Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance C 5 2ND FLOOR R K TOWER PLOT NO 21 22 SECTOR 04 VAISHALI GHAZIABAD 201012 MOB 8377811395 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 8 C 1 SECTOR NO 21 MIHAN AREA NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | Admitted-Finance |
| 4 | Admitted-Finance 1ST FLOOR YMCA CULTURAL CENTER CUM LIBRARY BUILDING 1 JAI SINGH ROAD NEW DELHI 110001 INDIA | NEW DELHI | NEW DELHI | DELHI | 110001 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
15 Jun 2022, 11:00 amClosed
Chief Engineer - Regional Officer, MoRTH Lucknow
O/o The Chief Engineer-Regional Office, Ministry of Road Transport and Highways, N.H. Bhawan, Biotech Chowk, Lucknow Ring Road, Vikas Nagar, Lucknow 226022
Consultancy services for preparation of Detailed Project Report (DPR) for Construction of 04 lane Elevated Corridor/ Double Decker flyover in the District of Prayagraj.
2022_MoRTH_685527_1
CE-RO/LKO/DPR/PIU-PRG Dated.25.04.2022
Open Tender
Consultancy
Lump-sum
300 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
AS PER BID DOCUMENT
Exempted
Chief Engineer - Regional Office, MoRTH Lucknow
28 Jul 2022
25 Apr 2022
16 Jun 2022
25 Apr 2022
15 Jun 2022
25 Apr 2022
24 May 2022
Amount
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixining boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total Cost net of Tax:
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Total Cost net of GST:
Sub Total Including GST
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
Detailed Topographic surveys using mobile /aerial LiDAR or betterTechnology.
Description of Work / Item(s)
Amount
Procuring and Fixing boundary pillars and its installation , complete in all respect as per IRC:25,1967:Whereve the proposed alignment follows the exissting alignment, the boundary pillars shall be fixed at an interaval of 200m on either side of proposed right of way. Wherever there is a proposal of realignment of the existing Highway and/or construction of new bypass, consutant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval (lumsum)
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land revenue inspector/officer/equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring)
a) Boring in all type of soils (other than hard rock) ,1500m (for project of length <110km ) or 2000m( for project of length >110 km ) ,Qty. in m.
b)Boring in hard rock ,200m(for project of length <110km ) or 300m( for project of length >110 km ) ,Qty. in m.
Sub Total
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Description of Work / Item(s)
Amount
Lumsum
Inland Travel in Home Country (Fixed Costs)
Description Lump Sum RATE Amount
Airlines
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Amount
Miscellaneous expenses
Sub Total for Mobilization and Demobilization
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum Senior Bridge Engineer
Bridge Structural Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Senior Geologist
Environmental Specialist
Quantity Surveyor/Documentation Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment)
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Staff 7
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The rent cost includes maintenance, Cleaning, repairs, etc.
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies computer
Computer Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
RODIC CONSULTANTS PVT. LTD.
Holtec Consulting Private Limited
K and J Projects Pvt Ltd
STUP CONSULTANTS PVT. LTD.
Chaitanya Projects Consultancy Private Limited
Holtec Consulting Private Limited
Chaitanya Projects Consultancy Private Limited
RODIC CONSULTANTS PVT. LTD.
STUP CONSULTANTS PVT. LTD.
K and J Projects Pvt Ltd
RODIC CONSULTANTS PVT. LTD.
Holtec Consulting Private Limited
K and J Projects Pvt Ltd
Chaitanya Projects Consultancy Private Limited
STUP CONSULTANTS PVT. LTD.
RODIC CONSULTANTS PVT. LTD.
Holtec Consulting Private Limited
K and J Projects Pvt Ltd
STUP CONSULTANTS PVT. LTD.
Chaitanya Projects Consultancy Private Limited
Spectrum Techno Consultants Pvt Ltd
K and J Projects Pvt Ltd
Chaitanya Projects Consultancy Private Limited
RODIC CONSULTANTS PVT. LTD.
STUP CONSULTANTS PVT. LTD.
K and J Projects Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Holtec Consulting Private Limited
Chaitanya Projects Consultancy Private Limited
RODIC CONSULTANTS PVT. LTD.
STUP CONSULTANTS PVT. LTD.
K and J Projects Pvt Ltd
Chaitanya Projects Consultancy Private Limited
RODIC CONSULTANTS PVT. LTD.
Spectrum Techno Consultants Pvt Ltd
RODIC CONSULTANTS PVT. LTD.
Holtec Consulting Private Limited
STUP CONSULTANTS PVT. LTD.
Spectrum Techno Consultants Pvt Ltd
Chaitanya Projects Consultancy Private Limited
Spectrum Techno Consultants Pvt Ltd
Holtec Consulting Private Limited
K and J Projects Pvt Ltd
STUP CONSULTANTS PVT. LTD.
Chaitanya Projects Consultancy Private Limited
Holtec Consulting Private Limited
RODIC CONSULTANTS PVT. LTD.
Chaitanya Projects Consultancy Private Limited
K and J Projects Pvt Ltd
STUP CONSULTANTS PVT. LTD.
RODIC CONSULTANTS PVT. LTD.
Holtec Consulting Private Limited
K and J Projects Pvt Ltd
Chaitanya Projects Consultancy Private Limited
STUP CONSULTANTS PVT. LTD.
RODIC CONSULTANTS PVT. LTD.
Spectrum Techno Consultants Pvt Ltd
Holtec Consulting Private Limited
Chaitanya Projects Consultancy Private Limited
STUP CONSULTANTS PVT. LTD.
Spectrum Techno Consultants Pvt Ltd
Holtec Consulting Private Limited
STUP CONSULTANTS PVT. LTD.
K and J Projects Pvt Ltd
Chaitanya Projects Consultancy Private Limited
Spectrum Techno Consultants Pvt Ltd
Holtec Consulting Private Limited
STUP CONSULTANTS PVT. LTD.
Chaitanya Projects Consultancy Private Limited
K and J Projects Pvt Ltd
RODIC CONSULTANTS PVT. LTD.
Holtec Consulting Private Limited
K and J Projects Pvt Ltd
Chaitanya Projects Consultancy Private Limited
STUP CONSULTANTS PVT. LTD.
RODIC CONSULTANTS PVT. LTD.
STUP CONSULTANTS PVT. LTD.
Chaitanya Projects Consultancy Private Limited
Holtec Consulting Private Limited
K and J Projects Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .