Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹3.7 L+₹18,088.22 (5.16%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹3.8 L+₹27,255.68 (7.77%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹4.1 L+₹57,813.64 (16.5%)Admitted-Fee/PreQual/Technical/Finance NOT AVAILABLE | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | PRAVEEN. T L2 | K. MANOHARAN L1 | SURENDRABABU C L4 | PATHIRIYAD LABOUR CONTRACT COOPERATIVE SOCIETY L3 |
|---|---|---|---|---|---|---|---|
| 1.00Building | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 33.51 | cum | 299.75 ₹10,044.02 | 285.04 ₹9,551.12 Lowest | 332.05 ₹11,126.33 | 307.2 ₹10,293.66 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.64 | cum | 1,774.75 ₹1,135.84 | 1,687.69 ₹1,080.12 Lowest | 1,965.98 ₹1,258.23 | 1,818.88 ₹1,164.08 |
| 1.00 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 22.68 | kg | 4.87 ₹110.45 | 4.64 ₹105.24 Lowest | 5.4 ₹122.47 | 5 ₹113.4 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.13 | cum | 6,610.32 ₹846.12 | 6,286.02 ₹804.61 Lowest | 7,322.59 ₹937.29 | 6,774.69 ₹867.16 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.96 | cum | 8,740.08 ₹8,390.48 | 8,311.3 ₹7,978.85 Lowest | 9,681.84 ₹9,294.57 | 8,957.41 ₹8,599.11 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.64 | sqm | 321.77 ₹2,780.09 | 305.99 ₹2,643.75 Lowest | 356.45 ₹3,079.73 | 329.78 ₹2,849.3 |
| 1.01 | OD345189/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for
foundation and basement including all cost of materials, labour charges etc. (MOD 50.6.7.1 of DAR) | 12.44 | cum | 5,799.65 ₹72,147.65 | 5,515.12 ₹68,608.09 Lowest | 6,424.56 ₹79,921.53 | 5,943.86 ₹73,941.62 |
| 1.01 | OD345192/2025-2026:Providing and laying 60mm thick factory made cement concrete interlocking paver block made by block machine with
strong vibratory compaction of approved size design and shape laid in required colour and pattern over and including
50mm thick compacted bed of stone aggregate 6mm nominal size filling the joints with fine sand etc. all complete as
per the direction of Engineer-in-charge. vertically including cost and conveyance of all materials all labour charges,
fabricating etc. complete. (Modified 16.68 by replacing Sand bed 6mm stone aggregate bed) | 99.25 | sqm | 986.77 ₹97,936.92 | 938.36 ₹93,132.23 Lowest | 1,093.08 ₹1,08,488.19 | 1,011.3 ₹1,00,371.53 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.53 | cum | 7,696.15 ₹4,102.05 | 7,318.58 ₹3,900.8 Lowest | 8,525.42 ₹4,544.05 | 7,887.52 ₹4,204.05 |
Tender Value
₹4.1 L
EMD Value
₹10,324
Closing Date
17 Sept 2026, 3:00 pmClosed
Assistant Engineer Vengad GP
Assistant Engineer Vengad GP
Annual Plan- Vengad GP Project No.378/2025-26-COMPLETION WORK OF MAILULLISUBCENTRE
2026_LSGD_868125_15
TEN01/2026-27/AE/LIDEW/VGD
Open Tender
Civil Works - Buildings
Item Rate
Vengad GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹910
Yes
₹10,324
Yes
1 Oct 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 33.51 | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.64 | cum | - | - |
| 1.003 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 22.68 | kg | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.13 | cum | - | - |
| 1.005 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.96 | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.64 | sqm | - | - |
| 1.007 | OD345189/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for
foundation and basement including all cost of materials, labour charges etc. (MOD 50.6.7.1 of DAR) | 12.44 | cum | - | - |
| 1.008 | OD345192/2025-2026:Providing and laying 60mm thick factory made cement concrete interlocking paver block made by block machine with
strong vibratory compaction of approved size design and shape laid in required colour and pattern over and including
50mm thick compacted bed of stone aggregate 6mm nominal size filling the joints with fine sand etc. all complete as
per the direction of Engineer-in-charge. vertically including cost and conveyance of all materials all labour charges,
fabricating etc. complete. (Modified 16.68 by replacing Sand bed 6mm stone aggregate bed) | 99.25 | sqm | - | - |
| 1.009 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.53 | cum | - | - |
stage.html
html • 0.02 MB
finance_1471230.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.24 MB
Tendernotice_3.pdf
PDF • 0.25 MB
PA.pdf
Tender Documents • 0.25 MB
BOQ_1471230.xls
BOQ • 0.31 MB
FOT.pdf
Tender Documents • 0.25 MB
affdvt.pdf
Tender Documents • 0.23 MB
SBD.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .