| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | L1 | Accepted-AOC accept | |
| 2 | L2₹13.3 L+₹1.5 L (13.1%)Rejected-AOC | L2 | Rejected-AOC reject |
Tender Value
₹12.1 L
EMD Value
₹30,315
Closing Date
7 Apr 2025, 6:00 pmClosed
Assistant executive enginee
o/o Assistant executive engineer,MI subdivision,Kozhikode
MIRPA- 2025 Tharammalkadavu LIS-Revamping and Rejuvenation of LI Schemes - Renovation Of Canal and Allied Works to Tharammalkadavu LI Scheme in Kodiyathur Panchayath Kozhikode Dt-General Civil Work
2025_Irrig_755528_1
IRR/IA/TR/340/2025_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
tharammalkadavu
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹30,315
Yes
24 May 2025
27 Mar 2025
9 Apr 2025
27 Mar 2025
7 Apr 2025
27 Mar 2025
Amount
Canal
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster
OD31244/2024-2025:CI Non Return Valve, Conforming to IS 5312 Part I - 1984, PN 1.0, Size 150mm.
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
13.71:Lettering with black Japan pint of approved brand and manufacture
OD31246/2024-2025:Supply of Chain Block 3 tonne capacity (Price ID - 2018/858/IA)
ABDUL RAZAK KOLAKKADAN (BID ID -2188631)
Bidder Name
MUJEEB RAHMAN K
ABDUL RAZAK KOLAKKADAN
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1226886.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .