| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAccepted-AOC | ₹10.0 Cr Quoted ₹11.0 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹14.2 Cr+₹3.2 Cr (29.0%)Rejected-Finance | ₹14.2 Cr+₹3.2 Cr (29.0%) | L2 | Rejected-Finance 2nd lowest |
| 3 | Rejected-Technical 121 GOLDEN PLAZA TAGORE ROAD RAJKOT RAJKOT GUJARAT 360002 | RAJKOT | GUJARAT | 360002 | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
23 Aug 2023, 5:00 pmClosed
General Manager
Office of the General Manager Construction Circle Ganga Uttarakhand Peyjal Nigam Haridwar
Sewage treatment plant of capacity 300KLD based on JOHKASOU Technology at Ganga vatika Dhalwala Tehri Garhwal under Namami Gange Programme
2023_MDPEY_54407_3
09/Lekha-06/02 Dated 04.01.2023
Open Tender
Composite Works
Item Rate
365 days
Ganga Vatika Dhalwala Tehri Garhwal
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Project Manager C and M Unit Ganga UKPJN
₹3.9 L
Haridwar
21 Jun 2025
22 Jul 2023
24 Aug 2023
22 Jul 2023
23 Aug 2023
9 Aug 2023
2 Aug 2023
Amount
0.30 MLD (300 KLD) STP near Ganga Vatika, Dhalwala - Design, Construction, Supply, Erection, Installation & commissioning of Sewage Treatment Plant based on Johkasou Technology as per approved design & drawings.
PROCESS DESIGN ENGINEERING AND DRAWINGS :- Process & Instrumentation Diagrams, Flow Charts, Hydraulic Diagram and Complete Process Design, Site Layout Plan and Site Grading Plan, Single line Diagrams, Control Philosophy & Basic Electrical and Instrumentation Drawings, Preparation of “QA” and construction procedure manual along with “Test Plan”, Civil and Mechanical General Arrangement Drawings, Architectural Drawings, Structural Designs and Drawings and Construction Drawings, Mechanical and Piping data sheets and Drawings, Detailed Electrical and Instrumentation and control Systems, Drawings and datasheets including PLC and SCADA, Ancillary Works and Non-Technology Structural Drawings including roads and drainage and compound wall bypass + treated effluent line upto the disposal point as per direction of Engineer-in-charge, external electrification plans, including vetting of drawings from reputed institute like IIT, etc.As-Built Drawings, Operation and Maintenance Manuals and Training Program and Manuals, etc. complete (To be submitted in 6 Nos. sets in hard copy + 2 soft copies).
Civil, Electrical & Mechanical and instrumentation works of STP including testing & commissioning complete as per approved design & drawings also includes construction of Nala Tapping and diversion arrangement for Ganga Vatika drain, laying of treated effluent line as per design & drawings.
Costruction of boundary wall & Gate, protection works, approach road as per approved design, drawing and technical specification for Johkasou STP.
Supply & installation of online monitoring system at 0.30 MLD (300 KLD) STP, Dhalwala at inlet & outlet including testing & commissioning complete as per approved design, drawing and technical specifications. (Parameters - pH, BOD, COD, TSS, NH4, TN, Total Phosphorus (as PO4) & Flow)
15 Years Operation & Maintenance of 300 KLD STP based on Johkasou Technology near Ganga Vatika at Dhalwala
Annual O & M Prices of STP's except Electricity and Fuel (HSD+Lubricants) charges (The cost included herein are the yearly cost for plant Operation & maintenance including fixed cost (Cost of Manpower to be deployed, General Maintenance of Civil Structures, preventive and Breakdown Maintenance of Mechanical equipment, Electrical items, Online Monitoring System, Field & Inhouse Laboratory Instruments, Supply of Inhouse Laboratory Chemicals / Glassware / Consumable / Spares etc.) and Variable Cost (Including cost of Chemicals & Disposal of Plant Residuals viz. Screenings, Grits, Dewatered Sludge, etc)
For 1st year (Please Note - This item not to be quoted less then 3.0% of the TOTAL of Design Build etc. work for STP)
For 2nd year
For 3rd year
For 4th year
For 5th year
For 6th year
For 7th year
For 8th year
For 9th year
For 10th year
For 11th year
For 12th year
For 13th year
For 14th year
For 15th year
Area of land requirement filled by bidder in column of rate( Rate of land maintioned in quantity column for Evaluation purpose)
S.R.Paryavaran Engineer Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .