Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.7 L+₹2,562.07 (0.70%)Admitted-Fee/PreQual/Technical/Finance ERINJAD GRAMA PANCHAYATH | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.7 L+₹5,978.16 (1.63%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.8 L+₹11,529.31 (3.14%)Admitted-Fee/PreQual/Technical/Finance KERALA KERALA | IDUKKI | KERALA | 685501 | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.3 L
EMD Value
₹10,675
Closing Date
31 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER
LID AND EW SECTION PERINJANAM
ROAD CONSTRUCTION
2026_LSGD_881889_1
ET02/AEPJM/16/26-27
Open Tender
Civil Works - Roads
Percentage
270 days
PERINJANAM GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹945
Yes
₹10,675
Yes
2 Nov 2026
24 Oct 2026
2 Nov 2026
24 Oct 2026
31 Oct 2026
24 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ROAD RENOVATION | |||||
| 1.001 | OD78624/2026-2027:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in
layers, leveling the top at site and consolidation by ramming, etc complete for improving the
CBR value of subgrade. | 48 | cum | 947.54 | ₹45,481.92 |
| 1.002 | 3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 72 | cum | 650.34 | ₹46,824.48 |
| 1.003 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 36 | cum | 2,484.07 | ₹89,426.52 |
| 2SIDE PROTECTION | |||||
| 2.001 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 12.9 | cum | 441.5 | ₹5,695.35 |
| 2.002 | OD78707/2026-2027:d1529023/2021_2022 :Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set
including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc
complete ( Modified data 60.2.2) | 12 | hour | 474.87 | ₹5,698.44 |
| 2.003 | OD78704/2026-2027:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in
layers, leveling the top at site and consolidation by ramming, etc complete for improving the
CBR value of subgrade. | 2.4 | cum | 947.54 | ₹2,274.1 |
| 2.004 | OD78716/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site(Modified data 60.7.1) | 31.56 | cum | 4,258.1 | ₹1,34,385.64 |
| 2.005 | OD79595/2026-2027:Stone masonry in cement mortar for substructure complete as per drawing &amp;amp; technical
specification Clauses 702, 704, 1202 and 1204&amp;lt;br&amp;gt; III. Random rubble masonry
&amp;lt;br&amp;gt;(iii) In cement mortar (1:5) | 0.63 | cum | 8,494.99 | ₹5,309.37 |
stage.html
html • 0.02 MB
finance_1501430.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd24227.pdf
Tender Documents • 1.85 MB
BOQ_1501430.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .