Dy.Minicipal Commissioner - West Zone
Providing, fixing,, clamping, rebating, welding forMS/CI/DI work at different chawals and t.p. road,sabarmati&motera area in Sabarmati ward, West zone.(ARC TENDER)
367588
3/26-27 (T.N. 53)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹10,000
24 Nov 2026
24 Nov 2026
24 Nov 2026
26 Nov 2026
24 Nov 2026
120 days
1. Name of Work :-
road,sabarmati&motera area in Sabarmati ward, West
zone.(ARC TENDER)
2. Tender Estimated Cost :-
1% of the Tender Cost in theform(Rs.10,000.00)
3. Earnest Money :-
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs : Demand Draftof Rs.
6. Time-Limit : 12months
7. Validity Period : 120 Days
(i) Last Date of Submission of the :
: a) In Sealed cover in duplicate copies by
Registered Post A.D, or by Courier.or hand
(ii) Mode of Sending delivery
b) Tender sent by ordinary post will be rejected out
(iii) Description essential to be :
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in : The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening : Dt..27.11.2026 , 15:00 PM
: Submission of EMD. Tender fee and other
Documents during office hours: On date.27-11-
Place of Submission & Opening 2026, 12:00 pm West Zone, 2nd Floor, A.M.
of Tender Office, Stadium Sub Zonal Office, Nr. Panchshil
Water Tank, Naranpura Railway Crossing
(1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting
Penalty Due to Delay of work above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per
day (for all tenders amountingabove 30 Lakhs) but not
more then 10% of bill
12. Defect Liability : As per ‘B-1 Form Close
13. Time permitted to start parts Whenever a work is allotted by Engineering staff,
SABARMATI WARD -1-
of work whether minor or major of part thereof of any amount,
the contractor shall be bound to start the works within
48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and through
letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in
hours of intimation as above by contractor the
contractor shall be levied penalty of (1) Rs.1000/- per
day (for tenders amounting upto 10 Lakhs), (2) Rs.2500
per day (for tenders amounting above 10 Lakhs and
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by
contractor shall make contractor responsible to be
black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of penalty.
ybœtJtœBgwrlrmvjftuvtuohuNlbtk Ítulj
ytuVem/v.J.yu./«tusufxrJCtdîththtuz/rcÕzekd/jtRx/
Ft<tytuîthtcnthvtzJtbtkytJujtxuLzhsulwmcbeNl<t.
01.07.2017 vAefhJtlw&tg
GST Au.<uJt<btbxuLzhtubtk<&t
14. ltKt Ft<w vhevºtlkch - nJuvAecnthvtzJtbtkytJlthWvhtuf<rJCtd/Ft<tltk<
31,<t.07.07.2017 bwsc btbxuLzhtubtk (bxehegÕm+juchmÃjtgmt&u) GST
ltltuxeVefuNlbwscGSTsgtjtdwvz<tuntugðgt.mœhnw
yuGSTltuxeVefuNlbwscleyuÃjefucejexeægtlbtkhtFe
luhuxlwcezekdfhJtlwhnuNu.
Contractor's Sign Addl.C.E.
Mobil No:- (west zone)
SABARMATI WARD -2-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Name of Work:- Providing, fixing,, clamping, rebating, welding forMS/CI/DI work at different chawals
and t.p. road,sabarmati&motera area in Sabarmati ward, West zone.(ARC TENDER)
Sr.No. DESCRIPTION QTY. RATE PER AMOUNT
1 Cost Labour Work
a Unskilled Labours per shift 100.00 321.00 no.
b Semiskilled labour per shift 120.00 558.00 no.
c Fitter/Mason/Gas operator per shift 120.00 665.00 no.
d Supervisor per shift 40.00 710.00 no.
e Welder per shift 100.00 710.00 no.
2 Cost of Materials
b Jute (Spun Yarn) 60.00 88.00 kg.
c M-Seal 100 gm. pack 50.611 27.00 no.
d Cement bag 50.00 353.00 Bag
e Kapachi + Grit- Aggregates 6.00 1781.00 Cmt
f Sand 6.00 1546.00 Cmt
g Rubber Ring for 400 mm dia pipe 1.00 357.00 no.
h Rubber Ring for 450 mm dia pipe 1.00 402.00 no.
i Rubber Ring for 500 mm dia pipe 1.00 482.00 no.
j Rubber Ring for 600 mm dia pipe 1.00 580.00 no.
k Nut Bolt 50.00 95.00 kg.
l MS Plate 50.00 96.00 kg.
m MS pipe /piece 600.00 107.00 kg.
n MS Ring flange 100.00 159.00 kg.
o MS Blank flange 30.00 121.00 kg.
p Rubber Gasket 40.00 80.00 kg.
q S.S. Spindle Rod, any Dia. With threads. (Wt.of Finished Material) 5.00 1043.00 kg.
r Gun Metal Nut with threads. (Wt.of finished Material) 5.00 1406.00 kg.
s Rubber Paint 15.00 219.00 litre
t Roller assemblies 1.00 402.00 no.
u SS wire rope 1.00 63.00 rmt.
v wooden float / rubber ball 1.00 625.00 no.
w Anchor bolts 1.00 79.00 no.
3 For Welding Joints
a Rent of DG set per shift 60.00 1786.00 no.
b Rent of Welding machine per shift 45.00 1071.00 no.
c Rent for Grinder machine per shift (incl. Nece. Required Disk) 45.00 339.00 no.
d Gas Cutting set per shift 45.00 513.00 no.
e LPG bottle 5.00 2098.00 no.
f Oxygen bottle 50.00 339.00 no.
4 Rent of Tools & Other Charges
a Rent of Chain pulley block & Tripod per shift 5.00 446.00 shift.
b Rent of de-watering pump (1.5 to 3 HP) per shift 75.00 446.00 shift.
SABARMATI WARD -3-
c Rent of de-watering pump with fuel (1.5 to 3 HP) per shift 1.00 938.00 shift.
d Rent for JCB Machine 30.00 896.00 Hrs
e Providing & Supplying Hitachi Machine-110 1.00 1896.00 Hrs
f Providing & Supplying Hitachi Machine-200 1.00 2634.00 Hrs
g Barricading the entire break down or excavated area 10.00 80.00 rmt.
h Providing & Supplying hydra crane Machine 1.00 5446.00 shift
i Dumper / Trucks for 8 Hr. 1.00 8429.00 shift
j Tractor for 8 Hr. Shift 1.00 2107.00 shift
k Transportation of machinery to or Fro 180.00 397.00 Trip
l Rent for Scaffolding by H frame incl. Khapeda (per pair per day) 5.00 40.00 No.
m Electric Demolition Hammer (11-E) per shift 25.00 982.00 no.
n Cement grouting pump per shift(With Gasket) 1.00 411.00 no.
Provdg. And fixing to wall, ceiling & floor galvanised mild steel
5 tubes (Medium grade)
Charges for Water connection by making hole in CI/DI/MS main
Provdg. & Fixing Gun Metal check or nonreturn
7 full wheel, …50 mm 1.00 1027.00 no.
8 For Masonry & RCC Work
a Conveyance charge of earth ,lime,murrum 5.00 125.00 Cmt
b TMT bar with cutting, bending, placing in position etc. comp. 101.50 79.00 kg.
c P/F dead shuttering for slab, beam etc. 20.00 357.00 smt.
d Brick 500.00 7.00 no.
Proving and Fixing F.R.C. Extra Heavy Duty (EHD-35) Manhole
9 Covers 1.00 2125.00 no.
10 Carting and Fixing M.H., Chamber or CatchPit Seat and Cover 1.00 750.00 no.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
SABARMATI WARD -4-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
ુ ામLabour work Removing & relaying of existing CI/DI pipeline and new pipe line, repairing of
leakage related workand upgradation of existing network in Sabarmati ,Ramnagar, Dharamnagar, bhut
Bonglow Road, and ifferent places regarding C.C.R.S. complaints in Sabarmati ward of West zone. (ARC
સરક લ ગે નાLiquidated Damage For Delay ુ બદરકફર યાદનોસમયમયાદામાં
Category Problem SLA Period Penalty Rs.
1 Water>>Engineering Inadequate water or low inflow pressure - Eng 240 Hours
2 Water>>Engineering Leakage In Pipe Line - Eng 48 Hours
3 Water>>Engineering Water quality-Polluted water -Eng 24 Hours
4 Water>>Engineering No Water Supply- Eng 240 Hours
5 Water>>Engineering Water-other 72 Hours
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
SABARMATI WARD -5-
As per account department(A.M.C.) circular no. 56, Dt.19/09/2016 Bank guarantee of
said work must be of Ahmedabad city branch, which mentioned as bellow.
(A) Guarantee issued by following bankswill be accepted as SD/EMD on
permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period
(1) Commercial Banks :
(1) Kotak Mahindra Bank
(2) RBL Bank (The Ratnakar Bank Ltd.)
(3) IndusInd Bank.
(4) Karur Vysya Bank.
(6) FEDERAL Bank.
(7) SOUTH INDIAN Bank.
(2) Co-Operative Banks of Gujarat
(1) The Kalupur Commercial Co-Operative Bank Ltd.
(2) Rajkot Nagarik Sahakari Bank Ltd.
(3) The Mehsana Urban Co-Operative Bank Ltd.
(4) Nutan Nagarik Sahakari Bank Ltd.
(5) Saurashtra Gramin Bank.
SABARMATI WARD -6-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
SABARMATI WARD -7-
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals shall
only apply. Contractor can not stop the work due to on availably of labour force. In case
progress is delayed, contractor shall be penalized 0.1% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest
to the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the material
and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or
materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
SABARMATI WARD -8-
22. No collection of materials shall be made before it is got approved from the Engineer-in-
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in work man like manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion
of the structure.
29. All necessary safety measures and precaution (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar
days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 3% (Three percent) of the contract price
cheque or Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
SABARMATI WARD -9-
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
(1) The work sha ll be com pleted w ithin 12 Mont h.
(2) The contr actor sha ll be remai n re sponsible for Workmen’s co mpensatio n i f a ny
when such case occur s. The contractor sha ll arr ange formed ia mpasant night and
fenci ng a nd pagi and shall be responsi ble for any dama ge of life a nd limb or
property if any happe n, during the executio n of work. In case of dispute for un seen
or overlooked items the decisio n of the city Engineer shall be fi nal . T he cont ractor
shall have to give site clean of a ll ru bbish o n com pletio n of work and have over the
bui lding with final fini shing of the work as directed. Al l the reje ct ed materials sha ll
be removed from site within 24 hour s by co ntractor a t this rsk and cost.
(3) Fo r mixi ng mortar ei ther for masonry or for plaster or for a ny other purpose
contractor shal l have to prepare through of bigger size and mix t he m ortar in the
required proport ion. In oncase he shal l be a llowed to mix the m or tar eit her on floo r
or any fi nished surfaces.
(4) The contractor shal l h ave to make his own arra ngem ent for wate r required for the
work and sha ll pay the water cha rges as pe r water m eter.
(5) If any extr a item crops up dur ing the pro gre ss of work the sam e shall be car ried out
by the contractor and he shall be pa id at the rate fixe d by C.E. as per the rate
analysis based o n curr ent m arket rates.
(6) If i n the inte rest of t he Corporatio n it is ne cessary to change eit her a ny site or the
design of the propose work the contractor shal l carry out t he sa me at his quote d
rates without c har ges any extra and t he contractor wil l have to carry out the works
and he will be paid at the rate quoted by hi m and no claim for ex tra fo r subse quent
changes may be e nter tained.
(7) Retetion money at t he rate o f 2% sha ll be deducted from every runni ng bi ll of the
contractor and which will be paid at t he tim e of final bill, for w orks costing More
than Rs. 10-00 lakhs.
(8) The tender for the wo rk shall rem ain open for a period (120) days from the date of
openin g of the tender s for this work a nd that the te ndere r shall not be a llowed to
withdraw on m odify the of fer on his o wn duri ng the per iod. If any te nde rer
withdraw or makes an y modificat ions (s) or addition (s) in the te rm s and conditions
of his te nder not accepta ble to the Munic ipa l Cor poratio n the Municipal
Corporation shal l without pre ju dice to any ri ght or remedy be at l i berty to for feit in
ful l the said ear nest money absolutely.
SABARMATI WARD - 10 -
(9) As per Cir cul ar No. MCR 2176 (96) 2418 (ii) GHH date d 31-03-77 issued by
Government of Gujara t contractors are re quested to produce the i r qua rry m aterial s
for constr uction work through le gal so urces. i.e. only form the qua rry lease holders,
perm it holde r or middle man who satisfies the contractor as to the lega lity of the
source of purchase by him on these mate rials.
(10) Contracto r has to make his own a rra ngement fo r proc urement of steel and cem ent.
(11) Conditional tender wil l not be accepte d.
(12) All te nder s are to be submitte d i n duplicate without which the
(13) tenders are lia ble to be rejected.
(14) Condition of form B1 St an dar d Specification of mat erial & c ode o f pr actice will
be applicabl e. Form B 1 & B2 can be is avail able on website.
Contr actor’s Signat ure A dd. City Engineer
SABARMATI WARD - 11 -
AHMEDABAD MUNICIPAL CORPORATION ENGINEER DEPARTMENT
TECHNICAL SPECIFICATIONS
Name of Work:-Providing, fixing,, clamping, rebating, welding forMS/CI/DI work at different chawals and
t.p. road,sabarmati&motera area in Sabarmati ward, West zone.(ARC TENDER)
Item No.1 :-Supplying, labour for excavation of all types of soil at any depth including excavation of
asphalt pavement of any thickness, demolition of brick work in CM of any proportion
including stacking of serviceable materials and disposal of unserviceable material etc.
comp. as directed.
Mode of measurement
Measurement shall be paid by No. basis.
Item No.2 :-Cost of Materials.
Mode of measurement
Measurement shall be paid by itemwise unit basis.
Item No.3 :-Welding in all positions with required numbers of runs, for MS pipes internally and /or
externally including gauzing wherever necessary, fixing appurtenances and other
accessories in connection with pipe laying work as per specifications.
Mode of measurement
Measurement shall be paid by Nos.unit basis.
Item No.4 :-Rent of Tools & Other Charges
Mode of measurement
Measurement shall be paid by itemwise unit basis.
Item No.5 :-Provdg. And fixing to wall, ceiling & floor galvanised mild steel tubes (Medium grade)
Mode of measurement
Measurement shall be paid by Rmt.unit basis.
Item No.6 :-Charges for Water connection by making hole in CI/DI/MS main line
Mode of measurement
Measurement shall be paid by Nos. Unit basis.
Item No.7 :-Provdg. & Fixing Gun Metal check or nonreturnfull wheel, …50 mm
Mode of measurement
SABARMATI WARD - 12 -
Measurement shall be given in Nos. Unit Basis.
Item No.8 :-For Masonry & RCC Work
Mode of measurement
Measurement shall be paid by itemwise unit basis.
Item No.9 :-Proving and Fixing F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers
Mode of measurement
Measurement shall be given in Nos. unir Basis.
Item No.10 :-Carting and Fixing M.H., Chamber or CatchPit Seat and Cover
Mode of measurement
Measurement shall be given in Nos.unit.Basis.
SABARMATI WARD - 13 -
And All type ON SITE Material responsibility only Labour contractor.
APPLICABLE CODES :
Various operations such as transport to work sites lowering in trenches laying jointing
and field testing of cast iron pipes and fittings shall comply with all currently applicable
standards. In all cases the latest revision of the standards shall be referred to. If requirements
of this specification conflict with the requirements of the standards this specification shall
(a) IS: 638 Specification for sheet rubber jointing and rubber inserting jointing.
(b) IS: 782 Specification for caulking lead.
(c) IS: 1538 Specification for cast ion fittings for Pressure pipes for water gas and sewage.
(d) IS: 3114 Code of practice for laying of cast-iron.
(e) IS: 3400 Methods of test for vulcanized rubber (Parts to 20)
(f) IS: 5382 Specification for rubber sealing ring for Gas mains water and sewers.
(g) IS: 6587 Specification for spun /yarn.
CARTING AND HANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from
the Municipal Stores or contractor’s stack yard to the work sites at places along the alignment
of pipeline as directed by Owner /Engineer. The Contractor shall be responsible for the safety
of pipes fitting and vales with tail pieces in transit loading/unloading. Every care shall be
exercised in handling pipes and fittings to avoid damage. While unloading the pipes and
fittings shall with steadying ropes of by any other means. Padding shall be provided between
coated pipes fittings and skids to avoid damage to the coating Suitable gape between pipes
should be lift at intervals in order to permit access from one side to the other. In case of
spigot socket pipes care should be taken regarding orientations pipes while unloading. As far
as possible pipes shall be ulna added on one side of the stretch only. The pipes shall be
checked for any visible damage (such as broken edges cracking or spelling of pipe) while undo
adding and shall be sorted out for reclamation any pipe which shows sufficient damage to
preclude it from being used shall be discarded shall be prohibited. Necessary warning boards
and lamps should be provided in front and side of pipes to avoid any accident. Pipes should
be stacked with sufficient packing to prevent rolling of the same. Contractor will be fully
responsible for any accident due to pipes or other materials stacked on site of yard.
Contractor will be fully responsible for any legal formalities arising due to such accident and
all legal charges there of shall be paid by contractor of will be recovered from his running bill
of the same or other AMC works.
SABARMATI WARD - 14 -
Each stack of pipes shall contain only pipes of same class and size, with consignment
or batch number marked on it with particulars of supplies wherever possible storage shall be
done on film level and clean ground and wedges shall be provided at the bottom layer to keep
the stack stable. The stack shall be in pyramid shape or the laid length wise and crosswise in
altimeter layers. The pyramid stack shall be made for smaller diameter pipes for conserving
space in storing them. The height of the stock shall not exceed 1.5m. Fitting and sluice valves
with tail pieces shall be stacked under cover and separated from pipes. Rubber rings shall be
stored in clean cool store away from windows boiler electrical equipment and petrol oils or
other chemicals Particularly in the field where the rubber nods are being used it is desirable
that they are left out on the ground in the sun or overmuch under heavy frost of snow
The Contractor shall visit the before tendering and get himself acquainted site
condition and the regulations regarding the laying of pipes in congested areas heavy traffics
areas etc. The successful bidder shall take the necessary permission and clearance of all the
authorities like department of ads traffic water supply and the drainage electricity broad
telephone comp any etc. Wherever necessary.
Road reinstatement shall not be included in back filling unless specified.
To protect person from injury and to avoid damage to property adequate barricades
construction signs red lanterns and guards as required shall be placed and main lined during
the progress of the construction work and unit it is safe for the traffics to use the roadways.
The relevant Indian standards and the rules and regulations of the local authorities in
regarded to safety provisions shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be
provided by contractor at his own cost.
Suitable fencing shall be provided along the sides of trenches and pits. The post of the
fencing shall be of timber securely fixed in the ground not more then 3m.apart and they shall
be less than 75 mm in diameter of less than 1.2 m above the surface of the ground. There
shall be two rails. One near the top of the post and the other about 450 mm. Above the
ground and each shall be from 50mm to 70mm in diameter and sufficiently long to run from
post to post which they shall be bound with strong rope. The method of projecting rails
beyond the posts and tying them together where they meet will not be allowed on any
account. All along the edges of the excavated trenches a bank of earth about 1.2. m high shall
be formed as required by the Owner/Engineer for further protection. The above work shall
not be paid for separately and the contractor shall take into account the costs of such works
and quote accordingly.
Whole work shall done within 24 hrs. by parts or whole work so that water supply
from AMC shall not be disturbed.
The excavation in the foundation shall be carried out in true and level and shall have
the width and depth as required and as directed. The Contractor shall provide necessary
slopes to a safe angle or steps as required or directed at his own cost No extra payment shall
be made for such precautionary measures taken. The bottom of the excavated area shall be
leveled both longitudinally and transversely as directed by removing excess soil and watering
SABARMATI WARD - 15 -
as required. No earth filling will be allowed for bringing it to level if by mistake or any other
reason excavation is made deeper or wider than as directed. The extra depth or width shall be
made up with concrete of the same proportion as specified for the foundation concrete at the
cost of the contractor. The excavation up to any required depth shall be carried out under this
item as required and directed by engineer in charge.
Surface Excavation for Road Work :
Excavation exceeding 1.5 mm in width and 10 sq mm on plan but not exceeding 30 cm
in depth in all kinds of soil which are specified shall be as treated as surface excavation.
Excavation in trenches for service lines - Water supply and Drainage :
Excavation in trenches shall be carried out in any material encountered on the site to
enable the service lines to be laid to the lines and levels shown and as directed. Excavation
shall be made with adequate and stable side slopes or shoring strutting if necessary. The
contractor shall provide all measures to protect adjoining properties service limes etc. The
contractor shall take necessary action to keep excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection.
The trench bed shall be trimmed and rammed with sprinkling of sand or murmur so that the
pipes when laid to the required levels and gradients shall be no the bottom fully supported
along the entire length of the pipe. The trench shall be deepened and widened locally to
receive the sockets and to permit the joint to be made and inspected.
Before excavation is started rails shall be erected at convenient places and at all
changes of direction and gradients at a definite and as far as practicable uniform height above
the proposed invert level of the pipes the center lime being clearly marked on each horizontal
rail. The depth of excavation and level of the pipe invert shall be checked by means of
benching road of appropriate lengths.
Disposal of the Excavated Stuff :
The excavated stuff of the selected type shall be used for filling the trenches and
plinth or leveling the ground in layers including ramming and watering etc. complete. The
Contractor shall remove the balance of the excavated from the site of work to a place as
directed within a lead unto 50mm and for all lift.
Filing of Trenches:
As soon as the work in foundation has been completed and measured the sides of
foundation shall be cleared of all dedans brick bats mortar dropping etc. and filled with earth
in layers not exceeding 15 cm Each layer shall be adequately watered rammed well and
consolidated before the succeeding layer is laid. The earth shall be rammed with iron
rammers where feasible and with the butt ends in layer of crowbars where rammer cannot be
used. The plinth shall be similarly filled with earth in layers not exceeding 15 cm adequately
watered and consolidated by ramming with iron or wooden rammers. When filling reaches
finished level the surface shall be flooded with water for at least 24 hours and allowed to dry
and then rammed and consolidated. The finished level of filing shall be kept to shape and
gradient intended to receive any floor finish. The excavated stuff of the selected type only
shall be allowed to be used for filling the trenches and plinths. Under no circumstances black
cotton soil shall be used for filling the plinths.
FILLING MATERIALS:
SABARMATI WARD - 16 -
Filling materials may be either excavated stuff of selected materials brought from
outside. Excavated stuff or selected earth to be used shall be cleared of all rubbish large size
stones brick bats etc. complete and big clods shall be broken down to a size of 50 mm or less.
The selected soil and or murmur or any other materials shall be got approved before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the
contractor shall got checked the trenches ready for refilling.
The space between foundation masonry concrete pipe line and the sides of excavation
and/or bottom of found at ion shall be refilled to the original surface or up to plinth level with
earth or selected materials in layers of 15 cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid
till the final level is reached to form a thoroughly compacted base.
Refilling on top of pipe shall be carried out carefully with selected soft stuff out of the
excavated stuff. The refilling shall be raised about 5 cams. For subsequent settlements.
The contractor shall be responsible for any settlement during passage of time of during
monsoon and the same shall be refilled with stuff brought from the out side if necessary.
The process of refilling brunches in plinth watering ramming shall be carried out in
such a way as not to danger to pipe line for foundation footing plinth well etc. already laid or
If watering is not done by contractor with its own arrange meant watering charges at
20% of this item rate shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The
storage shall not be exposed to direct sunlight or any heat radiating appliance. The rings shall
not be allowed to come in contact with any fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of
pipes for which they are to be used the manufacturer’s name or trademark and the month
and the year of manufacture.
The rings shall comply with IS 5382 regarding their material finish tolerance in
dimension and physical requirement.
The rubber rings shall be such that they shall not show any signs of deterioration for
any reason during the contract period plus the defects liability period, Entire expenses
associated with correcting defects in this regard including replacement of rubber rings shall
be fully borne by the contractor.
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the
contractor shall take into account the manufacturer’s recommendations as to the methods
and equipment to be used in assembling the joints. In particular the contractor shall ensure
that the spigot end of the pipe to be jointed is smooth and has been properly chamfered that
the rubber ring as per IS 5382 is correctly positioned in the socket and that the two pipes are
SABARMATI WARD - 17 -
accurately in line, before the joint is made. The rubber rings and any recommended lubricant
shall be obtained only through the pipe supplier or as directed by the Engineer.
LEAD CALCULATING JOINTS
The jointing shall be done with molten lead and spun yam. Pin lead shall be of uniform
quality clean and free from foreign materials. It shall be of uniform softness capable of being
easily caulked or driven. It shall conform to IS: 782 Spun yarn shall be of clean hemp and of
good quality. It shall conform to IS: 6587 Its quantity shall be as follows.
Quantities of spun Yarn for Different Sizes of Pipes
(Materials for single collar joints)
Nominal Internal Spun Yarn Mass
Note: Under special circumstances the Engineer-in-charge may decide the quantities of spun yarn
depending upon the site conditions. The quantity of different diameters of C.L. pipes and fittings
shall be as follows:
SABARMATI WARD - 18 -
QUANTITIES OF LEAD YARN FOR DIFFERENT SIZES OF PIPES
Normal Size Lead/ Joint Depth of
Pipe mm Joint mm
Note: The quantities of lead given are provisional and a variation of 20 percent is
permissible either way.
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so
that the molten metal will not be chilled in being carried from the melting pot to the joint and
shall be brought to a proper temperature so that when stirred it will show a rapid change of
color. Before pouring all scum shall be removed. Each joint shall be made with
one continuous pour filling of the entire joint space with solid lead. Spongy or
imperfectly filled joints shall be bunt out and repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the
pipe shall be dammed with clay to from a pouring lip to provide for filling the joint flush with
the face and to the top of the socket.
SABARMATI WARD - 19 -
The jointed is done by first caulking in spun yam, then filling the remainder of the joint
space by running in molten lead, taking care that no dross enters the joint and then
thoroughly caulking the lead. The spun yam shall be used to center the spigot in the socket
and to prevent the flow of molten lead into the bore of the pipe.
After the lead has been run into the joint the lead shall be thoroughly caulked.
Caulking of joints shall be done after a convenient length of the pipes has been laid and
leaded. The leading ring shall first be removed and any lead outside the socket shall be
removed with a flat chisel and then joint caulked removed with a flat chisel and then the joint
caulked around three times with caulking tools of increasing thickness and hammer of 2 kg.
Weight Lead run joints shall be preferably finished 3 mm behind the socket face. The joints
shall not be covered till the pipe line has been tested under specified hydrostatic test
pressure, though the rest of the pipe line should be covered up to prevent expansion and
contraction due to variation in temperature.
Filling available excavated earth (excluding rock) in trenches plinth sides of foundation
etc. in layers not exceeding 20 cams.In depth consolidating each deposited layer by ramming
The refilling will generally refer to refilling of pipe line trenches, foundation trenches
up to plinth level or ground level with excavated stuff selected soil brought from outside.
Clearing or Trenches or Ground:
The excavated trenches for foundation or ground over which filling is to be done shall
be cleared off all grass loose stones rubbish of all kinds brick bats as well as tress roots etc.
They shall be well watered before stuff is laid.
Contr actor’s Signat ure Add. City Engineer
SABARMATI WARD - 20 -
ybœtJtœBgwÂlÂmvjftuvtuohuNl
bntldhmuJtmœl- vrùbÍtul
y.Bgw.ftu. vrùbÍtul Ítulj ytuVem,
ztuo. hbKCtRvxujCJl, WMbtlvwht, ybœtJtœ.
vrùbÍtulxuLzhltuxemlk.-03/2026-27 ytJhejuJtgujftbtuleÂJd<tu
1. Wvhtuf<xuLzhtusu<u JdobtkhSMx[uNl ^htJ<t ftuLx[tfxh©eytuyuztWljtuzfheluChJt. ÂJÂNÐ
ÂfMmtbtkstuxuLzhbtkœNtoJujntug<u bwscyLgftuLx[tfxh / buLgwVu¾ah xuLzh Che NfNu.
2. yt E-xuLzhbtk>NtoJuj «tEÍcezrmJtglt ztu¾âwbuLx zwÃjefuxftuveytumt&uCheluWvhltmhltbuÁcÁ
/MvezvtuMx&e rlg<mbgbtkbtufjJtlthnuNu.
3. Nh<e xuLzhtuhœct<j dKtNu.s
4. xuuLzhtuftuEvKfthKytÃgtrmJtgMJefthJt fu lrnkMJefthJt<ule mkÃËKom•ttBGþrlrmvjfrbNlh©elehnuNu.
5. ftuLx[tfxh©eytuyuxuLzhmt&uBGþrlrmvjhSMx[uNlle/dJobuLxhSMx[uNlleftuvebwfJtlehnuNuylufJhWvhxuLzhlkch
<&t ftuLxufxlkchMvÐjFJtu. suftuLx[tfxh©eytuyuhSMx[uNlheLgwfhtJuj l ntug<u
ftuLx[tfxh©eyuxuLzhChJtlnek.BGþrlrmvjhSMx[uNlle/dJobuLxhSMx[uNlleftuvebwfJtbtk ln´ ytJu<tuxuLzh
h>dKJtbtkytJNu.
6. xuLzh Ve vu ytuzoh / zebtLzz[tVx&eaqfJJtlehnuNu. œhufxuLzhœeXyjdxuLzhxuLzhVeChJtlehnuNu.ylu<ule vtA¤
‘ E ’ xuLzhltuxuLzhytR.zelkchyawfjFJtltuhnuNu.
7. ftuLx[tfxhtuyuxuLzhbtcukflwltb, Ft<t lkch, btRfhlkchylumhltbwMvÐyûthtubtkjFJw.
8. ytuAehfblexuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltltxuLzhtuhœct<j (fuLmj) dKtNu.
9. suftuLx[tfxh©eytuyuhSMx[uNlheLgwfhuj l ntug<u ftuLx[tfxhuxuLzhChJtlne.
10. xuLzhmt&uBþfJtbtkytJ<e yluoMxble, xuLzh le hfblt 1% «btKucukfduhLxe / zebtLzz[tVx / vu ytuzoh /
jtufjbtRfhauf&e s MJefthJtbtkytJNu. œhufxuLzhœeXyjdR.yub.ze. ChJtlehnuNu. R.yub.ze. hfbYt.
yuffhtuzmwDeleykœtS<hfbltftbbtxuhtufzt, jtufjbtRfh auf, rzbtLzz[tVx, vu ytuzoh fu
cukfduhkxeltMJYvbtk<&t Yt. yuffhtuz&eWvhleykœtS<hfbltftbbtxuR.yub.ze.lehfbbtºtrzbtLz z[tVx, vu
ytuzoh fu ckufduhkxeltMJYvbtkytvJtlehnuNu.cukfduhuLxeyb>tJt>NtFtlentuJesYhe Au.
11. ftuLx[tfxh©eytuyuJucmtExWvhxuLzhltuxembtk>NtoÔgtBþscòuftuEMþ^thtJ^thtfhJtbtkytJujnNu<tubtLghtFJtlt
hnuNusuykduAuÕjt 72 fjtfvnujtJucmtExWvhsu<u xuLzh auf fheChJtLþkhnuNu.
12. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj
btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb
SABARMATI WARD - 21 -
btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle
13. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk
&tg <u mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne.
sule ltuk^ >huf xuLzhhu juJe.
14. ybœtJtœ Bgw. ftu. Bttk Ítulj ytuVem/v.J.yu./«tusu¾x rJCtd ïtht htuz/rcÕzed/ce{s Ft<tytu ïtht cnth
vtzJtbtk ytJujt xuLzh sulw mcbeNl <t.01/07/2017 vAe fhJtlwk &tg Au.<uJt xuLzhtubtk <&t nJu vAe
cnth vtzJtbtk ytJlth Wvhtu¾< rJCtd/Ft<t <btb xuLzhtubtkGSTlt ltuxeVefuNl bwscGSTßgtk jtdw vzgtu
ntug ðgtk,mœhnwk ftbltBidderyuGSTltuxeVefuNl bwscle yuÃjefucejexe ægtlbtk htFelu huxlwk cezekd
15. yuuf fh<t J^thu ftbtu mwaJJtbtk ytJu <u mkstudtubtk œhuf ftb yk<od< yjd yjd juch dukdlw ytgtusl
ftuLx[tfxh îtht fhJtlwk hnuNu.
16. ytfMbef/ <tfeœlt ftbtu btxu Ft<t îtht sKtJuj ftbtulu ftuLx[tfxh îtht 24 fjtfle ykœh atjw fhJtlt hnuNu.
17. mœhxuLzh MvuNegj «fthlw ntuJt&e btfuox CtJ dKe S.yum.xe. ctœ fhe CtJ juJtbtk ytJuj Au.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h,ybœtJtœ” lt ltbltu fZtJJtu.
vrµb Ítul Esluh Ft<t îtht «ftrN<
SABARMATI WARD - 22 -
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 53.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .