| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.5 L+₹69,260 (12.0%)Rejected-AOC NULL | L2 | Rejected-AOC L2 | |
| 3 | L3₹6.5 L+₹78,385 (13.6%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹7.7 L+₹2.0 L (34.1%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹8.3 L
EMD Value
₹20,795
Closing Date
10 Mar 2020, 2:00 pmClosed
The Assistant Executive Engineer
PWD Bridges Sub division, Ernakulam, Kakkanad
The bridge having span of 19.6m and carriage way width of 7.2m with footpath 0.65m on one side.The estimate for Soil investigation is prepared herewith giving provisions for 6nos.of bore holes 4nos.on shore and 2nos. under water.
2020_PWD_346774_1
PWD/2019-2020/10833/BrSdnEklm
Open Tender
Civil Works - Bridges
Item Rate
90 days
Kakkanad
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,835
Yes
online
₹20,795
Yes
18 Jun 2020
27 Feb 2020
13 Mar 2020
27 Feb 2020
10 Mar 2020
27 Feb 2020
Amount
Investigation Work
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.9.1 : Erecting platform over 2 nos of 2nd Class Boat USING Mango wood planks of of not less than 30 mm thick, Mango wood joists of 100mm x 70mm at 60cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete excluding hire of boats (A Platform of Minimum size 6.00m x 5.00m will be required)Erecting platform over 2 nos of 2nd Class Boat USING Mango wood planks of of not less than 30 mm thick, Mango wood joists of 100mm x 70mm at 60cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete excluding hire of boats (A Platform of Minimum size 6.00m x 5.00m will be required)
56.10 : Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.3.c.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.3.d.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
od16005/2019_2020 : Boring with rotary power drilling equipment in all types of soil having N value greater than 50 excluding hard rock soft rock, or medium rock for strata at any depth including conducting necessary S.P.T and recovery of undisturbed soil samples at intervals in ordinary soil in land (Data approved by CE administration from KHRI) .
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In land.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.3.a.2 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For under water.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.
56.3.b.2 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For under water.Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.
56.3.c.2 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For under water.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For under water.
56.3.d.2 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For under water.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For under water.
od16006/2019_2020 : Boring with rotary power drilling equipment in all types of soil having N value greater than 50 excluding hard rock soft rock, or medium rock for strata at any depth including conducting necessary S.P.T and recovery of undisturbed soil samples at intervals in ordinary soil in water (Data approved by CE administration from KHRI) .
56.5.b : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In water.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In water.
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
56.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
56.11.c : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)<br>Additional set for machine boring(extra for bore holes exceeding 5 nos)Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)Additional set for machine boring(extra for bore holes exceeding 5 nos)
56.12.a : Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.14.a : Cross section details:- River.Cross section details:- River.
56.15.a : Hydraulic Velocity Calculation:- River.Hydraulic Velocity Calculation:- River.
56.16 : Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
G S Infrastructure
Babu Mathew T M
SPREADS FOUNDATION
Bidder Name
Babu Mathew T M
Esteem Developers (P) Limited
G S Infrastructure
SPREADS FOUNDATION
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_485862.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .