| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.9 LAccepted-AOC AT PO SAHAJBAHAL BARGAON DIST SUNDARGARH PIN 770016 | BARGAON | SUNDARGARH | ODISHA | 770016 | ₹46.9 L | L1 | Accepted-AOC Accepted |
| 2 | L1₹46.9 LRejected-Finance | ₹46.9 L | L1 | Rejected-Finance Rejected |
| 3 | L1₹46.9 LRejected-Finance | ₹46.9 L | L1 | Rejected-Finance Rejected |
| 4 | L1₹46.9 LRejected-Finance | ₹46.9 L | L1 | Rejected-Finance Rejected |
| 5 | L1₹46.9 LRejected-Finance AT BICHHUANBAHAL SARAPHGARH DIST SUNDARGARH PIN 770012 | SARAPHGARH | SUNDARGARH | ODISHA | 770012 | ₹46.9 L | L1 | Rejected-Finance Rejected |
Tender Value
₹47.0 L
EMD Value
₹46,967
Closing Date
15 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, SUNDARGARH
Construction of additional Office room building of Sundargarh Circle Office ,Sundargarh at 2nd floor for the year 2024-25
2026_CERWI_134832_1
Online-SESNG-07 of 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Sundergarh
2 documents required · 2 mandatory
₹6,000
₹46,967
Yes
20 Aug 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
8 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | R.C.C work with C.C(1:1½:3) using 12mm size hard black granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing etc. complete.2nd Floor - Column & Beam | 15.6 | cum | 21,270.1 | ₹3,31,813.56 |
| 2 | R.C.C work with C.C(1:1½:3) using 12mm size hard black granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing etc. complete. 2nd Floor Lintel Beam | 5.65 | cum | 18,866.6 | ₹1,06,596.29 |
| 3 | R.C.C work with C.C(1:1½:3) using 12mm size hard black granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing etc. complete.3rd Floor- Column up to beam | 2.77 | cum | 24,245.4 | ₹67,159.76 |
| 4 | R.C.C work with C.C(1:1½:3) using 12mm size hard black granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing etc. complete.3rd Floor- Lintel Band | 0.51 | cum | 21,361.1 | ₹10,894.16 |
| 5 | R.C.C work with C.C(1:1½:3) using 12mm size hard black granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing etc. complete.3rd Floor- Chajja | 21.6 | sqm | 1,687.6 | ₹36,452.16 |
| 6 | R.C.C work with C.C(1:1½:3) using 12mm size hard black granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing etc. complete.3rd Floor- Stair Case | 5.29 | cum | 21,071.7 | ₹1,11,469.29 |
| 7 | R.C.C work with C.C(1:1½:3) using 12mm size hard black granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing etc. complete.2nd Floor Roof Slab | 37.27 | cum | 18,295.5 | ₹6,81,873.29 |
| 8 | R.C.C work with C.C(1:1½:3) using 12mm size hard black granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing etc. complete.3rd Floor head slab | 2.48 | cum | 20,675.9 | ₹51,276.23 |
| 9 | Straightening bent up or coiled M S rods including cutting ,bending and binding ,cranking ,hooking ,welding or jointing (if required) the M S rods and binding wires and tying the grills hoisting placing in proper position as required for RCC work .2nd Floor | 51.05 | qtl | 9,604.3 | ₹4,90,299.51 |
| 10 | Straightening bent up or coiled M S rods including cutting ,bending and binding ,cranking ,hooking ,welding or jointing (if required) the M S rods and binding wires and tying the grills hoisting placing in proper position as required for RCC work .3rd Floor | 57.02 | qtl | 9,641.9 | ₹5,49,781.14 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.21 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_600271.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .