Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹88.2 L+₹15.9 L (22.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹90.0 L+₹17.7 L (24.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹90.7 L+₹18.4 L (25.4%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MERAKI CONSTRUCTIONS COMPANY L3 | MS Kargil Engineering and Industries L1 | M/S ALI GHULAM L2 | M/S HILL TOP STEEL FABRICATION L4 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Structral Steel Canopy at site Sitara Zanskar | |||||||
| 1.10 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in: (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS) | 37.82 | CuM | 200 ₹7,564 Lowest | 200 ₹7,564 Lowest | 200 ₹7,564 Lowest | 250 ₹9,455 |
| 1.20 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level using 1:3:6 mix (1 cement: 3 coarse sand: 6 graded Nallah stone aggregate 40mm nominal size) including carriage:
(As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS) | 93.49 | CuM | 6,500 ₹6,07,685 | 6,000 ₹5,60,940 Lowest | 6,700 ₹6,26,383 | 8,000 ₹7,47,920 |
| 1.30 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded including carriage.
(As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS) | 24,399.76 | Kg | 160 ₹39,03,961.6 | 125 ₹30,49,970 Lowest | 155 ₹37,81,962.8 | 147 ₹35,86,764.72 |
| 1.40 | C.G.I. SHEETS ROOFING
Providing corrugated G. S. sheet roofing including vertical/curved surface
fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with
bitumen and G.I limpet washers or with G.I. limpet washers filled with
white lead, including a coat of approved steel primer and two coats of
approved paint on overlapping of sheets complete (upto any pitch in
horizontal/vertical or curved surface)excluding the cost of purlins, rafters 0.63 mm thick with zinc coating not less than 275 gram/m2
(As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS) | 828.07 | SqM | 1,200 ₹9,93,684 | 1,100 ₹9,10,877 Lowest | 1,300 ₹10,76,491 | 1,300 ₹10,76,491 |
| 1.50 | Horizontal Filling and compaction layer after completion . including carriage of materials complete as per drawing and technical specification
(As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS) | 468.4 | CuM | 300 ₹1,40,520 | 100 ₹46,840 Lowest | 300 ₹1,40,520 | 500 ₹2,34,200 |
| 1.60 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stoneaggregate. including carrige
(As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS) | 234.2 | SqM | 450 ₹1,05,390 | 400 ₹93,680 Lowest | 600 ₹1,40,520 | 800 ₹1,87,360 |
| 1.70 | Painting on G.S sheets with synthetic enamel paint of approved band and manufacture of required colour to give an even shade on New work (two or more coats) including a coat of approved steel primer but excluding a
coat of mordant solution.
(As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS) | 936.8 | SqM | 250 ₹2,34,200 | 130 ₹1,21,784 Lowest | 140 ₹1,31,152 | 200 ₹1,87,360 |
| 2.00Construction of Structral Steel Canopy at site Chibra Zanskar | |||||||
| 2.10 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1O sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in:
(As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS) | 24.71 | CuM | 200 ₹4,942 Lowest | 200 ₹4,942 Lowest | 300 ₹7,413 | 250 ₹6,177.5 |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
8 Sept 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE EINGINEER MECHANICAL DIVISION KARGIL
Office of Executive Engineer Mech Div Kargil
Construction of Structural Steel Canopy at Sitara and Chibra Zanskar sites of Mechanical Engineering Department Kargil
2022_PWD_7144_2
MDK/E-NIT/21 OF 2022-23
Open Tender
Civil Works - Others
Turn-key
45 days
Zanskar
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
EXECUTIVE ENGINEER MECHANICAL DIVISION KARGIL
₹2.3 L
Office of Executive Engineer Mech Div Kargil
19 Sept 2022
31 Aug 2022
9 Sept 2022
2 Sept 2022
8 Sept 2022
2 Sept 2022
5 Sept 2022
Amount
Construction of Structral Steel Canopy at site Sitara Zanskar
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in: (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level using 1:3:6 mix (1 cement: 3 coarse sand: 6 graded Nallah stone aggregate 40mm nominal size) including carriage: (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded including carriage. (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
C.G.I. SHEETS ROOFING Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters 0.63 mm thick with zinc coating not less than 275 gram/m2 (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Horizontal Filling and compaction layer after completion . including carriage of materials complete as per drawing and technical specification (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stoneaggregate. including carrige (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Painting on G.S sheets with synthetic enamel paint of approved band and manufacture of required colour to give an even shade on New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution. (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Construction of Structral Steel Canopy at site Chibra Zanskar
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1O sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level using 1:3:6 mix (1 cement: 3 coarse sand: 6 graded Nallah stone aggregate 40mm nominal size) including carrige (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
C.G.I. SHEETS ROOFING Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters 0.63 mm thick with zinc coating not less than 275 gram/m2 (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Horizontal Filling and compaction layer after completion . including carriage of materials complete as per drawing and technical specification (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
Painting on G.S sheets with synthetic enamel paint of approved band and manufacture of required colour to give an even shade on New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution. (As detailed in Annexure D to e-NIT, SCHEDULE OF QUANTITIES / TECHNICAL SPECIFICATIONS)
M/S ALI GHULAM
MERAKI CONSTRUCTIONS COMPANY
M/S HILL TOP STEEL FABRICATION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .