| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC H NO 01 VILLAGE PADHANA TARAORI DISTRICT KARNAL | TARAORI | KARNAL | HARYANA | ₹9.8 L | L1 | Accepted-AOC ok |
| 2 | L2₹10.2 L+₹40,400.32 (4.13%)Rejected-Finance 1505 A NEAR SHIV MANDIR KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | ₹10.2 L+₹40,400.32 (4.13%) | L2 | Rejected-Finance L2 |
| 3 | L3₹11.3 L+₹1.5 L (15.3%)Rejected-Finance 309 NEAR SHIV MANDIR MUNDH ASSANDH KARNAL 132039 | KARNAL | KARNAL | HARYANA | 132039 | ₹11.3 L+₹1.5 L (15.3%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical CIVIL HOSPITAL ROAD BARWALA DISTT HISAR | HISAR | HARYANA | 125001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.9 L
EMD Value
₹21,720
Closing Date
20 Mar 2026, 5:00 pmClosed
Om Prakash Kardam
Municipal Corporation Karnal
Construction of Yoga Shed in Kashmira Singh Park ,Ram Nagar ,Ward no.19,M.C.Karnal (Recall)
2026_HRY_508272_1
2026C699D0CA 3762 41B2 A3B5 7080FF6292F0747ULB
Open Tender
Civil Works
Works
60 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹21,720
Yes
16 Apr 2026
13 Mar 2026
21 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[10.37.1]Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 1. 25 mm thick [Through Rate]
[10.38]Providing and fixing of Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. [Through Rate]
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate]
[13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.4.1]Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 1. All kinds of soil [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
[7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
[9.31]Providing and fixing Hi, Rib profiled sheets 0.60mm TT (Total Thickness) (only ± 0.2mm tolerance allowed) Hi Tensile galvalume/Zincalume steel sheet of the approved make having a hot dip metallic Zinc-Aluminium alloy (AZ-150) coating of minimum (150 gms/sqm) with 550 Mpa yield strength of approved blue colour (RAL-5012) the colour coating shall be as per IS 15965 of SMP or Super Durable Polyester Paint XRW fixed with hex head self-drilling screw sloping roof without curvature as per approved specification, drawing and design of the Corporation [Through Rate]
stage.html
html • 0.05 MB
techsummary_587039.pdf
BOQ Comparative Chart
xlsx
finsummary_587039.pdf
2026_HRY_508272_1.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_587039.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .