| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.4 LAccepted-AOC KOOLETTU HOUSE NEERIKKADU P O KOTTAYAM 686564 | KOTTAYAM | KOTTAYAM | KERALA | 686564 | L1 | Accepted-AOC L1 | |
| 2 | L2₹76.3 L+₹82,383 (1.09%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹79.5 L+₹4.0 L (5.36%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹84.7 L
EMD Value
₹50,000
Closing Date
10 Feb 2025, 6:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER KD DIVISION THANNEERMUKKOM
GENERAL-Kattamada-01-Improvement works to Kattamada pandaraparambu padashekaram in Vechoor panchayath-General Civil Work
2025_Irrig_732785_1
28/EE/KDT/2024-25
Open Tender
Civil Works - Water Works
Item Rate
360 days
Vechoor Panchayath
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
7 Mar 2025
31 Jan 2025
13 Feb 2025
31 Jan 2025
10 Feb 2025
31 Jan 2025
Amount
Dismantling and constructing new retaining wall
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
OD24745/2024-2025:Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD24746/2024-2025:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
OD24813/2024-2025:Supplying and stacking well matured 1/2 split and straight 6 m long coconut post for driving down through various strata bellow bed level including cost coveyance labour charges etc complete.
OD24814/2024-2025:Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
OD31482/2024-2025:Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces and tied to the post with iron wires etc complete as per standard specification.
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Maintenance of Retaining wall
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD23493/2024-2025:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Construction of retaining wall for vachal
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD23489/2024-2025:Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD23490/2024-2025:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Construction of sluice
OD23485/2024-2025:RING BUND Type II Putting up ring bund with earth filled gunny bagsof top width 1.0 m bottom width 2.0 m height 2.0 m side and filling in between with earth to forming bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work .etc. complete.
OD23486/2024-2025:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD23487/2024-2025:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete.
OD24812/2024-2025:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
OD24743/2024-2025:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m
OD24744/2024-2025:Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.8:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
Entrance to Padasekharam
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
OD24326/2024-2025:Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
Thoompu
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
19.6.7:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:600 mm dia R.C.C. pipe
RIYAS NALAPPAD ANDUNHI (BID ID -2101021)
SAJI A KURUVILLA (BID ID -2098397)
Bidder Name
kjthomas
SAJI A KURUVILLA
RIYAS NALAPPAD ANDUNHI
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1170848.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .