GM P
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of barat ghar in village- Parsol YEA. WC-06
2026_YEIDA_1196112_11
YEA/GM(PROJECT)/2026/588 DT-09/10/2026
Open Tender
Civil Works - Others
Fixed-rate
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents
5 documents required · 5 mandatory
₹840
₹42,300
15 Oct 2026
15 Oct 2026
28 Oct 2026
15 Oct 2026
26 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechnical means (hydraulic excavation) manual means in foundation trenches or drain (not exceeding 1.5 m in width) or 10 Sqm on plain including dressing of sides remaining bottom, lift upto1.5 m including getting out the excavated earth and disposal of surplus excavated soil as per direction of engg. in charge with in lead upto 50 m DAR 2.8.1 | 122.83 | Cum | 72.8 | ₹8,942.02 |
| 2 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Kms. from 'the site of work and including watering, dressing etc. labour and T&P etc. required for the proper complition of the work. saplings of girth upto 30 cms. measured at a height of 1 M. above ground level and removal of rubbish upto a of cleared.50 M. out side the periphery of area distance (UPPWD/SOR-2020/255) | 13.21 | Cum | 460 | ₹6,076.6 |
| 3 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 11.23 | Cum | 5,820 | ₹65,358.6 |
| 4 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth.(DAR/4.17/Based on UPPWD/SOR-2020)) | 12.71 | Sqm | 498.15 | ₹6,331.49 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more./Cold twisted bars. (DAR/5.22.6/Based on UPPWD/SOR-2020)) | 7,243 | Kg | 77.08 | ₹5,58,290.44 |
| 7 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level. (DAR/5.33.1/Based on UPPWD/SOR-2020)) | 19.19 | Cum | 7,849.65 | ₹1,50,634.78 |
| 8 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works above plinth level upto floor V level . (DAR/5.33.2/Based on UPPWD/SOR-2020)) | 22.41 | Cum | 8,592.05 | ₹1,92,547.84 |
| 9Centering and shuttering including strutting, propping etc. and removal of form for all heights : | |||||
| 9.01 | Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | 17.28 | Sqm | 181.65 | ₹3,138.91 |
| 9.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. (DAR/5.9.5/Based on UPPWD/SOR-2020)) | 147.28 | Sqm | 337.65 | ₹49,729.09 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
11.pdf
Tender Documents • 1.38 MB
BOQ_2261786.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .