Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC PANAPILLY HOUSE KUTTAMASSERY THOTTUMUGHAM P O ALUVA 5 ERNAKULAM | ERNAKULAM | KERALA | 680667 | 1 | Accepted-AOC AS PER CMTY |
| Sl No | Description | Qty | Unit | SIDHEEQ PA L1 |
|---|---|---|---|---|
| 1.00Footbridge | ||||
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1.72 | sqm | 450.27 ₹774.46 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.39 | cum | 10,769.35 ₹4,200.05 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1.09 | sqm | 450.27 ₹493.05 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.48 | cum | 12,230.15 ₹5,919.39 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 43.54 | kilogram | 131.09 ₹5,707.4 Lowest |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 537.26 | kg | 163.72 ₹87,959.88 Lowest |
| 1.01 | OD474302/2025-2026:Providing and fixing Aluminium sheet 1 mm thick 2.40mx1.20 m including all
maaterials and labour charges etc complete. | 17.92 | kilogram | 573.94 ₹10,286.15 Lowest |
| 1.01 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 9.59 | sqm | 294.94 ₹2,827.88 Lowest |
| 1.01 | OD510321/2025-2026:Engaging mancoolie | 2 | each | 1,261.84 ₹2,523.68 Lowest |
Tender Value
₹1.1 L
EMD Value
₹2,743
Closing Date
10 Jul 2026, 6:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER MULAVUKAD GP
25-26 PR NO254 Construction of footbridge to Palliyilchira thodu in W-12-Mulavukad G P
2026_LSGD_858282_1
105/AE/LSGD/MUKD/26-27
Open Tender
Civil Works - Others
Item Rate
180 days
MULAVUKAD GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹2,743
Yes
6 Oct 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Footbridge | |||||
| 1.001 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.002 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.004 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.006 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 0.2 | kg | - | - |
| 1.007 | OD474302/2025-2026:Providing and fixing Aluminium sheet 1 mm thick 2.40mx1.20 m including all
maaterials and labour charges etc complete. | - | kilogram | - | - |
| 1.008 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 1 | sqm | - | - |
| 1.009 | OD510321/2025-2026:Engaging mancoolie | - | each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1450906.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1450906.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 2.82 MB
CRGND.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .