Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.8 L+₹57,870 (26.2%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.8 L+₹63,773 (28.8%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹3.8 L+₹1.5 L (69.9%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | K S SWAROOP KRISHNAN L1 | Puthenpurayil Thomas L4 | ANIL KUMAR P L2 | JITHU V S L3 |
|---|---|---|---|---|---|---|---|
| 1.00detailed | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 11,287.73 | sqm | 14 ₹1,58,028.22 Lowest | 29 ₹3,27,344.17 | 17.66 ₹1,99,341.31 | 17.9 ₹2,02,050.37 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 105 | each | 290.6 ₹30,513 | 250 ₹26,250 Lowest | 366.74 ₹38,507.7 | 381.25 ₹40,031.25 |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 40 | each | 520 ₹20,800 | 350 ₹14,000 Lowest | 656.45 ₹26,258 | 680.21 ₹27,208.4 |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 10 | each | 707.4 ₹7,074 | 600 ₹6,000 Lowest | 892.54 ₹8,925.4 | 935.58 ₹9,355.8 |
| 1.00 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 957.3 ₹4,786.5 | 450 ₹2,250 Lowest | 1,207.81 ₹6,039.05 | 1,265.81 ₹6,329.05 |
Tender Value
₹2.9 L
EMD Value
₹7,344
Closing Date
28 Feb 2026, 11:00 amClosed
Assistant Executive Engineer
O/o the Assistant Executive Engineer, PWD Buildings Sub division, PMG, Thiruvananthapuram
GENERAL-Govt. Press, Mannanthala - Jungle clearance and Branch Cutting in the Press premises-Civil works-General Civil Work-1
2026_PWD_839194_1
PWD/BLDG/TR/16374/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
60 days
Thirunananthapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹650
Yes
₹7,344
Yes
12 May 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
detailed
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
integrity_pact.pdf
Tender Documents • 0.05 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1413888.xls
BOQ • 0.30 MB
epayment.pdf
Tender Documents • 0.05 MB
PreliminaryAgreement.pdf
Tender Documents • 0.03 MB
declaration.pdf
Tender Documents • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .