Tender Value
₹2.6 Cr
EMD Value
₹2.6 L
Closing Date
8 Sept 2026, 6:00 pm
Executive Engineer, S.B.C Division No-1/2, Dhandhuka
Diversion (Re-Route) of VRB at Various chainages of Vallabhipur Branch canal.
334621
10 of 2026-27
Open
Miscellaneous Works
Works
Ahmedabad
6 documents required · 6 mandatory
₹4,248
Executive Engineer, S.B.C Division No-1/2, Dhandhuka
₹2.6 L
12 Aug 2026
12 Aug 2026
12 Aug 2026
8 Sept 2026
12 Aug 2026
Excavation in all sort of strata and formations
incl. depositing the unuseful excavated stuff as
and where directed incl sorting 1 and stacking
useful materials as directed upto 30 mt lead etc.
1 complete incl. dewatering. (Depth 0 TO 3.0 mt ) 1645.30 Cum 83.00
(For all type canal & foundation trenches of C.D.
A) IN OVERBURDEN INCL. HARD
brought from out side borrow area or from
2 excavated useful material incl. watering 6034.08 Cum 141.00
ramming, Compaction with pneumatic temping
and all lead and lift etc complete.
Box cutting the road surface to proper slope and
camber for making a base for road work including
removing the excavated stuff and depositing on
the road side slope as directed upto 50Mt.lead
Supplying of well graded crushed stone
aggregates, chippings etc. of hard stone of
following nominal size free of disintegrated
pieces deletarious and oraganic mater for
Granular Sub Base Material as per MORTH
specification.
Spreading the stone aggregate for rolling and
W.B.M. including filling the interstices to
4(b) required camber and gradient (excluding 5754.00 Cum 249.75
spreading of Blindage).(iii) 25mm to 50mm size
crushed stone
Rolling and consolidating water bound macadam
(except laterite and Kankar) including watering
not exceeding 150mm thickness (Main layer
including binding materials ) including filling in
depressions which occur during the process.(A)
With power roller exceeding 8 tonne and not
exceeding 12 tonne.
Providing Laying, Spreading and compacting
layer of Quarry Spall having CBR not less than
6 15%, as subgrade for the designed pavement and 3858.33 Cum 898.04
conforming to clause 305 of MoRTH
Specification.
Providing & Laying in position 'NOMINAL
MIX' cement concrete using cement sand and
crushed aggregate by machine mix incl.
necessary formworks ,centering ,scaffolding
compaction by mechanical vibrator curing as
directed with all lead & lift etc.E) Concrete grade
1:1.5:3 and MSA-20mm(Graded)
Supplying and fixing road sign board of M.S.
plates and angle iron including painting, lettering
8 etc. complete including fixing in C.C. 1:4:8 with 104.00 No 3072.99
necessary excavation etc. complete as per I.R.C.
type design.(ii) Reflective type.
Total Amount Rs.
Total Amount Rs.
I/We/ am/are willing to carry out the work at… ................ %above/below percent (Should
be written in figures and words)of the estimated rate mentioned above. Amount of my/our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Crore):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of
figures Words
specifications)
------------------------As per Separate sheet attached-------------------------
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any)%(in figure)………………………………
(in words)………………………………………………….………………………………………………...
(C)Net Tendered Amount (A-B)(in figure)………………………………
(in words)………………………………………………….………………………………………………...
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payment of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per Nominal mix the cost of difference of cement consumption have been deducted from the
rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for OPC) in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final SBD-VRB-Re-route.pdf
10.BOQ.pdf
MO Sheet-10.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].