqm | 8.97 ₹1,84,154.1 Lowest | 9.94 ₹2,04,068.2 | 9.8 ₹2,01,194 |
| 1.00 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | 1 | each | 15,678.26 ₹15,678.26 Lowest | 17,367.04 ₹17,367.04 | 17,200 ₹17,200 |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 1 | each | 7,825.95 ₹7,825.95 Lowest | 8,668.92 ₹8,668.92 | 8,500 ₹8,500 |
| 1.00 | OD55570/2025-2026:Engaging man mazdoor for various works to execute the work as per the directions of departmental officers at site. | 120 | no | 743.46 ₹89,215.2 Lowest | 823.54 ₹98,824.8 | 900 ₹1,08,000 |
| 1.00 | OD55568/2025-2026:Engaging hydraulic excavator including all cost of hire charge, driver, fuel and lubricants for removing debris, weeds and other major obstructions from canal bed prior to water distribution and including disposal of waste materials by mechanical means atleast 1m away from the side wall or as directed by Engineer-in-charge. | 160 | hour | 1,236.83 ₹1,97,892.8 Lowest | 1,370.05 ₹2,19,208 | 1,440 ₹2,30,400 |
Tender Value
₹7.2 L
EMD Value
₹18,006
Closing Date
24 Jul 2026, 5:00 pmClosed
assistent executive engineer
assistent executive engineercanal sub divition alathur
GENERAL Mangalam Project Dam Section Action Plan2026-27-Jungle Clearance and de silting of RBC from Ch 0 000 to 10 800 km and its branches for 2026 27
2026_Irrig_861325_1
13IRR/PI/TR/1720/2026_5_2_1/1
Open Tender
Civil Works - Canal
Item Rate
alathur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,590
Yes
₹18,006
Yes
19 Sept 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
18 Jul 2026 - 20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing Jungle & silt removal | |||||
| 1.001 | OD55569/2025-2026:Clearing the light jungle and grass from the canal bed and bund for water distribution. Including removal of rubbish up to a distance of 50m outside the periphery of the are cleared. | - | sqm | - | - |
| 1.002 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | - | each | - | - |
| 1.003 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | - | each | - | - |
| 1.004 | OD55570/2025-2026:Engaging man mazdoor for various works to execute the work as per the directions of departmental officers at site. | - | no | - | - |
| 1.005 | OD55568/2025-2026:Engaging hydraulic excavator including all cost of hire charge, driver, fuel and lubricants for removing debris, weeds and other major obstructions from canal bed prior to water distribution and including disposal of waste materials by mechanical means atleast 1m away from the side wall or as directed by Engineer-in-charge. | - | hour | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1456646.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Other Document • 1.63 MB
BOQ_1456646.xls
BOQ • 0.30 MB
Requisition.pdf
Additional Documents • 0.00 MB
Pre.pdf
Additional Documents • 0.29 MB
IntegrityPact.pdf
Other Document • 0.08 MB
Affidavit.pdf
Additional Documents • 0.01 MB
Letter.pdf
Additional Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .