Loading…
Loading…
Tender Value
₹8.3 L
EMD Value
₹9,000
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Executive Engineer Panchayat R&B Division Amreli
Construction of Community Hall at Village Pir Khijadiya Taluka.Babra,Dist. Amrel
347078
Tender Notice No.16/2026-27, Sr.No.12
Open
Civil Works - Buildings
Works
Amreli
6 documents required · 5 mandatory · 1 optional
₹900
Executive Engineer Panchayat R&B Division Amreli
₹9,000
20 Sept 2026
20 Sept 2026
20 Sept 2026
28 Sept 2026
20 Sept 2026
Name of Work :- Construction of Community Hall at Village Pir Khijadiya Taluka :-
Babra Dist. Amreli
Bill of Quantities
Memorandum showing items of works to be carried out
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
1 19.000 Cum Excavation for foundation upto 1.50 157.16 Rupees One One
M.depth including sorting out Hundred Fifty Cubic
&stacking of useful materials i.e. Seven and Paise metre
dispositing the excavated stuff up to Sixteen only
All lead (a)Dense or Hard soil.
2 8.000 Cum Excavation for foundation upto 1.5 m 268.92 Rupees Two One
depth including sorting out and Hundred Sixty Cubic
stacking of useful materials and Eight and Paise metre
disposing off the excavated stuff upto Ninety Two only
All lead.(C) Hard Murrum
3 9.000 Cum Providing and laying cement concrete 2932.73 Rupees Two One
1:4:8 (1 cement, 4sand,8 Crushed Thousand Nine Cubic
stone aggregates 40 mm.Nominal Hundred Thirty metre
size)and curing complete, excluding Two and Paise
cost of formwork in(a) Foundation and Seventy Three
4 3.600 Cum Providing and laying ordinary cement 8824.65 Rupees Eight One
concrete1:1.5:3 (1cement,1.5sand, 3 Thousand Eight Cubic
gradedstone aggregates 20 Hundred Twenty metre
mm.Nominal size) and finishing Four and Paise
smooth with curing etc. complete Sixty Five only
excluding cost of form work and
reinforcement for reinforced cement
concrete work in in A) Foundations,
footings, base of columns and mass
5 3.700 Cum Providing and laying ordinary cement 10839.25 Rupees Ten One
concrete1:1.5:3 (1cement, 1.5sand, 3 Thousand Eight Cubic
graded stone aggregates 20 mm Hundred Thirty metre
.Nominal size) and finishing smooth Nine and Paise
with curing etc. complete including the Twenty Five only
cost of formwork but excluding the
cost of reinforcement of R.C.C. work
in Column (iii) Having cross-sectional
area more than 0.085 Sq.M. and up to
6 10.000 Cum Brickwork using common burnt clay 4214.33 Rupees Four One
building brick shaving crushing Thousand Two Cubic
strength not less than 35 Kg/Sqcm. in Hundred Fourteen metre
foundation and plinth in cement mortar and Paise Thirty
1:6(1 Cement ; 6 Fine sand) Three only
Conventional bricks
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
7 22.000 Cum Filling in foundation and plinth with 301.78 Rupees Three One
murrum or selected soil in layers of Hundred One and Cubic
20cm. thickness including watering, Paise Seventy metre
ramming and consolidating etc. Eight only
8 21.000 Cum Brickwork using common burnt clay 4496.05 Rupees Four One
building brick shaving crushing Thousand Four Cubic
strength not less than 35 Kg/Sqcm. in Hundred Ninety metre
super structure Upto floor two level in Six and Paise Five
cement mortar 1:6(1 Cement ; 6 Fine only
9 0.400 Cum Providing and laying cement 7207.30 Rupees Seven One
concrete1:1.5:3 (1cement, 1.5sand, 3 Thousand Two Cubic
gradedstone aggregates20 Hundred Seven metre
mm.Nominal size) and curing and Paise Thirty
complete, including cost of formwork only
in sill and sides (R.C.C. band) but
excluding the cost of reinforcement
upto floor all level
10 0.600 Cum Providing & laying ordinary C.C. 8888.18 Rupees Eight One
1:1.5:3 ( 1 cement ,1.50 course sand, 3 Thousand Eight Cubic
graded stone agg. of 20 mm nominal Hundred Eighty metre
size )and for R.C.C. LINTELS incl. Eight and Paise
Finishing smooth with curring of Eighteen only
formwork but excl. the cost of
reinforcement..for above floor upto
floor all level.
11 0.700 Cum Providing & laying cement concrete 7063.33 Rupees Seven One
1:1.50:3 (1 cement ,1.50 course sand,3 Thousand Sixty Cubic
graded stone agg.of 20 mm nominal Three and Paise metre
size) for reinforcement concrete Thirty Three only
CHHAJJAS not exceeding 10cm.
thickness upto floor two level incl.
finishing the exposed surface with
C.M. 1:3 (1 cement ,3 fine sand) to
give a smooth and ever surface,
centering, formwork and curring
comp.Excl. the cost of
reinforcement.above plinth Upto floor
12 7.300 all level. & laying C.C. 1:1.5:3 (1
Cum Providing 8035.64 Rupees Eight One
cement ,1.5 course sand,3 graded stone Thousand Thirty Cubic
agg.of 20 mm nominal size) and Five and Paise metre
finishing smooth with curring etc. Sixty Four only
comp. incl. the cost of formwork but
excl. the cost of reinforcement for
R.C.C. work in. (A) Beam :- Having
cross sectional Area 0.085 to
Sqm..upto floor all level
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
13 6.000 Cum Providing & laying ordinary cement 4681.83 Rupees Four One
concrete 1:1.50:3 (1 cement ,1.50 Thousand Six Cubic
course sand,3 graded stone agg.of 20 Hundred Eighty metre
mm nominal size) exposed work with One and Paise
curring etc.comp. incl. the cost of Eighty Three only
formwork but excluding the cost of
reinforce ment for R.C.C. work in.
SLAB :- having more then 10cm. and
end upto 13cm. thickness.upto floor all
14 2807.000 Kg Providing TMT Bar FE 500/500D 77.29 Rupees One
reinforcement for R.C.C. work Seventy Seven Kilogra
including bending, binding and placing and Paise Twenty m
in position complete upto floor ALL Eight only
15 6.800 Sqm Providing and laying Green marble 1636.20 Rupees One One
(18 mm thick ) in Jambs & Sills of Thousand Six Squere
Windows and pillers laid on 10 MM Hundred Thirty metre
thick cement mortar 1:3 (using Six and Paise
Sulphate Resistant Cement) (1
Cement - 3 coarse sand) laid and
jointed with grey cement slurry
including rubbing and polishing
16 154.000 Sqm 20 mm thick sand faced cement 342.41 Rupees Three One
plaster on walls upto height 10 Hundred Forty Squere
metres above ground level consisting Two and Paise metre
of 12mm thick backing coat of C.M. Forty One only
1:3 (1-cement : 3-sand) and 8mm
thick finishing coat of C.M. 1:1 (1-
cement : 1-sand) etc. complete.
17 2.500 Sqm Providing and fixing 35 mm. Thick 3916.74 Rupees Three One
Panelled,glazed or Panelled and glazed Thousand Nine Squere
shutters for doors,windows Hundred Sixteen metre
andclearstory windows including and Paise Seventy
anodised alluminiumbutt hinges with Four only
necessary screws and Indian
TeakWood shutters with-(B) Partical
board panells.12mm. thick including
applying primer and two coats of oil
painting etc. complete
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
18 75.000 Sqm Providing 10 mm thick cement plaster 196.27 Rupees One One
in single coat on fair side of Hundred Ninety Squere
Brick/concrete walls for interior Six and Paise metre
plastering upto floor two level and Twenty Seven
finished even and smooth in (I)cement only
mortar 1:3 (1 cement:3 sand) .Upto
floor two level finished even & Smooth
with floating coat of neat cement
19 37.000 Sqm Providing 10 mm thick cement plaster 171.71 Rupees One One
in single coat on brick/concrete walls Hundred Seventy Squere
for interior plastering upto floor two One and Paise metre
level and finished even and smooth in Seventy One only
(i)Cement mortar 1:3 (1-cement:3sand)
for plastering on ceilings and sofits of
stairs upto floor two level instead of
plastering on walls.
20 46.000 Sqm Providing and laying 24" x 24" vitrified 1264.41 Rupees One One
8MM thick tile flooring over 20MM Thousand Two Squere
(average) base of cement mortar 1:6 (1- Hundred Sixty metre
Cement : 6-Coarse Sand) on new Four and Paise
surface or fixing on existing flooring Forty One only
by adhe-sive material including
dismentalling of existing flooring and
jointed with colour cement slurry
including finished with flush pointing
and cleaning the surface etc. complete.
For Light shade
21 154.000 Sqm Finishing wall with weather proof 120.26 Rupees One One
exterior emulsion paint on wall Hundred Twenty Squere
surface(two coats) to give an required and Paise Twenty metre
shape even shade after thoroughly Six only
brushing the surface to remove all dirt,
and remains of loose powdered
materials etc complete
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
22 75.000 Sqm Wall painting (two coats) with plastic 123.44 Rupees One One
emulsion paint of approved brands and Hundred Twenty Squere
manufacture on undecorated wall Three and Paise metre
surfaces to give an even shade Forty Four only
including thorougnly brushinf the
surface free from mortar droppings and
other foreign matter and sand papered
smooth including Applying two coats
of Birla or Asian acrylic lappy (purty)
and two coats of primer of approved
brand and manufacture on new wall
surface to give an even shade
23 53.000 Sqm Ceiling painting (two coats) with 128.97 Rupees One One
plastic emulsion paint of approved Hundred Twenty Squere
brands and manufacture on Eight and Paise metre
undecorated wall surfaces to give an Ninety Seven only
even shade including thorougnly
brushinf the surface free from mortar
droppings and other foreign matter and
sand papered smooth including
Applying two coats of Birla or Asian
acrylic lappy (purty) and two coats of
primer of approved brand and
manufacture on new wall surface to
give an even shade.
24 8.000 Rm Providing, laying and jointing in true 876.90 Rupees Eight One
line and level 110 diametre U.P.V.C Hundred Seventy Running
(Type B) conforming to IS 13592-1992 Six and Paise metre
with one end plain and other end Ninety only
socketed with rubber ring, & fittings
conforming to ISI 14735-1999 of
approved make for drainage system
pipe line, pipe shall be jointed with
each other with rubber lubricant, pipe
shall be fixed on wall using of PVC
clamp of the size 110 mm diametre x
149 mm length x 145 mm heigh at
every 2000 mm center to center or shall
be concealed in walls as directed
including necessary fittings such as
bends, shoes etc. including testing of
pipes and joints and jointed with
adhesive solvent cement including cost
of all materials.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
25 47.000 Sqm Providing and laying broken 779.70 Rupees Seven One
china mosaic flooring for terrace Hundred Seventy Squere
using 12 mm to 20 mm broken Nine and Paise metre
pieces of glazed tiles to be laid over Seventy only
cement mortar 1:3 to plain or slope
and to be tempered to bring
mortar creme out upto surface
using white cement including
rounding off junctions and extending
them upto 15 cm along the
wall,clearing with water and oxalic
acid etc. as directed.
26 7.200 Sqm Providing and fixing Window having 1713.70 Rupees One One
extruded Alluminium Colour anodized Thousand Seven Squere
Section frame main outer size 63.50 x Hundred Thirteen metre
38.10 x 1.95mm (of Jindal Section No. and Paise Seventy
4605, @ Wt. 1.094 Kg./Rmt.) only
horizontal Two Track member size
Jindal Section No. 8687 @ Wt.
Kg./mt.) vertical member of size
Jindal Section No. 8758 @ Wt. of
0.659 Kg./mt.) with Sliding Shttuer of
Horizontal member size 40mm x
18mm x 1.29mm (of Jindal Section No.
8949 @ Wt. of 0.456 Kg./mt.) Vertical
member of size 40mm x 18mm x
1.29mm (of Jindal Section No. 8947 @
Wt. of 0.456 Kg./mt. / Section 8948 @
Wt. 0.457 Kg/mt.) with 5mm thick
transparent bronze colour tinted float
glass with powder coated alluminium
fittings and fixtures and transparent
silicon section glass fixing to frame as
per details etc. complete for window
27 108.000 Kg Providing and fixing M.S. grills of 160.85 Rupees One One
required pattern to wooden frames of Hundred Sixty Kilogra
windows etc. with M.S. flats at and Paise Eighty m
required spacings and frame alround, Five only
square or round bars with round
headed bolts and nuts or by screws.
(B) ORNAMENTAL GRILL
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
28 1.000 No Providing & Fixing Marble Takti of 2020.00 Rupees Two One
Size 60cm x45 m. including carving & Thousand Number
painting the letters related to scheme & Twenty and Paise
Dismentled Material Credit Rs.
will be deducted from 1 St R.A.
Rupees Eight Lakh Twenty Six Thousand Three Hundred Sixty and Paise Thirty only Total
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow
percent ( Should be written in figures and words ) of the estimated rate mentioned above.
Amount of My \ Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division ( D P ) Road & Building Division
Kunkavav Amreli
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
All circular Online.pdf
0.1 SBD.pdf
0.2 BOQ.pdf
0.4 Tender Details No.16-.pdf
0.5 Test Schedule.pdf
0.6 DRG.pdf
0.3 Specification_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .