| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 54 PON NAGAR ARAVAKURICHI KARUR | ARAVAKURICHI | KARUR | TAMIL NADU | ₹1.5 Cr | L1 | Accepted-AOC Below Est rate |
| 2 | L2₹1.6 Cr+₹75,337.65 (0.49%)Rejected-Finance 103 B PARI NAGAR CHINNAANDAN KOVIL ROAD KARUR 639 001 | KARUR | TAMIL NADU | 639001 | ₹1.6 Cr+₹75,337.65 (0.49%) | L2 | Rejected-Finance Above Est rate |
| Sl No | Description | Qty | Unit | V.Rasappan & Co L2 | SELVAKUMAR CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Strenthening the road from Chokkalapuram - Poonsolai road Km 0/0-2/35 ( R -338) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 3,073.25 | Sqm | 6 ₹18,439.5 Lowest | 6 ₹18,439.5 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 576.24 | Cum | 141 ₹81,249.84 | 140 ₹80,673.6 Lowest |
| 4.00 | Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete | 2,967.75 | Sqm | 23 ₹68,258.25 Lowest | 23 ₹68,258.25 Lowest |
| 5.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | 840.32 | Cum | 342 ₹2,87,389.44 | 341 ₹2,86,549.12 Lowest |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,335.5 | Cum | 2,941 ₹39,27,705.5 | 2,926 ₹39,07,673 Lowest |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 8,903.24 | Sqm | 86 ₹7,65,678.64 Lowest | 86 ₹7,65,678.64 Lowest |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 8,925 | Sqm | 20 ₹1,78,500 Lowest | 20 ₹1,78,500 Lowest |
| 9.00 | BITUMINOUS Macadam 50 MM THICK USING cmp Providing and laying Bituminious Macadam to 50mm thick using ISS HBG metal as p;er grading with 3.3% of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses of MORTH Part-5 | 445.17 | Cum | 9,749 ₹43,39,962.33 | 9,696 ₹43,16,368.32 Lowest |
| 10.00 | Providing and laying Bituminious concrete to 25 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 223.13 | cum | 12,343 ₹27,54,093.59 | 12,277 ₹27,39,367.01 Lowest |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
3 Sept 2025, 3:00 pmClosed
District Collector/Chairman
II Floor, DRDA, Collectorate, Karur
Karur District - Package No.TN-07-42-Strengthening of 1 Road work in Aravakurichi Block under MGSMT - 2025-2026 - Phase III
2025_RDTN_594128_11
DIPR/4437/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
II Floor, DRDA, Collectorate
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.7 L
II Floor, DRDA, Collectorate, Karur
14 Oct 2025
18 Aug 2025
3 Sept 2025
18 Aug 2025
3 Sept 2025
21 Aug 2025
26 Aug 2025
Amount
Strenthening the road from Chokkalapuram - Poonsolai road Km 0/0-2/35 ( R -338)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS Macadam 50 MM THICK USING cmp Providing and laying Bituminious Macadam to 50mm thick using ISS HBG metal as p;er grading with 3.3% of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses of MORTH Part-5
Providing and laying Bituminious concrete to 25 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supply and installation of two-track sliding uPVCwindows shall utilize uPVC profile sections with an outer wall thickness of 2.30mm (±0.2mm), featuring an outer frame of 60mm x 52mm, a shutter of 66mm x 42mm x 50mm, an interlock of 45mm x 36mm, and a glazing bead of 24.5mm x 16mm. All frame, sash, and mullion profiles shall be reinforced, where required, with a 1mm thick GI steel section, and windows are to be equipped with security devices such as touch locks or crescent locks, nylon rollers, and an aluminium track, all compliant with relevant specifications and departmental directives. Glazing shall consist of 5mm thick Plain or Pinhead glass, secured by TPE (Grey) weather-sealed gaskets, while all corners and mullion joints of the frame and sash shall be mitred cut and fusion welded without mechanical joints, with all welded joints neatly trimmed to a grooved nib finish, ensuring sharpedge- free products. The complete window units shall be fixed into pre-finished openings by drilling and fastening through the outer frame with highquality fasteners, and silicon sealant shall be applied to fill the gap between the wall and window frame for a leak-proof installation and complete finish etc., Complete and as directed by the department officers ("W" Metal Barrier).
Cost of KM Stone
Cost of HM Stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V.Rasappan & Co (BID ID -1447346)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .