| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹2.7 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹2.8 LRejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | ₹2.8 L | L2 | Rejected-Finance higher than L1 |
| 3 | L3₹2.8 LRejected-Finance HATIARA SHARIF ROAD P O HATIARA KOLKATA 700157 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700157 | ₹2.8 L | L3 | Rejected-Finance higher than L1 |
| Sl No | Description | Qty | Unit | DEY ENTERPRISE L1 | GLACIER ENGINEERING CO L3 | EASTERN INDIA SALES AND SERVICE L2 |
|---|---|---|---|---|---|---|
| 1.00 | Supply on hire basis 1 (one) no. 25 KVA eco friendly silence in operation generating set with controlling panel main switch change over switch and necy. battery as per requirement and properly installed in suitable position as per direction of EIC with earthing complete incl. guarding arrangement for 24 hrs. during Haj'2026 [25 KVA x 0.8 = 20 kW ; 20 kW x 30 days = 600kW] | 600 | KW | 129.14 ₹77,484 | 131.97 ₹79,182 | 131.71 ₹79,026 |
| 2.00 | Running and maintenance of generating sets in full load balance during Haj'2026 (30 days) with supply of fuel, lubricants, sundries and skilled operational staff and incl. all other materials required to complete the work with all electrical connections complete. (min. 6 hrs. running)
6 hr x 600 kW = 3600 kWhr. | 3,600 | KWHR. | 22.51 ₹81,036 | 23 ₹82,800 | 22.96 ₹82,656 |
| 3.00 | Labour charges for 1 (one) no. operating personnel for operation of pumping machineries of tubewell by automatic panel including operation of valves as per specification and round the clock guarding of the whole installation with all accessories complete as per direction of E.I.C. and enclosed Terms & Conditions during Haj'2026 period. | 30 | DAYS | 1,129.62 ₹33,888.60 | 1,154.35 ₹34,630.50 | 1,152.1 ₹34,563 |
| 4.00 | Making temporary shed for storing fuel, lubricants and other necessary materials by supplying bamboo, durma mat, corrugated iron sheet, rope etc. to carry out the work as per direction of EIC. | 1 | ITEM | 10,050 ₹10,050 | 10,270 ₹10,270 | 10,250 ₹10,250 |
| 5.00 | Hiring of Maxi Cab car [Bharat Stage-III, Diesel/LPG/CNG] in good condition for 24 hrs. duty per day with driver and garage facility as per direction of EIC. inclduing supply of necessary fuel & lubricants required for the period in Haj'2026 for Haj pilgrims infrastructure providing duty. | 30 | DAYS | 919.58 ₹27,587.40 | 939.71 ₹28,191.30 | 937.88 ₹28,136.40 |
| 6.00 | GST @18% | 1 | ITEM | 41,408.28 ₹41,408.28 | 42,313.28 ₹42,313.28 | 42,233.65 ₹42,233.65 |
| 7.00 | CESS @1% | 1 | ITEM | 2,714.54 ₹2,714.54 | 2,773.87 ₹2,773.87 | 2,768.65 ₹2,768.65 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
11 Feb 2026, 12:00 pmClosed
Executive_Engineer_NTKMD_PHED
Utility_Bldg__Beside_Delhi_Public_School_AA_ID_New_Town_Kol_700156
Backup power arrangement for operation of pumps and others at OHR-17 tube well site with construction of temporary shed etc in connection with Haj Operation 2026 under NTKMD, PHE Dte.
2026_PHED_991959_7
PHE/NTKMD/e-17 of 2025-26
Open Tender
Project Work
30 days
WORK
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
2 Apr 2026
22 Jan 2026
13 Feb 2026
22 Jan 2026
11 Feb 2026
22 Jan 2026
Supply on hire basis 1 (one) no. 25 KVA eco friendly silence in operation generating set with controlling panel main switch change over switch and necy. battery as per requirement and properly installed in suitable position as per direction of EIC with earthing complete incl. guarding arrangement for 24 hrs. during Haj'2026 [25 KVA x 0.8 = 20 kW ; 20 kW x 30 days = 600kW]
Running and maintenance of generating sets in full load balance during Haj'2026 (30 days) with supply of fuel, lubricants, sundries and skilled operational staff and incl. all other materials required to complete the work with all electrical connections complete. (min. 6 hrs. running) 6 hr x 600 kW = 3600 kWhr.
Labour charges for 1 (one) no. operating personnel for operation of pumping machineries of tubewell by automatic panel including operation of valves as per specification and round the clock guarding of the whole installation with all accessories complete as per direction of E.I.C. and enclosed Terms & Conditions during Haj'2026 period.
Making temporary shed for storing fuel, lubricants and other necessary materials by supplying bamboo, durma mat, corrugated iron sheet, rope etc. to carry out the work as per direction of EIC.
Hiring of Maxi Cab car [Bharat Stage-III, Diesel/LPG/CNG] in good condition for 24 hrs. duty per day with driver and garage facility as per direction of EIC. inclduing supply of necessary fuel & lubricants required for the period in Haj'2026 for Haj pilgrims infrastructure providing duty.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.98 MB
Tendernotice_2.pdf
PDF • 0.90 MB
Tendernotice_3.pdf
PDF • 0.57 MB
BOQ_2425459.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid