Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.1 LQualified 04A 1112 1117 4 1115 MOTI TALKIES BUILDING DANAPIT BEGAMPURA SURAT SURAT GUJARAT 395003 | SURAT | GUJARAT | 395003 | L1 | Qualified MSE, Category: General | |
| 2 | L2₹82.0 L+₹1.9 L (2.40%)Qualified | L2 | Qualified MSE, Category: General | |
| 3 | L3₹92.5 L+₹12.3 L (15.4%)Qualified | L3 | Qualified MSE, Category: General | |
| 4 | Disqualified MARLESHWAR APARTMENT SHOP NO 2 GROUND FLOOR NALLASOPRA EAST THANE MAHARASHTRA 401209 | PALGHAR | MAHARASHTRA | 401209 | - | Disqualified MSE, Category: General | |
| 5 | Disqualified | - | Disqualified MSE, Category: OBC |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
29 Aug 2025, 3:00 pmClosed
reported as and..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Hydrogen Coolers 1 point 5 Ton Capacity Operability check on monthly basis Routine service once in two months attending breakdown or deficiencies being ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; 3 point 0 Ton Cassettes by Duct able model air conditioners Operability check on monthly basis Routine service once in two months per AC attending bre..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Desert Coolers Breakdown maintenance as and when required and maintenance of desert coolers once in a year including painting of desert cooler body ins..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Cellulose pad Desert Coolers Breakdown maintenance as and when required and maintenance of cellulose pad desert coolers once in a year including painti..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement of Cellulose pad Replacement of pad for cellulose pad desert coolers Detailed scope of work is mentioned in tender document and BOQ attached..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement of Canvas Joint in Cellulose Pad Desert Coolers Replacement of canvas joint in cellulose pad desert coolers Detailed scope of work is menti..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement of high quality copper tubing 1 by 4 and 1 by 2 and 3 by 4 and 5 by 8 in 1 point 5 and 2 point 0 air conditioners as and when required dur..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement and supply of complete cellulose pad Desert cooler body size of 1169 mm H X 915 mm W X 940 mm L Any deviation may be plus minus 20 mm and..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement and supply of Desert cooler complete body size 902 mm H X 673 mm W X 673 mm L any deviation may be plus minus 20 mm 20 gauge Body mate..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Supply and replacement of Compressor for 3 point 5 Ton cassettes air conditioner Detailed scope of work is mentioned in tender document and BOQ attached..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Supply and replacement of Compressor for 5 point 0 Ton PAC air conditioner Detailed scope of work is mentioned in tender document and BOQ attached Total..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; 1 point 5 and 2 Ton window air conditioners Removal and shifting of window type air conditioners from one location to other at RAPS site Its installatio..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; 1 point 5 and 2 ton split air conditions Removal and shifting of split air conditioners from one location to others at RAPS site including installation..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; 40 and 80 and 150 Litres water coolers Removal and shifting of water coolers from one location to other and Their installation and commissioning and te..
Repair
Maintenance
and Installation of Plant Bid Details 2/33 Systems/Equipments (Version 2) - RR Site 3 and 4; Supply and charging of Freon gas in water coolers Complete job of supply of Freon Gas Freon gas R 22 and R 134 and charging of gas in cooling circuit ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Supply and charging of freon gas in ACs Complete job of supply of freon Gas Freon gas R-22 and R 410 and R 407 and R 32 and Charging of gas in cooling..
8176703
GEM/2025/B/6530034
Two Packet Bid
reported as and..
323303, Contracts & Material Management, NPCIL, Rawatbhata Rajasthan Site, Anushakti Via-Kota (Rajasthan) Phone No. 01475-242002, 242048 Which is about 60 Kms. away from Kota.
Total value wise evaluation
SERVICE
3 documents required · 3 mandatory
₹31 L
₹2.1 L
8 Aug 2025
8 Aug 2025
29 Aug 2025
reported as and..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Hydrogen Coolers 1 point 5 Ton Capacity Operability check on monthly basis Routine service once in two months attending breakdown or deficiencies being ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; 3 point 0 Ton Cassettes by Duct able model air conditioners Operability check on monthly basis Routine service once in two months per AC attending bre..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Desert Coolers Breakdown maintenance as and when required and maintenance of desert coolers once in a year including painting of desert cooler body ins..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Cellulose pad Desert Coolers Breakdown maintenance as and when required and maintenance of cellulose pad desert coolers once in a year including painti..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement of Cellulose pad Replacement of pad for cellulose pad desert coolers Detailed scope of work is mentioned in tender document and BOQ attached..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement of Canvas Joint in Cellulose Pad Desert Coolers Replacement of canvas joint in cellulose pad desert coolers Detailed scope of work is menti..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement of high quality copper tubing 1 by 4 and 1 by 2 and 3 by 4 and 5 by 8 in 1 point 5 and 2 point 0 air conditioners as and when required dur..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement and supply of complete cellulose pad Desert cooler body size of 1169 mm H X 915 mm W X 940 mm L Any deviation may be plus minus 20 mm and..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Replacement and supply of Desert cooler complete body size 902 mm H X 673 mm W X 673 mm L any deviation may be plus minus 20 mm 20 gauge Body mate..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Supply and replacement of Compressor for 3 point 5 Ton cassettes air conditioner Detailed scope of work is mentioned in tender document and BOQ attached..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Supply and replacement of Compressor for 5 point 0 Ton PAC air conditioner Detailed scope of work is mentioned in tender document and BOQ attached Total..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; 1 point 5 and 2 Ton window air conditioners Removal and shifting of window type air conditioners from one location to other at RAPS site Its installatio..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; 1 point 5 and 2 ton split air conditions Removal and shifting of split air conditioners from one location to others at RAPS site including installation..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; 40 and 80 and 150 Litres water coolers Removal and shifting of water coolers from one location to other and Their installation and commissioning and te..
and Installation of Plant Bid Details 2/33 Systems/Equipments (Version 2) - RR Site 3 and 4; Supply and charging of Freon gas in water coolers Complete job of supply of Freon Gas Freon gas R 22 and R 134 and charging of gas in cooling circuit ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Supply and charging of freon gas in ACs Complete job of supply of freon Gas Freon gas R-22 and R 410 and R 407 and R 32 and Charging of gas in cooling..
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8176703.pdf
GEM_BID
1754281608.pdf
OTHER
1754281624.pdf
OTHER
1754281712.pdf
OTHER
ATC_1d137f88-7ba0-4bb0-b0291754628736280_rrsuser8.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .