| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC | ₹3.1 L | 1 | Accepted-AOC 1 |
| 2 | 2₹3.3 LRejected-Finance | ₹3.3 L | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | RANJITH T M L2 | MUJEEB PP L1 |
|---|---|---|---|---|---|
| 1.00Nirappam Stadium Stage Construction | |||||
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 8.11 | cum | 590.92 ₹4,793.54 | 543.28 ₹4,407.09 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.8 | cum | 7,140.83 ₹34,275.98 | 6,565 ₹31,512 |
| 1.00 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 25.58 | cum | 7,339.47 ₹1,87,773 | 6,748 ₹1,72,640.83 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 8.11 | cum | 286.67 ₹2,325.47 | 263.09 ₹2,134.19 |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 68.69 | cum | 656.55 ₹45,097.11 | 602.77 ₹41,403.07 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 152.28 | kg | 160.61 ₹24,457.69 | 148 ₹22,537.44 |
| 1.01 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 79.21 | sqm | 422.36 ₹33,455.14 | 388.35 ₹30,761.2 |
Tender Value
₹3.4 L
EMD Value
₹8,474
Closing Date
21 Oct 2025, 3:00 pmClosed
Assistant Engineer
OFFICE OF THE ASSISTANT ENGINEER LSGD SECTION CHERUVANNUR GP
Annual Plan-Cheruvannur Panchayat 2025-26- Pro no 242/26 Construction of stage at Nirappam Stadium
2025_LSGD_808109_13
AE/LSGD/TN/3/2025-26
Open Tender
Civil Works - Roads
270 days
LSGD SECTION CHERUVANNUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹750
Yes
₹8,474
Yes
8 Jan 2026
13 Oct 2025
23 Oct 2025
13 Oct 2025
21 Oct 2025
13 Oct 2025
Amount
Nirappam Stadium Stage Construction
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
RANJITH T M (BID ID -2395332)
Bidder Name
MUJEEB PP
RANJITH T M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.07 MB
Tendernotice_3.pdf
PDF • 0.33 MB
Tendernotice_4.pdf
PDF • 0.04 MB
Tendernotice_5.pdf
PDF • 0.04 MB
Tendernotice_6.pdf
PDF • 0.10 MB
nit242.pdf
Tender Documents • 0.03 MB
sbd242.pdf
Tender Documents • 2.68 MB
BOQ_1348396.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid