Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹4.2 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹4.3 L+₹7,934.20 (1.90%)Rejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹4.3 L+₹7,934.20 (1.90%) | L2 | Rejected-AOC Not L1 bidder |
| 3 | L3₹4.4 L+₹17,259.21 (4.13%)Rejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹4.4 L+₹17,259.21 (4.13%) | L3 | Rejected-AOC Not L1 bidder |
| Sl No | Description | Qty | Unit | TRIDEO CONSTRACTION L1 | A.K. ENTERPRISES L3 | TRIBHUWAN ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | I. 04 nos. Joint preparation take-up lifting/dismantling & re-installation. (a) Take-up lifting/dismantling cost. | 13.54 | MT | 2,150 ₹29,121.75 Lowest | 2,200 ₹29,799 | 2,200 ₹29,799 |
| 2.00 | (b) Take-up re-installation cost. | 13.54 | MT | 4,200 ₹56,889 Lowest | 4,300 ₹58,243.5 | 4,250 ₹57,566.25 |
| 3.00 | II. For 02 nos. gear coupling changing. (a) Dismantling Cost. | 6.85 | MT | 2,150 ₹14,736.1 Lowest | 2,200 ₹15,078.8 | 2,200 ₹15,078.8 |
| 4.00 | (b) Gear box and coupling installation cost. | 6.85 | MT | 4,200 ₹28,786.8 Lowest | 4,300 ₹29,472.2 | 4,250 ₹29,129.5 |
| 5.00 | III. 04 nos. drum lagging. (a) Take-up lifting/dismantling cost. | 11.97 | MT | 2,150 ₹25,739.8 Lowest | 2,200 ₹26,338.4 | 2,200 ₹26,338.4 |
| 6.00 | (b) Take-up re-installation cost. | 11.97 | MT | 4,200 ₹50,282.4 Lowest | 4,300 ₹51,479.6 | 4,250 ₹50,881 |
| 7.00 | IV. 190Nos. Idler frame repairing. (a) Frame bracket dismantling cost. | 3.89 | MT | 5,600 ₹21,778.4 Lowest | 6,000 ₹23,334 | 5,800 ₹22,556.2 |
| 8.00 | (b) Frame fabrication & erection cost. (3.889+1.214MT) | 5.1 | MT | 10,700 ₹54,602.1 Lowest | 11,000 ₹56,133 | 10,800 ₹55,112.4 |
| 9.00 | (c) Roller dismantling cost. | 8.44 | MT | 2,150 ₹18,150.3 Lowest | 2,200 ₹18,572.4 | 2,200 ₹18,572.4 |
| 10.00 | (d) Roller installation cost. | 8.44 | MT | 4,200 ₹35,456.4 Lowest | 4,300 ₹36,300.6 | 4,250 ₹35,878.5 |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
2 Mar 2026, 6:00 pmClosed
ANOOP KUMAR SINGH
KEDLA WASHERY
Repairing of 04 nos. Joint preparation, 02 nos. GC-10 gear coupling changing, 04 nos. Bend drum lagging and 190 nos. Idler frame repairing of unit no. 116A and 133A of Pre-Washery.
2026_CCL_353444_1
PO/KW/E-Tender/25-26/87 Date 17.02.2026
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,300
24 Apr 2026
17 Feb 2026
3 Mar 2026
18 Feb 2026
2 Mar 2026
18 Feb 2026
18 Feb 2026 - 24 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.25 MB
BOQ_366242.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .