Loading…
Loading…
Tender Value
₹7.6 L
EMD Value
₹18,966
Closing Date
6 Oct 2026, 6:00 pm
Assistant Engineer
O/oAssistant Engineer LID EW section T V puram
Annual Plan-PRO NO 94/26-27 VATTAYIL THEVAREZHATH ROAD CONSTRUCTION-IN TVPURAM GP
2026_LSGD_873047_1
14/AE/TVPM/26-27
Open Tender
Civil Works - Roads
Item Rate
180 days
T V Puram
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,675
Yes
₹18,966
Yes
26 Sept 2026
26 Sept 2026
8 Oct 2026
26 Sept 2026
6 Oct 2026
26 Sept 2026
26 Sept 2026 - 6 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PROJ.NO. 45/2025-26 CONCRETING OF S C WORK SHED ROAD WARD 5 | |||||
| 1.001 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 167.31 | cum | - | - |
| 1.002 | OD55699/2026-2027:QUARRY MUCK Filling (with Roller Consolidation) by spreading in uniform layers on prepared surface and compacting by three wheel 80-100 KN static road roller to achieve the desired density etc. complete as per Technical Specification Clause 408. Using Quarry waste (MORD) | 78.59 | cum | - | - |
| 1.003 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 76.05 | cum | - | - |
| 1.004 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 507 | sqm | - | - |
| 1.005 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 507 | sqm | - | - |
| 1.006 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 507 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Priliminary.pdf
Tender Documents • 0.26 MB
SBD.pdf
Tender Documents • 0.96 MB
Affidavit.pdf
Tender Documents • 0.24 MB
Formoftender.pdf
Tender Documents • 0.26 MB
Epayment.pdf
Other Document • 0.24 MB
Integrity.pdf
Other Document • 0.24 MB
BOQ_1480861.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .