Tender Value
₹50.1 L
EMD Value
₹1 L
Closing Date
1 Sept 2026, 1:00 pm4d left
Superintending Engineer
Office of Superintending Engineer Irrigation Construction Circle Bahraich
Concrete linning for protection of Fakharpur dy. at km 8.500 to 9.000. (Lot-04)
2026_UPIDC_1177305_4
02/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
120 days
Bahraich
plz refer tender documents
3 documents required · 3 mandatory
₹2,354
₹1 L
Yes
17 Aug 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in digging foundation for masonary work in all type of soil including cost of all labour, material, T&P etc required for proper completion of work. But excluding Cost of GST. | 54.39 | M3 | - | - |
| 0.0 | Laying P.C.C. 1:2:4(M-15) mix with 20mm to 40 mm size crushed stone grite and coarse sand of f.m. not less than 2.0 including cost of all material, labour T&P etc required for proper completion of work./M3. But excluding Cost of GST. | 51.4 | M3 | - | - |
| 0.0 | 1st class brick work in 1:4 C.M. with cement and coarse sand of FM is not less than 2 including cost of all labour, material, T&P etc required for proper completion of work. But Excluding Cost of GST | 4.67 | M3 | - | - |
| 0.0 | Laying CC 1:2:4 (M15) in coping with coarse sand (not more than 2.00 FM) & 10 mm to 20 mm size stone ballast including cost of all material, labour T&P etc required for proper completion of work. But Excluding Cost of GST | 55.86 | M3 | - | - |
| 0.0 | Making sub-grade for linning work including watering,compaction etc including cost of all labour, material, T&P etc required for proper completion of work. But Excluding Cost of GST | 1,878.75 | M2 | - | - |
| 0.0 | Sand filling foundation for making base for cement concerete and lining work. But Excluding Cost of GST | 230.5 | M3 | - | - |
| 0.0 | Laying LDPE film on subgrade before construction of linning including cost of all labour, material, T&P etc required for proper completion of work. But Excluding Cost of GST | 5,010 | M2 | - | - |
| 0.0 | Laying CC 1:2:4 (M15) in coping with coarse sand (not more than 2.00 FM) & 10 mm to 20 mm size stone ballast including cost of all material, labour T&P etc required for proper completion of work. But Excluding Cost of GST | 294.6 | M3 | - | - |
| 0.0 | Making 10 mm wide and 105 mm deep construction joint on every X-sleepers in linning for Providing & filling of proportion 80 kg hot bitumen, 01 kg cement and 0.25 cum coarse sand with including cost of all material, labour, T & P etc. required for proper completion of work. But Excluding Cost of GST | 212.06 | RM | - | - |
| 0.0 | Earth work for maintaning the channel section at linning point all type of soil all lead & lift upto 1.5 m, manual compaction and including cost of all labour, material, T&P etc. required for proper completion of work. But excluding Cost of GST. | 54.39 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Bid_Documant.pdf
Tender Documents • 1.76 MB
BOQ_2212453.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].