Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | +4.11% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹2,275.77 (0.84%)Admitted-Finance | +4.98% | ₹2.7 L+₹2,275.77 (0.84%) | L2 | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹5,200
Closing Date
1 Sept 2026, 5:00 pmClosed
Executive Engineer HPPWD Division Kotla Behar
Executive Engineer HPPWD Division Kotla Behar
Restoraton of rain damages on Didian to Gurala road Km. 0/0 to 3/800 (SH C/o R/wall at RD 2/650 to 2/670).
2026_PWD_142073_10
2659-70 dt 20.08.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Executive Engineer HPPWD Division Kotla Behar
Please refer Tender documents.
15 documents required · 15 mandatory
₹350
₹5,200
16 Sept 2026
27 Aug 2026
2 Sept 2026
27 Aug 2026
1 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation for all types of structures such as retaining walls, breast walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, including saturated soil comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown on the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and obstructions necessary for placing the foundations, trimming, leveling ramming and watering bottom of excavation and back filling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 15cm (fifteen centimeter) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and MORD Technical Specification clause 305.1 and as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 37.75 | Cubic metre | 210 | ₹7,927.5 |
| 2 | Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate) 40 mm (forty millimetre) nominal size.in retaining wall including the cost of centering, shuttering and finishing complete as per approved drawing, design, specifications and as per directions and entire satisfaction of the Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 75.51 | Cubic metre | 3,050 | ₹2,30,305.5 |
| 3 | Providing weep holes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimetres) diameters P.V.C. pipe extending through the full width of the structure with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specifications Clause 614, 709, 1204.3.7 , as per direction of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidental. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 30 | Numbers | 200 | ₹6,000 |
| 4 | Back filling behind abutment, wing wall and return wall complete as per drawing & Technical Specification Clause-1204.3.8 Granular material and as per the entire satisfaction and direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 20.41 | cubic metre | 850 | ₹17,348.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.39 MB
10.pdf
Tender Documents • 3.30 MB
BOQ_210950.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .