Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
₹1.6 L
EMD Value
₹4,058
Closing Date
29 Jan 2026, 6:00 pmClosed
Asst Exe Engineer
Asst Exe Engineer,Thrippunithura Municipality
Annual Plan-SO-776 - 25 S0- 689-26 TRIPUNITHURA MUNICIPALITY-KARSHAKA COLONY PUBLIC WELLS RECHARGING-General Civil Work
2026_LSGD_829881_3
PW1-517354/26
Open Tender
Civil Works - Others
Percentage
180 days
Tripunithura
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,058
Yes
17 Apr 2026
23 Jan 2026
31 Jan 2026
23 Jan 2026
29 Jan 2026
23 Jan 2026
Cleaning
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
OD424643/2025-2026:Mancoolie
10.25.1:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete
13.112.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shadeOld work (Two or more coats applied @ 1.43 ltr/ 10 sqm) over existing cement paint surface
13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
OD424642/2025-2026:Provoding and fixing Nylon net on top of well including all charges etc complete
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD427175/2025-2026:Desilting of drains in manual means and depositing with lead up to 50m and lift up to 1.50m.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1394142.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.89 MB
EpaymentForm.pdf
Tender Documents • 0.02 MB
BOQ_1394142.xls
BOQ • 0.32 MB
FOT.pdf
Tender Documents • 0.02 MB
viewsbd.pdf
Tender Documents • 1.76 MB
IntegrityPact.pdf
Tender Documents • 0.01 MB
affdt.pdf
Tender Documents • 0.03 MB
PA.pdf
Tender Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .