| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAccepted-Finance | ₹31.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹31.2 LRejected-Finance | ₹31.2 L | L2 | Rejected-Finance NA |
| Sl No | Description | Qty | Unit | MANISEKARAN KALIYAPERUMAL L1 | N RAMALINGAM L2 |
|---|---|---|---|---|---|
| 1.00 | Strengthening the road @ DS Avenue Road In Nachikurichi Panchayat in Manikandam Block in Tiruchirappalli District under CFC Savings Fund 2025-26
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 398.75 | Sqm | 23.33 ₹9,302.84 | 23.34 ₹9,306.83 |
| 2.00 | Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., | 35.89 | Cum | 340.58 ₹12,223.42 | 340.75 ₹12,229.52 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 149.53 | Cum | 3,168.8 ₹4.7 L | 3,170.39 ₹4.7 L |
| 4.00 | Providing and laying Primer Coat over the WMM surface using 7.00 Kg of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications. | 1,196.25 | Sqm | 87.82 ₹1.1 L | 87.86 ₹1.1 L |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.50 Kg of bitumen emulsion RS-1 of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications. | 1,196.25 | Sqm | 20.71 ₹24,774.34 | 20.72 ₹24,786.30 |
| 6.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 1,196.25 | Sqm | 319.42 ₹3.8 L | 319.58 ₹3.8 L |
| 7.00 | Providing for HM Stone | 2 | Nos | 574.07 ₹1,148.14 | 574.36 ₹1,148.72 |
| 8.00 | Strengthening the road @ Vasan Nagar In Nachikurichi Panchayat in Manikandam Block in Tiruchirappalli District under CFC Savings Fund 2025-26
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 645 | Sqm | 23.33 ₹15,047.85 | 23.34 ₹15,054.30 |
| 9.00 | Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., | 58.05 | Cum | 340.58 ₹19,770.67 | 340.75 ₹19,780.54 |
| 10.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 241.88 | Cum | 3,168.8 ₹7.7 L | 3,170.39 ₹7.7 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
5 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP)
BLOCK DEVELOPMENT OFFICER (VP),MANIKANDAM
Strengthening the road at DS Avenue Road Nachikurichi Panchayat in Manikandam Block in Tiruchirappalli District under CFC Savings Fund 2025-26 and Vasan Nagar In Nachikurichi Panchayat in Manikandam Block in Tiruchirappalli District under CFC Savin
2026_RDTN_667550_4
A3/890/2026 Dt 19-02-2026
Open Tender
Civil Works
30 days
PANCHAYAT UNION OFFICE MANIKANDAM
Refer Tender Notice
5 documents required · 5 mandatory
₹0
₹33,000
Yes
5 Mar 2026
3 Mar 2026
5 Mar 2026
3 Mar 2026
5 Mar 2026
3 Mar 2026
Strengthening the road @ DS Avenue Road In Nachikurichi Panchayat in Manikandam Block in Tiruchirappalli District under CFC Savings Fund 2025-26 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer Coat over the WMM surface using 7.00 Kg of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.50 Kg of bitumen emulsion RS-1 of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Providing for HM Stone
Strengthening the road @ Vasan Nagar In Nachikurichi Panchayat in Manikandam Block in Tiruchirappalli District under CFC Savings Fund 2025-26 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer Coat over the WMM surface using 7.00 Kg of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.50 Kg of bitumen emulsion RS-1 of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Providing for HM Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_804255.xls
BOQ • 1.05 MB
TechnicalBidcommunity.pdf
Tender Documents • 0.30 MB
PriceBidcommunity.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid