Executive Engineer Panchayat IrrigationDivision, Patan
Constructing Box Culvert at Village Sarva Ta:-Patan Dist:- Patan
335999
2 of 2026-2027
Open
Miscellaneous Works
Works
Patan
6 documents required · 6 mandatory
₹900
Executive Engineer, Panchayat Irrigation Division, Patan
₹5,900
17 Aug 2026
17 Aug 2026
17 Aug 2026
31 Aug 2026
17 Aug 2026
Name of Work: Constructing Box Culvert at Village Sarva Ta:-Patan Dist:- Patan
Quantities Estimated Rates (without
Item estimated GST) Total Amount
Item estimated GST) Total Amount
Item of work Unit
No. but may be Rs.
In figures In words
Excavation in all sorts of soil strata
and formation including depositing the
unuseful excavated stuff as and where
directed including sorting and stacking Rupees
1 250.00 useful materils as required and upto 89.00 Eighty-Nine Cum.
lead of 200m and all lifts etc. complete Only
for head regulator including
dewatering and jungle cutting. (B) In
Overburden Including Hardmurrum
Providing and laying in positing
foundation cement concrete of
proportion as under using cement,
sand machine crushed course
2 9.91 aggregate laid in situ including 3424.30 Cum.
providing necessary temping smooth
finishing, watering and curing as
directed with all lead and lifts etc.
complete. (a) PCC 1:3:6
Providing and laying HYSD/TMT Fe
415,500D steel bar reinforcement for
R.C.C. works and anchor bar with
providing binding wires including
3 3.83 71366.00 Thousand Ton
cutting, bending, welding, binding in
position hooking, placing in position
with all leads & lifts etc. complete. (C)
TMT Fe 500 D steel Bars
Providing and laying RCC 1:1.5:3
grade by using cement, sand and
crushed metal for different items like
copping work, pier cap, abutment cap,
Wearing coat, Skin concrete, Solid
slab upto 60 cm. Thick, Barrel of canal
syphons, barrel of RCC through, &
4 49.58 5101.40 Hundred One Cum.
Beams for foundation and super
structure as per approved design
including providing necessary
centering, shuttering and form work,
vibrating, smooth finishing, watering
and curing as directed with all leads
and lifts etc.comp.
Backfill with selected earth including
ramming consolidation including
watering with lead as under and all Rupees Sixty-
5 104.00 lifts etc. complete.(a) 0 to 30 mt 67.00 Cum.
In Word Rupees Five Lacs Eighty-Nine Thousand Four Hundred Twelve Only
I/We am/are willing to carry out the work at… ...................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of input
rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD-Sarva Box Culver pdf 1 BOQ.pdf
SBD-Sarva Box Culver pdf 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].