| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAccepted-AOC KALLIYOOR P O THIRUVANANTHAPURAM 42 KERALA | 42 | ₹20.1 L | L1 | Accepted-AOC Agreement Executed |
| 2 | L2₹20.7 LRejected-Finance | ₹20.7 L | L2 | Rejected-Finance 2nd lowest |
| Sl No | Description | Qty | Unit | SARATH S L1 | Aravind G S L2 |
|---|---|---|---|---|---|
| 1.00Road work- 20mm CC Patch repair works | |||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 32 | cum | 2,484.81 ₹79,513.92 | 2,565.88 ₹82,108.16 |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 99.5 | cum | 2,569.66 ₹2.6 L | 2,653.52 ₹2.6 L |
| 1.00 | 55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 31.5 | cum | 2,654.53 ₹83,617.70 | 2,653.52 ₹83,585.88 |
| 1.00 | 55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 5 | cum | 9,089.44 ₹45,447.20 | 9,386.04 ₹46,930.20 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 12 | cum | 5,364.22 ₹64,370.64 | 5,539.27 ₹66,471.24 |
| 1.01 | 55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 20 | cum | 2,957.67 ₹59,153.40 | 3,054.19 ₹61,083.80 |
| 1.01 | 55.1.a:Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. <br> By Manual Means. | 3,500 | sqm | 249.53 ₹8.7 L | 257.67 ₹9.0 L |
| 1.01 | OD266522/2025-2026:Tipper for removal of all debris, branches and waste materials away from site | 3 | Day | 6,365.07 ₹19,095.21 | 6,572.77 ₹19,718.31 |
| 1.01 | OD266523/2025-2026:Engaging man mazdoor | 12 | each | 1,094.79 ₹13,137.48 | 1,130.51 ₹13,566.12 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
5 Feb 2026, 2:00 pmClosed
executive engineer
Roads division p m g thiruvananthapuram
GENERALAttukal Ponkala2026Urgent patch repair works in East fort Killippalam road Chala market roadAttukal Ponkala2026Urgent patch repair works in East fort Killippalam road Chala market road and other allied worksGeneral Civil Work
2026_PWD_832253_1
PWD/RB/TR/138/2026_5_1_1/1
Open Tender
Civil Works - Roads
30 days
Thiruvananthapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
11 Feb 2026
30 Jan 2026
7 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
Road work- 20mm CC Patch repair works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.1.a:Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. <br> By Manual Means.
OD266522/2025-2026:Tipper for removal of all debris, branches and waste materials away from site
OD266523/2025-2026:Engaging man mazdoor
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.7.1:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade.
5.10.1.a:Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade, and cross fall using crushed stone chipping of 6.7 mm size and bitumen (VG-30) @ 9.8 kg per 10 sqm
Drain maintenence work
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
OD266539/2025-2026:Lifting and Replacing the old RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
OD266541/2025-2026:Cleaning chocked up side drain by manual means and depositing the waste materials for a minimum distance of 5 KM lorry conveyance as per clause 305.etc. complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1398875.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
preliminaryagreement.pdf
Tender Documents • 0.13 MB
Epay.pdf
Other Document • 0.06 MB
BID.pdf
Tender Documents • 1.63 MB
form_of_tender.pdf
Other Document • 0.18 MB
AFFI.pdf
Other Document • 0.26 MB
integrity_pact.pdf
Other Document • 0.05 MB
BOQ_1398875.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid