R. Govindarajan
Technip India Ltd, No.19, Velachery Main Road, Guindy, Chennai 600032
Design, engineering, manufacture, procurement of materials and bought out components, assembly at shop, inspection including inspection by TPIA, Testing at manufacturers works, Packing, transportation and supply of CENTRIFUGAL PUMPS.
2021_REFHQ_145064_1
TP/77154C001/1823/0910-001/112
Limited
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Supply
210 days
IOCL, Gujarat Refinery
Refer Tender Documents
4 documents required · 4 mandatory
Exempted
28 Apr 2022
24 Dec 2021
22 Feb 2022
24 Dec 2021
21 Feb 2022
17 Jan 2022
24 Dec 2021 - 11 Feb 2022
RAW WATER BOOSTER PUMPS Centrifugal pumps with Mechanical seal, seal flushing system, Bearing Lubrication & Cooling system if applicable, Coupling and No sparking coupling guard, Motor with Terminal Box, Motor Canopy, Motor protecting auxiliaries like space heater, RTDs, BTDs and their respective terminal boxes, common Base frame (with Drip Pan, Drain Nozzle pipe, flange and Blind Flange), Vent valve, Casing Drain connection ( with Pipe, Drain valve, flange and blind flange ), companion flanges if applicable.
Supervision at Site:
Supervision during Erection, start-up, site run testing, Pre-Commissioning and Commissioning (Refer Note: 6 above) - Per diem charges for upto 8 hours work on normal working days
Supervision during Erection, start-up, site run testing, Pre-Commissioning and Commissioning (Refer Note: 7 above) - Overtime rate/hour beyond normal 8 Hours work on normal working days
Supervision during Erection, start-up, site run testing, Pre-Commissioning and Commissioning (Refer Note: 7 above) - Overtime rate/hour for work on weekly off days / Holidays (as applicable to project site)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .