| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹67,775.33Admitted-Finance SARASWATHY VILASAM PERUKAVU P O THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | -7.00% | ₹67,775.33 | L1 | Admitted-Finance |
| 2 | L2₹73,605.47+₹5,830.14 (8.60%)Admitted-Finance THIRUVANANTHAPURAM KERALA 695141 UDYAM KL 12 0001798 32AAGCT1693K1Z4 B R | THIRUVANANTHAPURAM | KERALA | 695141 | +1.00% | ₹73,605.47+₹5,830.14 (8.60%) | L2 | Admitted-Finance |
Tender Value
₹72,876
EMD Value
₹1,900
Closing Date
11 Aug 2026, 5:00 pmClosed
Assistant Engineer
Office of TheAssistant Engineer 110kV SubStation TERLS Kerala State Electricity Board Ltd Thumba Thiruvananthapuram
Providing New LED Yard Lights at 110 kV TERLS Substation Phase 1 Installation (2 Light Poles) Including Associated Civil, Cabling and Earthing Works (Financial Year 2025-26)
2026_KSEB_828958_4
06(E)/25-26/AE-TERLS dated 12-01-2026
Open Tender
Miscellaneous Works
Percentage
30 days
110kV substation, TERLS
bidder should have experience in stone masonry, painting of building or masonry works or Other major Civil works in substations and satisfactorily completed similar works in any Government or Public Sector Enterprise during the last five years as on
5 documents required · 5 mandatory
₹590
₹1,900
19 Aug 2026
21 Jul 2026
17 Aug 2026
21 Jul 2026
11 Aug 2026
21 Jul 2026
21 Jul 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.8.1 : Earth work in
excavation by mechanical
means (Hydraulic excavator)
/manual means in foundation
trenches or drains (not
exceeding 1.5 m in width or
10 sqm on plan), including
dressing of sides and
ramming of bottoms, lift up
to 1.5 m, including getting
out the excavated soil and
disposal of surplus excavated
soil as directed, within a lead
of 50 m.All kinds of soil
(cost index(c) : 1.4766
included in Rate) | 0.89 | meter cube | 367.73 | ₹327.28 |
| 2 | 4.1.6 : Providing and laying
in position cement concrete
of specified grade excluding
the cost of centering and
shuttering - All work up to
plinth level:1:3:6 ( 1 cement :
3 coarse sand : 6 graded
stone aggregate 40 mm
nominal size) (cost index©: 1.4766 included in Rate) | 0.12 | meter cube | 8,550.46 | ₹1,026.06 |
| 3 | 5.9.1 : Centering and
shuttering including strutting,
etc. and removal of form
for:Foundations, footings,
bases of columns, etc for
mass concrete (cost index(c)
: 1.4766 included in Rate) | 5.54 | Sq. meter | 394.74 | ₹2,186.86 |
| 4 | 5.1.2 : Providing and laying
in position specified grade of
reinforced cement concrete,
excluding the cost of
centering, shuttering,
finishing and reinforcement -
All work up to plinth
level:1:1:5:3 (1 cement 1.5
coarse sand :3 graded stone
aggregate 20 mm nominal
size (cost index(c) : 1.4766
included in Rate) | 0.96 | meter cube | 10,721.86 | ₹10,292.99 |
| 5 | Installation of 7 m Octagonal
Yard Light Pole (Material
supplied by KSEB) (cost
index(e) : 1.3424 included in
Rate) | 2 | Nos | 1,734.56 | ₹3,469.12 |
| 6 | Supplying and fixing 5 amps
to 32 amps rating, 240/415
volts, "C" curve, miniature
circuit breaker suitable for
inductive load of following
poles in the existing MCB
DB complete with
connections, testing and
commissioning etc. as
required. Double pole (cost
index(e) : 1.3424 included in
Rate) | 4 | Nos | 772.08 | ₹3,088.32 |
| 7 | 5.22.6 : Steel reinforcement
for R.C.C work including
straightening, cutting,
kg 114.92 48 5516.34 CONTR
bending, placing in position
and binding all complete
upto plinth levelThermo -
Mechanically Treated bars of
grade Fe-500D or more (cost
index(c) : 1.4766 included in
Rate) | 48 | kg | 114.92 | ₹5,516.16 |
| 8 | Uncoiling 4/2 core 2.5sqmm
control cable (armored or
unarmored) from cable
drums and cutting to required
length and laying through
trench/pipe/cable tray neatly
and carefully including for
providing loops wherever
necessary and cable marker
at both ends of cable as per
direction of departmental
staff at site. (cost index(e) :
1.3424 included in Rate) | 130 | metre | 44.21 | ₹5,747.3 |
| 9 | Laying of departmentally
supplied GI strip/Copper
strip of suitable size
including cleaning and neatly
bending of strips ,cutting,
removing of metal/earth in
the yard and burying earth
strip to the required depth redoing the yard metalling as
per the direction of the
departmental officers. (cost
index(e) : 1.3424 included in
Rate) | 15 | meter | 214.62 | ₹3,219.3 |
| 10 | Welding one end of the
bended GI strip of size
50x6mm with the riser of the
already laid earth mat,
welding 150mm in length,
6mm thick on both sides &
end of the strip & other end
of the strip with yard structure at 2 points 50mm
apart each welding points
having 50mm length and
6mm thick on both sides &
end of the strip including the
charges for connecting the
strip with structure using
bolted joints as per the
directions of the department
officers. Charges includes
hire charges of DC arc
welding set, current charges,
cost of low hydrogen content
DC arc welding
electrodes(No.E7018) cost of
anti corrosive paint etc.
complete. (cost index(e) :
1.3424 included in Rate) | 2 | No | 604.49 | ₹1,208.98 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tendernotice_2.pdf
PDF • 0.15 MB
Tendernotice_3.pdf
PDF • 0.11 MB
NIT.pdf
Tender Documents • 0.20 MB
Boundencompressed.pdf
Tender Documents • 0.07 MB
BOQ_1457186.xls
BOQ • 0.37 MB
BIDcompressed.pdf
Tender Documents • 0.41 MB
Agreementcompressed.pdf
Tender Documents • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .