Loading…
Loading…
Tender Value
₹56.7 L
EMD Value
₹66,961
Closing Date
14 Aug 2026, 6:00 pmClosed
The Chief officer Valsad Municipality valsad
BID DOCUMENTS FOR UTLITY SHIFTING WORK OF WARD NO-10, N.H.-48, GIRIRAJ HOTEL TO ABRAMA ZONE OFFICE TO KISHIU FALIYA JOINT GUTTER, AND VALIYA FALIYA WATER TANK TO HINDI SCHOOL TO KHERGAM JOINT ROAD UTILITY SHIFTING FOR EXTRA WORK OF COMPOUND & RETAINING WALL VAIOURS PLACE FOR ABRAMA AREA AT VALSAD NAGARPALIKA UNDER: 15TH FINANCE SCHEME - YEAR 2023-24 (SECOND INSTALLMENT) UNTIED GRANT.
329464
15th FCS/2023-24
Open
Civil Works
Works
Valsad
14 documents required · 14 mandatory
₹2,832
The Chief Officer, Valsad Municipality, Valsad
₹66,961
31 Jul 2026
31 Jul 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
Item Qty. Description Total Unit Amount
1 82.80 Dismentaling tiled of stone floors laid in mortar including
Cmt. stacking of sericeable materilas and disposal of unserviveable
materials with all lead and lift
Do For CONCRETE 550.40 Cmt.
2 739.00 Excavation for Foundation upto 1.5 m. Depth including sorting
Cmt. out and stacking of useful materials and disposing of
excavated stuff upto 50 Meter lead (A) (loose or soft soil)
3 322.00 Excavation for Foundation from depth 1.5 m. to 3.0 m.
Cmt. including sorting out and stacking of useful materials and
disposing of excavated stuff upto 50 Meter lead (A) (loose or
soft soil). 129.81 Cmt.
4 1061.00 Filling available excavated earth (excluding rock) in trenches.
Cmt. Plinth, sides of foundations etc. in layers not exceeding
cm.in depth consolidating each disposited layer by ramming
and watering. 130.39 Cmt.
5 119.00 Providing and laying rubble for appron (each stone weighting
Cmt. not less than 40Kg.) including and packing and filing in the
interestices with quarry-spalls. 1041.05 Cmt.
6 92.00 Providing and laying cement concrete 1:4:8 (1- Cement : 4-
Cmt. Coarse sand : 8- crushed stone aggregates 20 mm nominal
size) and curing complete including cost of formwork in (A)
PCC 2680.21 Cmt.
7 Providing and Laying controlled cement concrete M-250 and
curing complete, including the cost of formwork but excluding
the cost of reinforcement for reinforced concrete work in
Column footings.
a. 204.00 -- do -- for Raft/Base Slab 4573.28 Cmt.
SBD SECTION-7 BILL OF QUANTITIES-164
8 Providing and laying cement concrete work 1:2:4 (1- Cement :
2- Coarse sand : 4- graded stone aggregates 20 mm nominal
size) and curing complete including cost of formwork and
reinforcement for reinforced concrete work in Collumn,
Vertical wall Struts etc.
a. 502.00 Vertical and Slanting wall 3948.18 Cmt.
9 4.50 Providing and laying controlled cement concrete M-250 and
Cmt. curing complete including the cost of formwork But Excluding
the cost of reinforcement for reinforced concrete work in
Column upto Plinth Level having any cross section area.
10 15.00 Providing and Laying controlled cement concrete M-250 and
Cmt. curing complete, including the cost of formwork but excluding
the cost of reinforcement for reinforced concrete work in
Columns having any cross section area upto floor two level.
11 13.50 Providing and laying controlled cement concrete M-250 and
Cmt. curing complete including the cost of formwork but Excluding
the cost of reinforcement for reinforced concrete work in
Ground Beam having any cross section area. 5646.91 Cmt.
12 14.50 Providing and laying controlled cement concrete M-250 and
Cmt. curing complete including the cost of formwork and excluding
the cost of reinforcement of reinforced concrete work in
-- do -- for Coping 6191.30 Cmt.
8540.00 Providing TMT Bar FE 500D reinforcement for R.C.C. work
Kgs. including bending, binding and placing in position complete
upto floor two level
14 42.00 Brick work using common burnt building bricks having
Cmt. crushing strngth not less than 35 Kg./cm2 in super structure
for Ground Floor in C.M. (1:6) (1 Cement, 6 fine sand) racking
out joints curring etc. complete directed by Engineer-in-
15 500.00 20 mm thick sand faced cement plaster on walls up to heinht
Smt 10 metres above ground laval cosisting of 12 mm thick
backing coat of C:M 1:3 (1-cement :3-sand) and 8mm thick
finishing coat of C:M 1:1 (1-cement :1-sand) etc complete.
SBD SECTION-7 BILL OF QUANTITIES-165
16 500.00 Finishing wall with water proof exterior emulsion apex paint of
Smt on wall surfaces (two coats) to give an approved brand and
manufacture and of required slope evan shade after throughly
brushing the surface to remove all dirt and remains of loose
powered materials. etc completed. 114.53 Smt.
17 1.50 Providing and laying and fixing 50 mm thick expansion joint by
Smt. hydro cell semi rigid UV resistance with high performance
laminated closed cell polythene foam joint filler in sheet foam
as directed, etc. complete.
18 5781.60 Providing and fixing M.S. grills of required pattern to wooden
Kgs frames of windows etc. with M.S. flats at required spacings
and frame alround, square or round bars with round headed
bolts and nuts or by screws (A) Plain Grill. 104.04 Kgs.
19 203.50 Painting two coats (Including priming coat) on new steel and
Smt. other metal surface with synthetic enamel paint, brushing to
give an even shade including cleaning the surface of all dirt,
dust and other foreign matter.
20 268.00 Providing and fixing 1.20 Metre high fencing with 2.0 Metre
Rmt. long M.S. Angle posts 40mm x 40 mm x6 mm and oil painting
3 coats fixed at 2.5 Mt,C/c. with five Horizontan lines and two
diagonals of galvanised steel barbed wire weighting 9.38 Kg.
per 100 Metre, strained and fixed to posts with G.I,staples
including fixing the postsin ground with 0.5 M x 0.5.M x 0.5 M.
block in C.C1:5:10 etc complete.
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in words) of
the estimated rates mentioned above. Amount of my/our tender works out as under.
( In words ) _________________________ Percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
*( Please strike out whichever is not applicable)
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of Division or as
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good for
SBD SECTION-7 BILL OF QUANTITIES-166
Note :3 I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Note :4 18 % GST Will be paid separately by Valsad Nagarpalika.
Signature of Contractor President Chief Officer
Valsad Municipality Valsad Municipality
SBD SECTION-7 BILL OF QUANTITIES-167
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
Notes.pdf
BOQ.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .