| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 CrAccepted-Finance 4TH FLOOR VOLTAS HOUSE A BLOCK DR BABASAHEB AMBEDKAR ROAD CHINCHPOKLI MUMBAI MAHARASHTRA 400033 | MUMBAI | MAHARASHTRA | 400033 | ₹3.1 Cr | 1 | Accepted-Finance accept |
| 2 | 2₹3.3 CrAccepted-Finance | ₹3.3 Cr | 2 | Accepted-Finance accept |
| 3 | 3₹3.3 CrAccepted-Finance 1ST AND 2ND FLOOR NO 20 3RD MAIN ROAD BHUVANESHWARINAGAR RT NAGAR SULTHANPALYA BANGALORE BANGALORE KARNATAKA 560032 UDYAM KR 03 0035210 | BENGALURU URBAN | KARNATAKA | 560032 | ₹3.3 Cr | 3 | Accepted-Finance accept |
| 4 | 4₹3.8 CrAccepted-Finance | ₹3.8 Cr | 4 | Accepted-Finance accept |
Tender Value
₹4 Cr
EMD Value
₹8 L
Closing Date
29 Jun 2024, 6:00 pmClosed
Chief Engineer DCE (CED PD EP)
Chief Engineer DCE (CED PD EP) Sarathi Building NFC Hyd
Providing VRV/VRF facility to Adhaar Building
2024_NFC_808433_2
E658
Open Tender
Electrical Works
Works
240 days
Hyderabad
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹8 L
19 Aug 2024
22 May 2024
1 Jul 2024
22 May 2024
29 Jun 2024
5 Jun 2024
22 May 2024 - 4 Jun 2024
Amount
OUTDOOR UNITS :SITC of VRF/ VRV System - Supplying, Installation, Testing and Commissioning of Variable Refrigerant Flow / Variable Refrigerant Volume modular type air-conditioning system suitable of all weather proof for COOLING with variable frequency drive based technology, having all hermetically sealed inverter type scroll Compressor, comprising of one or more variable output compressor moduels,condenser coil & fins provided with special anti- corrosive treatment, necessary accessories for oil separation, moisture removal, flow control,interconnecting pipping, condenser air fan,electrical and microprocessor based controller,interconnecting cabling, all housed inside a weather-proof cabinet suitable for exposed installation on terrace. the panel must be 100% compatible with BMS. The unit/s provided with self-addressable control system for control of indoor & other outdoor machines. The capacity & power consumption curves deration / correction factor curves / charts for indoor temperature and piping derations must be submitted with offer, along with duly filled up datasheet in the attached format.And top discharge type condensing unit(s) with R-410 A / Eco-friendly refrigerant, vibration isolators, with suitable foundation etc. complete as required. The ODU unit shall deliver the rated capacity at AHRI conditions and work even at 50 Deg C ambient temperature without tripping . ODU unit shall be fitted with low noise propeller type aero spiral fan, condenser coil, refrigerant shut off valves, safety devices, including ODU Refnet , etc. The unit shall be suitable to work on 400 V +/- 10% , 3 phase, 50 Hz AC power supply. The unit shall be filled with first charge of the refrigerant and ready for use as required. The combination of ODUs should be in a way to achieve more than 3.6 COP at 100% capacity, and maximum 3 ODU / compressor models. ODU unit shall be equipped with an oil recovery sytem to ensure stable operation with long refrigerant piping. Condensing unit shall be modular type , designed as per Indian atmospheric conditions and should be capable to perform for Outside Ambient temperarture 52 Deg. C. Test certificates for VRF/VRV equipments shall be submitted. Total required Cooling Capacity of AC system for Building - 288 HP . ODU's should be installed on the Terrace of the Bldg. . NOTE :- (i) AC System should deliver its 100% Cooling capacity at 43 Deg C ( ambient temp.) (ii) AC System shall be provisioned such that, even if the power supply to any Indoor unit (IDU) is cut-off , the rest of the AC system shall be able to to continue to function normally.
Outdoor (ODU) Units - 68 HP capacity
Supply
Installation
Outdoor (ODU) Units - 64 HP capacity
Supply
Installation
Outdoor (ODU) Units - 58 HP capacity
Supply
Installation
Outdoor (ODU) Units - 50 HP capacity
Supply
Installation
Outdoor (ODU) Units - 48 HP capacity
Supply
Installation
INDOOR UNITS ( Ceiling suspended Cassette type AC): Supplying, installation, testing and commissioning of following capacity 4-way flow - VRF/VRF based - ceiling mounted Cassette type Indoor unit equipped with synthetic washable media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX Copper coil, electronic expansion valve , outer cabinet , high lift drain pump, fresh intake provision , shall have four way supply air grills on sides & return air girll in center , cord less remote control with LCD display for controlling the indoor unit, display, addressable panel, required refnet joints,Cordless remotes for Indoor units with sensor kit. etc. complete as required suitable for operation on Single Phase, 230 Volts, +/- 10%, 50 Hz. AC supply, complete as required. The IDU shall have automatic force shut down provision in case of fire on recieving signal from BMS system . The Cooling capacity of Indoor Unit will be at air inlet condition of 27 Degree C DB and 19 Degree C WB temperature. NOTE : Each Cassette type AC (IDU) Unit shall be provided with Corded remote controller with LCD display and cordless remote controller.
2.0 TR, Ceiling suspended - Cassette type Indoor unit.
Supply
Installation
2.5 TR, Ceiling suspended - Cassette type Indoor unit.
Supply
Installation
3.0 TR, Ceiling suspended - Cassette type Indoor unit.
Supply
Installation
1.5 TR, Ceiling suspended - Cassette type Indoor unit.
Supply
Installation
Accessories: Refnet Y / T joints in pair with insulation, as recommended by manufacturer, suitable for the indoor machines quoted.
Supply
Installation
LOW SIDE WORKS FOR VRF SYSTEM: Installation & N2 Pressure Testing of following capacity of VRV/VRF outdoor unit (ODU) complete with hermetic SCROLL compressor, heat exchanger, inverter controller, multi step function to meet load fluctuation, axial flow quiet operation condenser fans, MS support stand with black paint, starter panel, microprocessor based control panel, modular type construction, safety devices, controls, fault alarm indications, memory storage, hydrophilic coated condenser coil with copper tube and copper header, condenser guard, fan guard, CRC coated outer casing, vibration isolators, compressor jacket; as per the specification. Isolater / MCCB in IP55 enclosure near each ODU with armoured copper conductor cabling with end termination from Switch to ODU provided by the electrical department.During any fault / Breakdown in the control wiring circuit or communication from IDU to ODU, The system must work as a standard DX system shutting off of complete system during communication breakdown IDU to ODU not acceptable.
Supply
Installation
Supply
Installation
Supply
Installation
Supply
Installation
Supply
Installation
Supply and charging of additional required Refrigerant gas- R410a required for commissioning of the VRF system.
Supply
Installation
Outdoor condensing units with MS Stand (epoxy coated)
Supply
Installation
VRF Copper Piping: Supply, installation, testing and commissioning of refrigerant gas & liquid piping with corrosion resistant coating and using eddy current free Copper pipes and fittings like elbows, couplers, tee joints, brass fittings, "U" loops, expansion loops etc. Supports consisting of GI box / "C" sections & female anchor fasteners with full threaded GI rods, insulation of suction / liquid pipes using 19 mm thick elastomeric closed cell Nitrile Rubber insulation material having class "O" for fire properties along with protective coating as per specifications, structural clamps with hard PVC pipe sleeves under the clamps to protect insulation at supports, tagging to enable tracing connectivity to respective units as per shop drawings to be generated by contractor and approved by consultant. Submission of test reports in approved format forms a part of this item scope.Core Cutting is also included.
Supply
Installation
Supply and Laying of 1.6 mm thick perforated GI Cable Tray for Copper piping with Powder coating,.
200 x 100 MM with Cover
Supply
Installation
MS Stand / Brackets for cable Tray
Supply
Installation
SITC of 25 mm thick Class "O" Closed cell nitrile rubber insulation for UNDER DECK THERMAL INSULATION for exposed roof. Slab to cleaned and adhesive shall be applied on the roof and on the insulatilon . Insulation shall be stuck to roof firmly. Flat clamps, L clamps, etc. sall be used at the edges corners, etc. to ensure the insulation firmly stuck to roof. GI Clampings shall be fixed to the room with screws. Necessary clamping shall be used neaer the conduits , other services , etc. to ensure the insulation is firmly fixed to the slab. ( EPS , 18 Kg density TF quality).
Supply
Installation
DRAIN PIPING: Supply, installation, testing and commissioning of Rigid heavy duty PVC drain piping & insulated with 9 mm thick closed cell elastomeric nitrile rubber insulation..Core Cutting is also included.
Supply
Installation
Supply
Installation
Supply
Installation
Supply
Installation
ELECTRICAL/COMMUNICATION CABLING: Supply, installation, testing and commissioning of following cable sizes with all accessories
2 core x minimum 1.5 sq mm shielded Copper control cabling with saddles/ supports & PVC conduits to connect outdoor units with respective indoor units & remote controller units. Shield to be grounded on both ends for each circuit.
Supply
Installation
FRLS XLPE insulated armoured flexible cable, to suit ODUs of VRF between individual outdoor unit to the isolators, near outdoor units along with termination using armoured copper cable laid in 120 GSM hot dip galvanized 22 G GI trays. (Mains Power Supply & Isolators near ODU to be provide by Electrical department of required size Contractor has to confirm the Isolators specifications form manufacturer)..Core Cutting is also included.
Supply
Installation
Supply wire between indoor unit to the socket (3core x 1.5 sqmm Cu wire) laid in PVC conduits.
Supply
Installation
Supply, Installation, Commissioining and Testing of necessary Three pin tops for VRV indoor units
Supply
Installation
Supplying, installation, testing and commissioning of floor mounted cubical type Outdoor ( All weather proof) - Application electrical power supply panel - with double door system - IP 65 protection- (On suitable foundation to withstand a wind speed of 160 KMPH -) suitable for 415V, 3 Phase, 4 Wire, 50 Hz AC supply system fabricated in compartmentalized design CRCA sheet steel of 2 mm thick for frame work and covers, 3 mm thick for gland plates i/c cleaning & finishing complete with 7 tank process
Supply
Installation
Providing and Fixing 15 mm thick densified tegular edged eco friendly light weight calcium silicate false ceiling tiles of M/s. Aerolite or equivalent of approved texture of size 595 x 595 mm in true horizontal level, having 100% RH humidity resistance, thermal conductivity 0.048 to 0.052 W/m0k, light reflectance of more than 85% and sound absorption NRC 0.75, non combustible & smoke free as per BS:476 suspended on inter locking metal grid of hot dipped galvanised steel sections (galvanising @ 120 grams per sqm including both side) consisting of main ‘T’ runner suitably spaced at joints to get required length and of size 24x38 mm made from 0.33 mm thick (minimum) sheet, spaced 1200 mm centre to centre, and cross “T” of size 24x28 mm made out of 0.33 mm (Minimum) sheet, 1200 mm long spaced between main’T’ at 600 mm centre to centre to form a grid of 1200x600 mm and secondary cross ‘T’ of length 600 mm and size 24 x28 mm made of 0.33 mm thick (Minimum) sheet to be inter locked at middle of the 1200x 600 mm panel to from grid of size 600x600 mm, resting on periphery walls /partitions on a Perimeter wall angle pre-coated steel of size(24x24X3000 mm made of 0.40 mm thick (minimum) sheet with the help of rawl plugs at 450 mm centre to centre with 25 mm long dry wall screws @ 230 mm interval and laying 15 mm thick densified edges calicum silicate ceiling tiles of approved texture in the grid, including, cutting/ making opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc., wherever required. Main ‘T’ runners to be suspended from ceiling using GI. Slotted cleats of size 25x35x1.6 mm fixed to ceiling with 12.5 mm dia and 50mm long dash fasteners, 4 mm GI. Adjustable rods with galvanised steel level clips of size 85x30x0.8 mm, spaced at 1200 mm centre to centre along main 'T', bottom exposed with 24 mm of all 'T' sections shall be pre-painted with polyster baked paint, for all heights, as per specifications, drawings and as directed by Engineer-in-Charge.
Supply
Installation
Comprehensive AMC of Complete VRF/VRV System of ADHAAR Bldg. Comprehensive maintenance of ( Routine & Preventive ) and breakdwon of high side and lowe side of the VRF/VRV -288 HP Capacity Air Conditioning system comprising all the machinery - IDU's ; ODU's , remotes, electrical MCC panel, equipments including spares , consumables , etc. as given in additional terms and conditions complete as required (after One year defect liability period / after warrantee period .)
First Year/HP
Second Year/HP
Dismantling, &shifting , installation of existing window/split/ductable split AC units along with all its accessories like copper piping, ducting, insulation, cables etc.
Dismantling, &shifting
Installation
TRAC FUJICO AIR SYSTEMS LLP
AIRTEMP SOLUTIONS PRIVATE LIMITED
NATIONAL AIRCON INDIA PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].