| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Finance 8 2 4 8 NABIN CHAND BORAL LANE KOLKATA 700012 | KOLKATA | WEST BENGAL | 700012 | -0.03% | ₹8.5 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 L+₹26,722.06 (3.14%)Admitted-Finance | +3.11% | ₹8.8 L+₹26,722.06 (3.14%) | L2 | Admitted-Finance |
| 3 | L3₹8.8 L+₹31,317.57 (3.68%)Admitted-Finance | +3.65% | ₹8.8 L+₹31,317.57 (3.68%) | L3 | Admitted-Finance |
Tender Value
₹8.5 L
EMD Value
₹18,000
Closing Date
19 Mar 2026, 2:00 pmClosed
Dy.CE(E)/IGWTP
IGWTP, Monirampore, Barrackpore,kol-120
UPGRADATION OF THE SAND SCRAPPING AND DISINFECTION ACTIVITIES AGAINST THE SSFB UNIT NO E 15 AND 16 UNDER EXTENSION SERIES AT IGWTP.
2026_KMC_1016803_1
KMC/WS/IGWTP/101/25-26, DT-20/02/2026
Open Tender
CIVIL WORKS
Percentage
30 days
IGWTP, Monirampore, Barrackpore, Kol-120
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
IGWTP, Monirampore, Barrackpore, Kol-120
15 Jun 2026
2 Mar 2026
23 Mar 2026
2 Mar 2026
19 Mar 2026
11 Mar 2026
7 Mar 2026
PART-A
SCRAPPING THE TOP LAYER SAND MEDIA CONSISTING OF MUD OR MUDDY SAND, ALGAE MOSS ETC. FROM FILTER BEDS AND CARRYING THE SAID SCRAPPED SAND BY HEAD LOAD AND TIPPING WAGONS TO A DISTANCE WITHIN 300 METERS FROM FILTER BED AND UNLOADING THE SAME AND STACKING PROPERLY AS PER DIRECTION OF E.I.C. (PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT).
SCRAPPING THE 2ND LAYER OF SAND OR FIRST LAYER (WHERE THERE IS NO CLAY, ALGAE, MOSS, MUD ETC ) FROM FILTER BEDS AND CARRING THE SAID SCRAPPED SAND BY HEAD LOAD AND TIPPING WAGONS TO A DISTANCE WITHIN 300 MTRS. FROM FILTER BED AND UNLOADING THE SAME AND STACKING PROPERLY AS PER DIRECTION OF E.I.C (PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT )
SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 1White washing including cleaning and smoothening surface thoroughly.All floors :b) Two coats (to be done on specific instruction).
SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 3.Colour washing with "ELLA" with a coat of white wash priming including cleaning and smoothening surface thoroughly : (ii) External surface (ground floor) (b) Two coats N.B. : Extra for each additional floor in external walls refer item 1 of
CUTTING SAND (MIDUM/COARSE SAND) FROM FILTER BEDS COLLECTING, CARRYING AND REMOVING BY HEAD LOAD OR/AND TIPPING WAGONS AND DUMPING IN STACK NEAR THE IDENTIFIED SAND WASHING MACHINE SITUATED AT A DISTANCE NOT EXCEEDING 300 METERS AS PER DIRECTION OF E.I.C. (PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT)
CUTTING OF GRAVELS OF FILTER BED UP TO THE TOP OF THE UNDER DRAIN BRIC LAYER COLLECTING AND CARRYING THE SAME AND DUMPING IN STACK AT A DISTANCE WITHIN 300 MTRS AS PER DIRECTION OF EIC ( PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT)
CLEANING THE DIRT/JUNGLES ETC. & WASHING OF COARSE SAND / MEDIUM COARSE SAND THROUGH WATER JET TYPE SAND WASHING MACHINE AND STACKING IN HEAPS / STACKS INCLUDING CUTTING AND CARRYING SAND FROM ALL WORKS SIDES/ RGSFB AREAS AT IGWTP TO THE IDENTIFIED SAND WASHING MACHINE. AFTER WASHING OF SAND THE TURBIDITY OF WASHED SAND MUST BE WITHIN 7000 PPM ( PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT OF UNWASHED SAND )
LAYING OF SCREENED AND WASHED GRAVELS/NEW GRAVELS FROM A DISTANCE NOT EXCEDING 500 METERS AND FILLING IN LAYERS IN THE FILTER BED ON TOP OF UNDER DRAIN BRICK LAYER DULY WASHED WITH THROUGH JET SYSTEM TO A UINFORM DEPTH AS PER DIRECTION OF E.I.C. INCLUDING LEVELLING THE TOP OF THE SURFACE WITH LABOUR,TOOLS AND PLANTS ETC. ALL COST INCLUSIVE.(NEW GRAVELS WILL BE SUPPLIED BY THE K.M.C.)
FILLING IN FILTERS BED WITH OLD WASHED COARSE SAND / NEW MEDIUM COARSE SAND (SUPPLIED BY THE DEPARTMENT) CARRYING THE SAND FROM THE HEAPS NEAR THE FILTER BED (DISTANCE NOT EXCLUDING 300MTRS.)BY HEAD LOAD AND TIPPING WAGON, DUMPING IN FILTER BED, LEVELLING AND DRESSING COMPLETE AS PER DIRECTION OF E.I.C.
REMOVAL / CARRIAGE OF 1ST CUT SCRAPPED SAND/CARRIAGE OF 2ND CUT SAND / WASHED SAND / NEW SAND /CUTTING SAND / GRAVELS ETC. BY HIRED LORRY INSIDE S.S.F.B. AREA WITHIN 1.5 K.M. DISTANCE INCLUDING LOADING/ UNLOADING ,LEVELLING, DRESSING & STACKING COMPLETE AS PER DIRECTION OF E.I.C.(PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT OF UNWASHED SAND)
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 19) Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)
Sum of Basic Prices (Sl No-1 to 12)
GST @ 18% on the Sum of Sl. No-13
LWC @ 1% on the Sum of Sl. No.13 and 14
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
TECHBID101.pdf
Tender Documents • 1.26 MB
BOQ_2498052.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .