| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.8 L+₹39,590.23 (8.99%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S R S Enterises L1 | M/S UNJALA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 1,282 | M3 | 75 ₹96,150 Lowest | 81.81 ₹1,04,880.42 |
| 1.02 | Silt clearance/trench digging and removing slush and lehal including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & normal compaction. (by JCB Machine) | 2,031.56 | M3 | 55 ₹1,11,735.8 | 42.12 ₹85,569.31 Lowest |
| 1.03 | Scrapping internal section of existing channel in bed and slope with silt uto 5.00 cm | 29,108 | M2 | 5.4 ₹1,57,183.2 Lowest | 7.14 ₹2,07,831.12 |
| 1.04 | Cleaning thick bushes and thorny jungle without uprooting including all cost of labour and T&P etc. complete | 25,513.5 | M2 | 2.96 ₹75,519.96 Lowest | 3.21 ₹81,898.34 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
12 Oct 2026, 10:30 amClosed
Executive Engineer
Executive Engineer, Office Sharda Sagar Division Pilibhit
Silt Clearance of Parewa Dy from km. 0.000 to km. 11.660 for year 2026-27 (Lot-42)
2026_UPIDC_1190802_41
04/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
30 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹12,000
14 Oct 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 1,282 | M3 | - | - |
| 1.02 | Silt clearance/trench digging and removing slush and lehal including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & normal compaction. (by JCB Machine) | 2,031.56 | M3 | - | - |
| 1.03 | Scrapping internal section of existing channel in bed and slope with silt uto 5.00 cm | 29,108 | M2 | - | - |
| 1.04 | Cleaning thick bushes and thorny jungle without uprooting including all cost of labour and T&P etc. complete | 25,513.5 | M2 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 24.59 MB
BOQ_2245180.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .