| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | ₹16.6 L | L1 | Accepted-AOC Lowest and Agreement Executed on 01-02-2025 |
| 2 | L2₹19.0 LRejected-AOC | ₹19.0 L | L2 | Rejected-AOC Second Lowest |
| Sl No | Description | Qty | Unit | Basheer N K L1 | MAHIN BASHEER L2 |
|---|---|---|---|---|---|
| 1.00ROAD WORK | |||||
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 960 | sqm | 17.6 ₹16,896 | 20 ₹19,200 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 72 | cum | 4,125.7 ₹3.0 L | 4,200 ₹3.0 L |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 77.28 | sqm | 356 ₹27,511.68 | 375 ₹28,980 |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 343.88 | sqm | 460 ₹1.6 L | 500 ₹1.7 L |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 960 | sqm | 88.4 ₹84,864 | 100 ₹96,000 |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 2,340 | sqm | 17.3 ₹40,482 | 20 ₹46,800 |
| 1.01 | 75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 960 | sqm | 20.8 ₹19,968 | 20 ₹19,200 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 3,300 | sqm | 332.9 ₹11.0 L | 350 ₹11.6 L |
| 1.01 | 3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 5.54 | cum | 60 ₹332.64 | 70 ₹388.08 |
Updated dates
Tender Value
₹16.4 L
EMD Value
₹40,913
Closing Date
28 Oct 2025, 1:30 pmClosed
Assistant Engineer
LIDEW Thodupuzha Municipality
Annual Plan-TRIVENI UNDAPLAVU KARUKUNNAMPURAM KONIKKAMALI PATTAYAMKAVALA CHALAMKOD CANAL ROAD MERCY LANE BRIDGE H A N D R A I L P L A L A S T E R I N G KONIKKAMALI THONDIKKUZHA ROAD ENTHUNKAL ROAD IN WARD 14- THODUPUZHA MUNICIPALITY PRO, NO
2025_LSGD_812410_7
01/AE/LIDEW/TDPA/M/2025-26
Open Tender
Civil Works - Roads
330 days
Thodupuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹40,913
Yes
2 Feb 2026
22 Oct 2025
28 Oct 2025
22 Oct 2025
28 Oct 2025
22 Oct 2025
22 Oct 2025 - 28 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
viewnit.pdf
Tender Documents • 0.12 MB
BOQ_1358985.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.80 MB
Download all tender documents and submit your bid